3 3

3 3 3 3 3 3
3 33 3 2
2
3 2
2 2 2
3 2 2 3 2 3
P. LVL. 3#12 P. LVL. 3#12 P. LVL. 3#12 R.C.C. BAND AT PLINTH & LINTEL LVL.
b b
3 3 #8@200 #8@200 #8@200 Lateral ties
Lateral ties
1 1 3 3 3 3 G. LVL. G. LVL. G. LVL. Longitudinal bars

40 x dia
3#12 3#12 3#12 Lateral ties Lateral ties Longitudinal bars

1 3

b
b
1-#12 40 x dia 1-#12
1 3 Vertical bar from Vertical bar from
40 x dia
foundation to terrace lvl foundation to terrace lvl
230 230 230 SECTIONAL PLAN OF R.C.C. BAND AT
FOUNDATION PLAN CORNER JUNCTION OF WALL
SECTIONAL PLAN OF R.C.C. BAND AT

1200

1200

1200
T-JUNCTION
(b = WALL THICKNESS) (b = WALL THICKNESS)

P.C.C. P.C.C. P.C.C.


600 600 760

SEC. AT 1 - 1 SEC. AT 2 - 2 SEC. AT 3 - 3

3#12
LinteL lvl.

150
#8@200
S1 3#12
b
S3 S3
DETAIL OF R.C.C. BAND AT
LINTEL LVL.
(b = WALL THICKNESS)

B1 S2 S1

B1 B1 TYPICAL SECTIONAL DETAILS OF SLAB


0.2 x L1 0.3 x L1 0.3 x L 2

(t = THICKNESS OF SLAB)
0.15xL1 #8@300(Distribution reinf.)
Extra bar of same dia
inbetween two cranked bars

t
0.15xL1 0.15xL1
DETAIL OF SLAB AT GROUND FLOOR ROOF LVL. wall
MAIN BARS OF SLAB
CROSS BARS OF SLAB wall

(i.e.slab at terrace lvl.) L1 L2

TYPICAL CROSS SECTION OF SLAB ALONG SHORTER SPAN OF SLAB


(Refer Table - 4)
REINFORCEMENT
Slab No.

Slab
Sr. No.

Parallel to Shorter Span (Main bars) Parallel to Longer Span (Cross bars)
Thick.
At Bottom face At Top face At Bottom face At Top face
(mm) (Mid Span) Extra bars at support (Mid Span) Extra bars at support
1 S1 125 #10@225c/c #10@225c/c #10@225c/c #10@225c/c
2 S2 125 #10@200c/c #10@200c/c #10@200c/c #10@200c/c
3 S3 125 #10@175c/c #10@175c/c #10@200c/c #10@200c/c

LUCKNOW CIRCLE
[13] P.C.C.(1:4:8) SHALL BE PROVIDED. [4] AT THE JUNCTION OF TWO DIFF. NUMBER OF BEAMS THE HIGHER REINF. SHOULD BE APPLIED TO DEVELOPED BOND BETWEEN BRICK & RCC MEMBER. PROJECT
NOTES:- ARCHITECT:
[GENERAL]
[14] CUTTING,BENDING,FIXING & PLACING OF BARS SHALL BE IN ACCORDANCE
WITH IS - 2502:1968, IS - 5525:1969 & IS - 456:2000 [5]
AT THE SUPPORT SHALL BE ADOPTED.
OVER LAP IN TOP BARS SHALL BE NEAR MID SPAN & IN BOTTOM BARS
CONSTRUCTION OF TOILET BLOCKS AND ACCESS TO
SHALL BE NEAR SUPPORT OR AT SUPPORT DISABLED PERSONS IN THE CENTRALLY PROTECTED
[1] ALL DIMENSIONS ARE IN M.M. UNLESS OTHERWISE MENTIONED.
[2] ONLY FIGURED DIMENSIONS ARE TO BE FOLLOWED NEITHER THE BARS SHALL [FOUNDATION] [6] THE DEPTH OF BEAM/LINTEL M0N0LITHIC WITH SLAB AS SPECIFIED IN SCHEDULE REFERENCES : IS 456 - 2000, IS - 13920, - 1993, IS - 1893 PART (1) : 2002, SP-16 , SP-34 MONUMENTS UNDER ASI IN EASTERN, CENTRAL
SHALL BE INCLUSIVE OF SLAB THICKNESS UNLESS OTHERWISE SPECIFIED
BE COUNTED NOR THE DIMENSIONS SCALED FROM THE DRG. [1] THE LAYOUT OF BUILDING SHALL BE GIVEN FROM THE ARCH. DRG. [7]
ARCH. DRG. NO. - ALL ARCH. DRGS & NORTHERN REGIONS IN INDIA.
[3] ANY DISCREPANCY IN THE DRGS. SHALL BE BROUGHT TO THE NOTICE OF [2] THE DESIGN DATA FOR FOUNDATION HAS BEEN TAKEN FROM SOIL TEST
Consulting Engineers, Planners & Architects
HOOKS SHALL BE 10 X DIA OF BAR OF STIRRUPS SUB. TITLE:
THE ARCHITECT / CONSULTANT AND CLARIFICATION OBTAINED IN WRITING REPORT PROVIDED BY THE CLIENT B-66, Sector-63, Noida - 201401 (UP)
PRIOR TO EXECUTION OF WORK. [3] ALL EXTERIOR WALLS SHALL BE PROVIDED WITH TOE WALL BELOW PLINTH
TOILET BLOCK DESIGN MODULE I(BRICK) Ph.- 0120-4202182, 09999903999
[4] HIGH YIELD STRENGTH DEFORMED BARS OF YIELD STRESS 500 N/MM2 (Fe-500)
WHICH SHALL CONFORM TO1786-1985 SHALL BE USED AS REINFORCEMENT [4]
BEAMS AS TYPICAL DETAIL IS GIVEN
EARTH BELOW FOUNDATION SHALL BE PROPERLY RAMMED & CONSOLIDATED [SLABS] MOUNDS AT BITHOOR, EMAIL: enarchjobs@gmail.com, abcmailin@ gmail.com
[5] CLEAR COVER OF OUTER LAYER REINF. SHALL BE AS FOLLOWS. BEFORE LAYING LEAN CONCRETE. [1] FOR SLAB REINFORCEMENT REFER TABLE-4 (DETAIL OF SLAB REINFORCEMENT )
S.N. DATE DESCRIPTIONS INITIAL
DISTRICT - KANPUR,UP.
(a) FOOTING = 50 mm (b) COLUMN = 40 mm (c) BEAM = 30 mm (TOP & BOTTOM)
OR DIA OF BAR WHICHEVER IS MORE (e) SLAB = 20 mm (f) WAIST SLAB = 20 mm
[COLUMNS] [2] ALTERNATE BOTTOM BARS SHALL BE CURTAILED AT L / 7 OF SPAN
AS SHOWN IN TYP. SECTION OF SLAB
[6] END/SIDE COVER OF ALL REINFORCEMENT IN BEAMS & SLAB = 20 mm. OR DIA [1] TIES IN PORTION OF COL. & BEAM JUNCTION SHALL BE SAME AS END ZONE. DATE DEC. - 16 Executing Agency : STRUCTURAL CONSULTANTS:
[3] EXTRA BARS SHALL BE PROVIDED AT TOP FACE AS SHOWN IN TYP. SECTION SHEET NO.
OF BAR WHICHEVER IS MORE [2] OVER LAPS ARE ALLOWED ONLY AT MIDDLE ZONE OF THE COLUMNS. DRN. Savita Baiswar
[7] THE COVER BLOCK OF CEMENT MORTAR SHALL BE USED TO ENSURE THE REQD. [3] NOT MORE THAN 50 % OF BARS SHALL BE LAPPED AT A SECTION AND
OF SLAB TELECOMMUNICATIONS CONSULTANTS INDIA LTD (TCIL)
[4] THE CROSS REINF./TEMP. REINF. BELOW TOP REINF OF SLAB .I.E.#8@300C/C IS TO CKD. Er Omkar Verma ( A Government of India Enterprise)
COVER OF REINFORCEMENT LAPS SHALL BE STAGGERED.
[8] DEVELOPMENT LENGTH ( Ld ) FOR DIFFERENT DIA METER OF BARS FOR [4] TIES IN PORTION OF COL. BELOW PLINTH BEAM SHALL BE SAME AS END ZONE . [5]
BE PROVIDED JUST BELOW THE MAIN TOP STEEL AS SHOWN IN TYP. SEC.OF SLAB
THE FIRST MAIN BAR OF SLAB SHALL BE PLACED AT 80 MM. OR HALF THE
TCD. ST - 01 TCIL Bhawan, Greater Kailash - I
New Delhi - 110 048. India.,Ph : +91-11-26202020, Fax : +91-11-26242266 B.Tech (Civil), M.Tech (Str) Hons
CONC. MIX OF GRADE M - 20 SHALL BE = 56 X DIA OF BAR [5] VERTICAL BARS OF RCC COLUMN AT TOP SLAB SHALL BE EXTENDED UPTO TOP SPACING SPECIFIED WHICHEVER IS LESS FROM THE FACE OF SUPPORT
SCALE N.T.S.
[9] CONC. MIX FOR R.C.C. WORK SHALL BE OF GRADE M - 20 OF BEAM & BENT INTO BEAM BY DEVELOPMENT LENGTH.
CONFORMING TO I.S. 456 - 2000. [MASONRY WORK] DRG. TITLE: Client : ISO 9001:2008 CERTIFIED COMPANY
[10] NECESSARY FIXTURE FOR ELECTRICAL, PLUMBING, ETC. SHALL BE [BEAMS] [1] 115 TH.(1/2 BRICK) WALL -1:4 CEMENT: SAND MORTAR SHALL BE USED & ARCHEOLOGICAL SURVEY OF INDIA (ASI)
PROVIDED IN SLAB, BEAMS BEFORE EXECUTION AS PER RELEVANT DRGS. [1] FOR LOCATION OF BEAMS REFER SLAB PLAN. #8,1 NOS. BARS AT EVERY 4th COURSE SHALL BE PROVIDED DETAIL OF FOUNDATION PLAN Director General 8/14, Indira Nagar, Lucknow (UP),Tel.- 0522-4049199,+ 91- 9335903324
[11] THE STRUCTURE HAS BEEN DESIGNED FOR SEISMIC ZONE - ........ [2] THE SPACING OF STIRRUPS AT OVERLAPS SHOULD NOT EXCEED 150 MM. C/C [2] 230 TH.(1 BRICK) WALL - 1:6 CEMENT: SAND MORTAR SHALL BE USED.
Janpath, New Delhi - 110011 e-mail :-spanstructures@gmail.com
[12] THE STRUCTURE HAS BEEN DESIGNED FOR G+0=1 STOREY [3] WHERE TWO LAYERS OF REINF. BARS ARE TO BE PROVIDED, SPACER BAR [3] THE VERTICAL FACE OF CONCRETE AT JUNCTION OF WALL & RCC MEMBER
ARE TO BE PROVIDED AT SPACING OF 1000 MM. MAX. AND THE DIA OF THE SHALL BE RAKED TO GIVE A ROUGH SURFACE & 1:4 CEMENT:SAND MORTAR
Web site:- www.spanstructures.in