Professional Documents
Culture Documents
Mastertop TC 941 Installation Manual
Mastertop TC 941 Installation Manual
Mastertop TC 941 Installation Manual
The innovative topcoat with exceptional cleanability and scratch for hard wearing solutions
STEP 3:
FINISHING, CREATING STRUCTURED SURFACE
Note: Before start- All three steps must continue in a continuous process to
ing the application, ensure a wet edge is maintained and the optimum
clean the roll aesthetics are achieved.
thoroughly with
scotch tape to
avoid shedding.
Ensure full
saturation of the
roller to avoid
uneven coverage.
The roller should
be double armed
to ensure even
pressure.
WATCH POINTS
It is important to always work wet in wet when overlapping PACKAGING
otherwise roller marks will be visible in the final finish. MasterTop TC 941 pigmented is supplied in 12 kg
working packs.
A uniform appearance and texture is best achieved by • PTA: 1,2 kg.
ensuring a uniform coverage rate • PTB: 10,8 kg
CONSUMPTION
ca. 0,10 – 0,14 kg/m²
CLEANING AGENT
Uncured material may be removed using MasterSeal 955.
Cured material may only be removed mechanically.
Field service where provided does not constitute supervisory responsibility. Suggestions made by BASF either
NOTE orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since they, and not
BASF, are responsible for carrying out procedures appropriate to a specific application.
BASF Australia Ltd BASF New Zealand Ltd BASF Emergency Advice:
ABN 62008437867 Level 4, 4 Leonard Isitt Drive 1800 803 440 within Australia (24hr)
Level 12 Auckland Airport 2022 0800 944 955 within New Zealand
28 Freshwater Place Auckland, New Zealand
Southbank VIC 3006
Freecall: 1300 227 300 Freecall: 0800 334 877
www.master-builders-solutions.basf.com.au www.master-builders-solutions.basf.co.nz