Professional Documents
Culture Documents
Civil Engineer
Civil Engineer
Civil Engineer
You are a project manager for a civil engineering consultancy. Assess the structures below from the notes you took. For
quick reference for your computer files, you need to find 2 strengths and 2 weaknesses for each of the six structures in
the profiles below. Write the 4 adjectives in the boxes describing the structures and then read the 6 plans on the next
page that you have drawn up and then decide which plan should be applied to which structure.