Any Company • Any Street 21 • 54321 Any Town

Udruzenje "Zelene staze" Any Company


Any Street 21
54321 Any Town

Tel.: +49 123 456-0


Fax: +49 123 456-100
E-Mail: info@any-company.de
Internet: www.any-company.de

Project: Zelene staze - Pecka Location: Bosnia and Herzegovina /


Pecka_Zelene_staze
Project number: 02-IV-2020 !rdbOrtUserDatenText! (Pecka_Zelene_staze)
Grid voltage: 380V (220V / 380V)

System overview

23 x Trina Solar Energy TSM-300PE06H (THE HONEY framed) (07/2019) (PV array 1)
Azimuth angle: -45 °, Tilt angle: 20 °, Mounting type: Roof, Peak power: 6.90 kWp

8 x Trina Solar Energy TSM-300PE06H (THE HONEY framed) (07/2019) (PV array 2)
Azimuth angle: 15 °, Tilt angle: 20 °, Mounting type: Roof, Peak power: 2.40 kWp

1 x STP5.0-3AV-40 1 x STP4.0-3AV-40

PV design data

Total number of PV modules: 31 Spec. energy yield*: 1223 kWh/kWp


Peak power: 9.30 kWp Line losses (in % of PV energy): ---
Number of PV inverters: 2 Unbalanced load: 0.00 VA
Nominal AC power of the PV inverters: 9.00 kW Annual energy consumption: 2,000 kWh
AC active power: 8.84 kW Self-consumption: 1,701.10 kWh
Active power ratio: 95 % Self-consumption quota: 15 %
Annual energy yield*: 11,375.71 kWh Self-sufficiency quota: 71 %
Energy usability factor: 99.9 % Total nominal capacity: 3.00 kWh
Performance ratio*: 86.2 % Annual nominal energy throughputs of 210
the battery:

Signature

*Important: The yield values displayed are estimates. They are determined mathematically. SMA Solar Technology AG accepts no
responsibility for the real yield value which can deviate from the yield values displayed here. Reasons for deviations are various external
conditions, such as soiling of the PV modules or fluctuations in the efficiency of the PV modules.

1/9 Version: 4.21.3.R / 4/14/2020


Inverter designs
Project: Zelene staze - Pecka Location: Bosnia and Herzegovina / Pecka_Zelene_staze
Project number: 02-IV-2020 Ambient temperature:
Annual extreme low temperature: -17 °C
Average high Temperature: 19 °C
Subproject Subproject 1 Annual extreme high temperature: 33 °C

1 x STP5.0-3AV-40 (PV system section 1)

Peak power: 5.10 kWp


Total number of PV modules: 17
Number of PV inverters: 1
Max. DC power (cos φ = 1): 5.18 kW
Max. AC active power (cos φ = 1): 4.85 kW
Grid voltage: 380V (220V / 380V)
Nominal power ratio: 98 %
Dimensioning factor: 105.3 % STP5.0-3AV-40
Displacement power factor cos φ: 1
Full load hours: 1295.0 h

PV design data

Input A: PV array 1
17 x Trina Solar Energy TSM-300PE06H (THE HONEY framed) (07/2019), Azimuth angle: -45 °, Tilt angle: 20 °, Mounting type: Roof

Input A: Input B:
Number of strings: 1
PV modules: 17
Peak power (input): 5.10 kWp ---

Typical PV voltage: 511 V ---


Min. PV voltage: 469 V ---
Min. DC voltage (Grid voltage 220 V): 125 V 125 V

Max. PV voltage: 765 V ---


Max. DC voltage: 850 V 850 V

Max. MPP current of PV array: 9.3 A ---


Max. operating input current per MPPT: 12 A 12 A
Max. input short-circuit current per MPPT: 18 A 18 A
Photovoltaic Output Circuit Current: 9.8 A ---

PV/Inverter partly compatible

PV array and inverter type are only conditionally compatible, since the inverter is oversized in this combination (> 95 %).

For PV systems with 2 or more inverters with integrated active power limitation, taking into account the self-consumption, a
Sunny Home Manager must be used for this function.

2/9 Version: 4.21.3.R / 4/14/2020


Inverter designs
Project: Zelene staze - Pecka Location: Bosnia and Herzegovina / Pecka_Zelene_staze
Project number: 02-IV-2020 Ambient temperature:
Annual extreme low temperature: -17 °C
Average high Temperature: 19 °C
Subproject Subproject 1 Annual extreme high temperature: 33 °C

1 x STP4.0-3AV-40 (PV system section 2)

Peak power: 4.20 kWp


Total number of PV modules: 14
Number of PV inverters: 1
Max. DC power (cos φ = 1): 4.17 kW
Max. AC active power (cos φ = 1): 3.99 kW
Grid voltage: 380V (220V / 380V)
Nominal power ratio: 99 %
Dimensioning factor: 105.3 % STP4.0-3AV-40
Displacement power factor cos φ: 1
Full load hours: 1225.2 h

PV design data

Input A: PV array 1
6 x Trina Solar Energy TSM-300PE06H (THE HONEY framed) (07/2019), Azimuth angle: -45 °, Tilt angle: 20 °, Mounting type: Roof

Input B: PV array 2
8 x Trina Solar Energy TSM-300PE06H (THE HONEY framed) (07/2019), Azimuth angle: 15 °, Tilt angle: 20 °, Mounting type: Roof

Input A: Input B:
Number of strings: 1 1
PV modules: 6 8
Peak power (input): 1.80 kWp 2.40 kWp

Typical PV voltage: 180 V 241 V


Min. PV voltage: 166 V 221 V
Min. DC voltage (Grid voltage 220 V): 125 V 125 V

Max. PV voltage: 270 V 360 V


Max. DC voltage: 850 V 850 V

Max. MPP current of PV array: 9.3 A 9.3 A


Max. operating input current per MPPT: 12 A 12 A
Max. input short-circuit current per MPPT: 18 A 18 A
Photovoltaic Output Circuit Current: 9.8 A 9.8 A

PV/Inverter partly compatible

PV array and inverter type are only conditionally compatible, since the inverter is oversized in this combination (> 95 %).

For PV systems with 2 or more inverters with integrated active power limitation, taking into account the self-consumption, a
Sunny Home Manager must be used for this function.

3/9 Version: 4.21.3.R / 4/14/2020


Wire sizing
Project name: Zelene staze - Pecka Location: Bosnia and Herzegovina / Pecka_Zelene_staze
Project number: 02-IV-2020

Overview

DC LV Total

Power loss at nominal 34.28 W 32.38 W 66.66 W


operation

Rel. power loss at rated 0.34 % 0.36 % 0.70 %


nominal operation

Total cable length 60.00 m 20.00 m 80.00 m

Cable cross-sections 2,5 mm² 1,5 mm² 2,5 mm²


3,5 mm² 3,5 mm²
5,5 mm² 5,5 mm²
1,5 mm²

Graphic

DC cables

Cable material Single length Cross section Voltage drop Rel. power loss

Subproject 1

1 x STP5.0-3AV-40 A Copper 10.00 m 2,5 mm² 1.4 V 0.26 %


PV system section 1
B Copper 10.00 m 2,5 mm² --- ---

1 x STP4.0-3AV-40 A Copper 10.00 m 5,5 mm² 866.9 mV 0.47 %


PV system section 2
B Copper 10.00 m 3,5 mm² 933 mV 0.38 %

Lines LV1

Cable material Single length Cross section Line resistance Rel. power loss

Subproject 1

1 x STP5.0-3AV-40 Copper 10.00 m 1,5 mm² R: 38.222 mΩ 0.39 %


PV system section 1 XL: 0.750 mΩ

1 x STP4.0-3AV-40 Copper 10.00 m 1,5 mm² R: 38.222 mΩ 0.32 %


PV system section 2 XL: 0.750 mΩ

The displayed results are approximate values to give a general indication to users of possible operating results. The results are determined
mathematically. The actual operating results will be dictated significantly by the actual climatic conditions, the actual efficiency, the system
components' operating conditions and the individual consumption behavior and can deviate from the calculated results. SMA Solar
Technology AG therefore assumes no liability in the event of deviations between the calculated and actual operating results.

4/9 Version: 4.21.3.R / 4/14/2020


Design energy management
Project name: Zelene staze - Pecka Location: Bosnia and Herzegovina / Pecka_Zelene_staze
Project number: 02-IV-2020

PV system System Monitoring

Subproject 1
1 x STP5.0-3AV-40
PV system section 1

1 x STP4.0-3AV-40
PV system section 2

5/9 Version: 4.21.3.R / 4/14/2020


Information
Project: Zelene staze - Pecka Location: Bosnia and Herzegovina / Pecka_Zelene_staze
Project number: 02-IV-2020

Zelene staze - Pecka

Subproject 1

1 x STP5.0-3AV-40 (PV system section 1)


PV array and inverter type are only conditionally compatible, since the inverter is oversized in this combination (> 95 %).

For PV systems with 2 or more inverters with integrated active power limitation, taking into account the self-consumption, a
Sunny Home Manager must be used for this function.

1 x STP4.0-3AV-40 (PV system section 2)


PV array and inverter type are only conditionally compatible, since the inverter is oversized in this combination (> 95 %).

For PV systems with 2 or more inverters with integrated active power limitation, taking into account the self-consumption, a
Sunny Home Manager must be used for this function.

6/9 Version: 4.21.3.R / 4/14/2020


Self-consumption (electricity)
Project: Zelene staze - Pecka Location: Bosnia and Herzegovina / Pecka_Zelene_staze
Project number: 02-IV-2020

Information on self-consumption

Load profile: Zelena rijeka


Prosjecna godisnja postrosnja elektericne enrergije je uzeta paušalno, iz razloga što tačnih
podataka. Kao osnov je uzet račun za januar 2019. godine

Annual energy consumption: 2,000 kWh

Increased self-consumption

Sunny Tripower Storage 60


For increased self-consumption and peak load shaving for commercial systems with
high-voltage lithium batteries. Battery voltage range: 575 V - 1000 V
Batteries: Lithium
Capacity: 3.00 kWh Of which can be utilized: 50 %
Condition for operating the device is the use of an Inverter Manager. A power analyzer UMG
604-PRO of the Janitza electronics GmbH is needed in addition.

Result

Without increased self-consumption

With increased self-consumption

The displayed results are estimated values which are derived mathematically. SMA Solar Technology AG accepts no liability for the actual
self-consumption which may deviate from the values displayed here. The potential self-consumption essentially depends on individual load
patterns, which may deviate from the load profile on which the calculation is based.

7/9 Version: 4.21.3.R / 4/14/2020


8/9 Version: 4.21.3.R / 4/14/2020
Monthly values
Project name: Zelene staze - Pecka Location: Bosnia and Herzegovina / Pecka_Zelene_staze
Project number: 02-IV-2020

Diagram

Table

Month Energy yield [kWh] Self-consumption [kWh] Grid feed-in [kWh] Purchased electricity
[kWh]

1 376 (3.3 %) 74 302 96

2 741 (6.5 %) 73 667 80

3 737 (6.5 %) 92 645 78

4 1185 (10.4 %) 96 1090 69

5 1313 (11.5 %) 105 1208 65

6 1357 (11.9 %) 104 1252 60

7 1618 (14.2 %) 109 1509 61

8 1568 (13.8 %) 104 1464 66

9 770 (6.8 %) 89 681 75

10 848 (7.4 %) 83 764 87

11 506 (4.4 %) 71 435 93

12 358 (3.2 %) 69 289 101

9/9 Version: 4.21.3.R / 4/14/2020