PVC Pipe Rates

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 15

Quantity Unit Quantity

Line Item Description UOM Ordered Price Amount Cancelled


1 corner Link fixing & welding Number 8 2939.8 23 518 0
APH BY PASS DUCT - pre-assembly, erection , Metric
2 testing, touch-up painting Tonne 4 12230 48 920 0
APH to ID FAN duct - pre-assembly, erection , Metric
3 testing, touch-up painting Tonne 10 12230 1 22 300 0
APH to wind box duct - pre-assembly, Metric
4 erection , testing, touch-up painting Tonne 3 6585 19 755 0
Boiler to eco duct - pre-assembly, erection , Metric
5 testing, touch-up painting Tonne 12 12230 1 46 760 0

COG DUCT -Erecetion, alignment & welding - Metric


6 back chipping, In root E- 6010 to be used Tonne 35 13171 4 60 985 0

CONVECTION BANK HOPPER - pre-assembly, Metric


7 erection , testing, touch-up painting Tonne 10 12230 1 22 300 0
Convection bank casing - erection, alignment & Metric
8 welding Tonne 4.6 14111 64 911 0
9 ECO coil scallop plate fixing Metre 40 587.97 23 519 0
FD FAN to APH duct - pre-assembly, erection , Metric
10 testing, touch-up painting Tonne 8 12230 97 840 0
FD Fan - erection, alignment and Metric
11 commsissioining Tonne 11 14111 1 55 221 0
Guillotine dampers - pre-assembly, erection , Metric
12 testing, touch-up painting Tonne 12.2 12230 1 49 206 0
13 Hydraulic Test Lot 1 141113 1 41 113 0
NON integral Piping - pre-assembly, erection , Metric
14 testing, touch-up painting Tonne 11 39512 4 34 632 0

ID FAN to CHIMNEY DUCT - pre-assembly, Metric


15 erection , testing, touch-up painting Tonne 22 12230 2 69 060 0
ID Fan - erection, alignment and Metric
16 commsissioining Tonne 32 14111 4 51 552 0
17 Joint repair Number 30 4076.61 1 22 298 0
Liquidation of punch point - Points related to
18 Boiler #3 Lot 1 211670 2 11 670 0

MIX GAS DUCT - Erecetion, alignment &


welding - back chipping, In root E- 6010 to be Metric
19 used Tonne 140 13171 18 43 940 0
20 Manhole doors and peel hole fixing Number 16 5645 90 320 0
NIBR NON integral Piping - pre-assembly, Metric
21 erection , testing, touch-up painting Tonne 9.8 28223 2 76 585 0
Non integral Piping supports & Valves - Metric
22 Erection, alignment & welding Tonne 15 39512 5 92 680 0
Metric
23 Painting of Structure Tonne 400 1035 4 14 000 0
Pressure parts - Attachment welding - panel to Metric
24 panel Tonne 267 282 75 294 0
25 Pressure parts - Stud welding Number 230 163 37 490 0
Rotary soot blower eerction, alignment & Metric
26 welding Tonne 1.7 28223 47 979 0
SCANNER FAN - Erecetion, alignment & Metric
27 welding Tonne 2 32926 65 852 0
SCANNER FAN DUCT - pre-assembly, erection , Metric
28 testing, final paint application Tonne 3 12230 36 690 0
29 SR Balance Joints Number 11 8552 94 072 0
Metric
30 STRUCTURE - Erection Tonne 38 14205 5 39 790 0
Metric
31 STRUCTURE - Alignment Tonne 51 7526 3 83 826 0
32 Safety valve fitup & welding Number 3 20383 61 149 0

Scroll & core air duct including valaves - pre-


assembly, erection , testing, final paint Metric
33 application Tonne 9 12230 1 10 070 0
Metric
34 Soot blower erection, alignment & welding Tonne 2.056 28223 58 026 0
Wind box duct welding -pre-assembly, erection
35 , testing, touch-up painting Metre 80 470 37 600 0
36 commisioning manpower - as per MOM Lot 1 940756 9 40 756 0
37 eco casing - alignment & welding Metre 60 470 28 200 0
MAN hours Number 60
Total 87 99 880
Quantity Quantity Amount
Delivered Billed Billed Add qty Amount
7.2 7.2 21 167

2.92 2.92 35 712

9.92 9.92 1 21 322 4 48,920.00

0 0 0.00

9.6 9.6 1 17 408 0.00

26.044 26.044 3 43 026 0.00

0 0 1 12,230.00

0 0 0.00
32 32 18 815 0.00

5.748 5.748 70 298 0.00

10.754 10.754 1 51 750 0.00

7.2 7.2 88 056 0.00


0 0 0.00

10.29 10.29 4 06 578 9 355,608.00

15.84 15.84 1 93 723 0.00

31.69 31.69 4 47 178 0.00


24 24 97 839 0.00

0 0 0.00

112.622 112.622 14 83 344 0.00


9 9 50 805 6 33,870.00

2.04 2.04 57 575 0.00


12.972 12.972 5 12 550 5 197,560.00

0 0 0.00
Total fin welding
213.6 213.6 60 235 145 40,890.00 completed 427 mtr
184 184 29 992 0.00

0 0 0.00

0 0 1.5 49,389.00 HP dossing skid

0 0 1.33 5 16,327.05 Support


8.8 8.8 75 258 0.00

29.11 29.11 4 13 508 0.00

23.23 23.23 1 74 829 0.00


2.4 2.4 48 919 0.00

5.788 5.788 70 787 0.00

1.644 1.644 46 399 2 56,446.00


Alredy completed 100
64 64 30 080 20 9,400.00 mtr
0 0 - 1 -940,756.00
48 48 22 560 80 37,600.00 Aattachment Welding
2 498 149,880.00
51 89 710 67 364
20

Joint repair not done


20
Total Rs-60/-
No of Working Woeking
DESCRIPITION Total Working per
worker days Hrs
hrs manhour
1 3 3 11 33 1980
2 3 6 11 66 3960
2 3 6 11 66 3960
1 5 5 11 55 3300
1 5 5 11 55 3300
1 2 2 11 22 1320
1 1 1 11 11 660
mix gas duct joint
1 4 4 11 44 2640
3 4 12 11 132 7920
2 4 8 11 88 5280
1 4 4 11 44 2640
2 4 8 11 88 5280
1 2 2 11 22 1320
1 2 2 11 22 1320
4 1 4 11 44 2640
#02 manpower
4 1 4 11 44 2640
1 3 3 11 33 1980
2 3 6 11 66 3960
scanner fan#01
1 3 3 11 33 1980
1 3 3 11 33 1980
1 2 2 11 22 1320
for #01 to #02 1 2 2 11 22 1320
boiler hydro
(pressure line 1") 1 2 2 11 22 1320
arrangement 2 2 4 11 44 2640
1 2 2 11 22 1320

Boiler # 2 Hydrotest

4 2 8 11 88 5280
1 1.5 1.5 11 16.5 990
ID FAN DUCT 04 0 1 0 11 0 0
NOS PLATE AND ID 1 1 1 11 11 660
FAN 02 NO PLATE 1 1 1 11 11 660
FEBRICATION
1 1.5 1.5 11 16.5 990
1 1 1 11 11 660

TURBINE 1 2 2 11 22 1320
STEEM LINE
2 2 4 11 44 2640
BOLT
REMOVAL
TURBINE
STEEM LINE
BOLT
REMOVAL
1 1 1 11 11 660
1 1.5 1.5 11 16.5 990
LP HEATER 1 1.5 1.5 11 16.5 990
TG AND PG 1 1.5 1.5 11 16.5 990
TAPPING 1 0 0 0 0 0
0 0 0 0 0 0
1 3 3 11 33 1980
RSB 1 3 3 11 33 1980
MOUNTING 8 1 3 3 11 33 1980
NOS 1 6 6 11 66 3960
1 6 6 11 66 3960
1 3 3 11 33 1980
CONVECTION 1 3 3 11 33 1980
HOPPER 1 2 2 11 22 1320
PLATE 03 Nos 1 1 1 11 11 660
Qty 3 2 6 11 66 3960
3 3 9 11 99 5940
DM Plant
4 3 12 10 120 7200

BFP -1 & 4

5.8 9 52.2 9 469.8 28188


2498.3 149898
Total
amount

44880

SAR. No: 193 M. Three joints of


size 1930 mm
5280 Used in Boiler#2 refractory
works

9900 During fan trial noticed noise


and Fan casing opened and re
erected in boiler#1

7920
Temp. piping and pump
instalaltion for two boilers
hydro

5280 Manpower utilised for Internal


HYDRO, for IBR certificate
renewal . AECC has stopped

3960

Duct plate not availabe so Don’t


febrication needed Know

4620 Removed
due to In register
Turbine it is
vendor signed.
Bolt removal visit Pls check
4620 Removed
due to In register
Turbine it is
vendor signed.
Bolt removal visit Pls check

2970
Tapping mounting in TG
building

13860
Materials not available at site SAR to be
so needed febrication raised.

SAR to be
15840
raised
Pltae was wrong febricated
supply
7200 DM Feed Pump pipe line
alignment

28188 BFP-1 & 4 ACW line connection,


CT Make up MOV replacement,
RWPH MSRL pipe dismantling,
ACW motor removal etc.
149898

4020
1 06 Nos burner aligment 1 Lot

2 Stack duct to Chimney Connection 1 Lot

3 Furnace Ash drain piping 1 Lot

4 NIBR piping 8 Ton

5 Valve 4 Ton

6 Piping Support 5 Ton

7 Structure 10 Ton

8 ApH to Wind box duct support 10 Ton

9 ApH to ID Fan duct support 4 Ton

10 FD fan duct support 4 Ton

11 All duct corner fixing And welding 1 Lot

12 Cog duct 01 no valve with flaange 1 Lot

13 goggle Valve hydolic paack 1 Lot

14 Air tank for valve in boiler 3 1 Lot


15 Economiser header support 1 Lot

These are aprox estimated balance work for boiler #03 out of our scope and we are agree to do th
mail has been comunictaed dtd 3.29.2019.
for the burner alignment. This is not
additional

This qty has been added while preparing


the new qty. as per discussion with this qty
has been removed

Febrication And Erection. Not 10 mt.

Febrication And Erection

Febrication And Erection

SAR available

IN gas
This qtyduct
hasqty available
been added while preparing
the new qty. as per tridib sir instruction
and sms this qty has been removed

IN gas duct qty available


IN eco duct qty is available

work for boiler #03 out of our scope and we are agree to do the job but after new quotation
ISI Prince make

including
GST per 6 Rate per
SR.No Description agency mtr Required L mtr/pcs Total cost
1 4 inch PVC Pipe Vinayak 970 200 161.6667 32333.33
2 90 deg elbow 4 inchVinayak 8 60 480
3 Equal Tee 4 inch Vinayak 4 85 340
4 Coupler Vinayak 8 55 440
33593.33

including
GST per 6 Rate per
SR.No Description agency mtr Required L mtr/pcs Total cost
1 4 inch PVC Pipe ASHOK 1020 200 170 34000
2 90 deg elbow 4 inchASHOK 8 65 520
3 Equal Tee 4 inch ASHOK 4 60 240
4 Coupler ASHOK 8 95 760
35520
Finolex Pipe Make

Rate per
SR.No Description agency Required L mtr/pcs Total cost
1 4 inch PVC Pipe Dhana Lakshmi 200 165 33000
2 90 deg elbow 4 inc Dhana Lakshmi 8 105 840
3 Equal Tee 4 inch Dhana Lakshmi 4 142 568
Total With GST

EVEREST Pipe Make

Rate per
SR.No Description agency Required L mtr/pcs Total cost
1 4 inch PVC Pipe Dhana Lakshmi 200 134 26800
2 90 deg elbow 4 inc Dhana Lakshmi 8 65 520
3 Equal Tee 4 inch Dhana Lakshmi 4 80 320
Total With GST
Including
GST GST
5940 38940
151.2 991.2
102.24 670.24
Total With GST 40601.44

Including
GST GST
4824 31624
93.6 613.6
57.6 377.6
Total With GST 32615.2