welq t moK I Rbc_ Awa`߇ii Schedule of Rates 2015 cÖYqb|

Item Type : Division 1 - General & Site Facilities


Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) %
1. 01/01/01 Maintenance and Protection of Traffic L.S. 72,575.00 Lump Sum 80,257.00 10.58%
2. 01/01/02 Maintain Temp.Structures & Equipment for the Maintenance and Protection of Traffic day 1,505.00 day 1,913.00 27.11%
3. 01/02/01 Supply, Erect and Remove Field Office for Engineer L.S. 225,000.00 Lump Sum 249,497.00 10.89%
4. 01/02/02 Maintenance, Staffing, Security and Cleaning of the Field Office for the Engineer Month 10,000.00 Month 11,000.00 10.00%
5. 01/02/03 Provision of Office Equipment and Consumables Month 7,000.00 Month 7,700.00 10.00%
6. 01/02/04 Provision, Maintenance and Removal of Sign Boards L.S. 8,000.00 Lump Sum 8,849.00 10.61%
7. 01/02/05 Provision and Maintenance of Survey Equipment Month 800.00 month 897.00 12.13%
8. 01/02/06 Provision of Insurance for Engineer's Office, Furniture and Equipment Month 0.00 Month 0.00 - 
9. 01/02/07 Progress Photographs Month 1,000.00 Month 1,000.00 0.00%
10. 01/03/01 Provide and Remove Site Laboratory & Equipment L.S. 300,000.00 Lump Sum 331,843.00 10.61%
11. 01/03/02 Maintain Site Laboratory Month 7,000.00 Month 7,699.00 9.99%
12. 01/03/03 Special or Additional Tests Pro.Sum 0.00 Pro. Sum 0.00 - 
13. 01/04/01 Saloon Car 1200cc Capacity Month 50,000.00 Month 55,000.00 10.00%
14. 01/04/02 Pick- up (Double Cab) Month 60,000.00 Month 66,000.00 10.00%
15. 01/04/03 Four Wheel Drive Vehicle Min. 6 seats Month 70,000.00 Month 77,799.00 11.14%
16. 01/04/04 Motor Cycle 125cc Month 4,000.00 Month 4,425.00 10.63%
17. 01/04/05 Motor Boat min 5m length Month 15,000.00 Month 16,500.00 10.00%
18. 01/05/01 Relocation of Public Utilities Pro.Sum 0.00 Pro. Sum 0.00 - 

Item Type : Division 2 – Earthwork


Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1. 02/01/01 Clearing and Grubbing sq. metre 35.00 sq. metre 45.00 28.57%
2. 02/02/01 Roadway Excavation in Unsuitable Soil cu metre 134.00 cu metre 171.00 27.61%
3. 02/02/02 Roadway Excavation in Suitable Soil cu metre 134.00 cu metre 171.00 27.61%
4. 02/02/03 Roadway Excavation in Existing Pavement ( not reinforced
cu metre 220.00 cu metre 265.00 20.45%
concrete)
5. 02/02/04 Roadway Excavation in Existing Reinforced Concrete
cu metre 959.00 cu metre 1,198.00 24.92%
Pavement
6. 02/02/05 Deduction of Value of Suitable Soil Recovered from
cu metre 74.00 cu metre 92.00 24.32%
Existing Road
7. 02/02/06 Deduction of Value of Materials Recovered from existing
cu metre 2059.00 cu metre 2,335.00 13.40%
Road Pavement
8. 02/04/01 Channel Excavation in Unsuitable Materials cu metre 138.00 cu metre 173.00 25.36%
9. 02/04/02 Channel Excavation in Suitable Material cu metre 138.00 cu metre 173.00 25.36%
10. 02/05/01 Excavation and Backfill for Structures cu metre 287.00 cu metre 360.00 25.44%
11. 02/05/02 Concrete Backfill for Structures cu metre 8392.00 cu metre 10,201.00 21.56%
12. 02/05/03 Sand Backfill for Structures cu metre 1,017.00 cu metre 1,174.00 15.44%
13. 2/06/1(a) Embankment Fill from Excavation on site. cu metre 201.00 cu metre 246.00 22.39%
14. 2/06/1(b) Embankment Fill from Excavation in Borrow pit within the
cu metre 192.00 cu metre 236.00 22.92%
Right -of-way
15. 02/06/02 Embankment fill from borrow pit in contractor's Arranged
cu metre 250.00 cu metre 310.00 24.00%
land
16. 02/06/03 Sand Backfill to Swamp cu metre 400.00 cu metre 468.00 17.00%
17. 02/07/01 Preparation of Subgrade 300 mm Depth sq. metre 57.00 sq. metre 69.00 21.05%
18. 02/07/02 Preparation of Subgrade 450 mm depth sq. metre 85.00 sq. metre 103.00 21.18%
19. 02/08/01 Improved Subgrade cu metre 804.00 cu metre 916.00 13.93%
20. 02/09/01 Dismantling Existing Structure including disposal of spoil and
L.S. 0.00 Lump Sum 0.00 - 
backfilling.
21. 02/09/02 Dismanting Portions of Existing Structure including stockpiling of
L.S. 0.00 Lump Sum 0.00 - 
materials.
22. 2/09/3(a) Deduction of the Value of Recovered Materials from
L.S. 0.00 Lump Sum 0.00 - 
Structures

c„ôv bs-1/7
Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
23. 2/09/3(b) Deduction of the Value of Recovered Materials from
L.S. 0.00 Lump Sum 0.00 - 
Structures
24. 02/10/01 Construction of Soil Earthen Shoulders cu metre 208.00 cu metre 259.00 24.52%
25. 02/11/01 Construction of Hard Shoulders cu metre 4,068.00 cu metre 4,661.00 14.58%
26. 02/12/01 Subgrade Drains Lin. Metre 243.00 Lin. Metre 270.00 11.11%

Item Type : Division 3 – Pavement work


Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1 03/01/01 Scarify, Mix and Recompact Existing Pavement and/or
sq. metre 39.00 sq. metre 48.00 23.08%
Shoulder
2 03/01/02 Repair of Potholes on the Existing Pavement cu metre 12,715.00 cu metre 15,496.00 21.87%
3 03/02/01 Sub-Base cu metre 3,953.00 cu metre 4,364.00 10.40%
4 03/03/01 Aggregate Base Type I cu metre 5,475.00 cu metre 6,234.00 13.86%
5 03/03/02 Aggregate Base Type II cu metre 4,275.00 cu metre 4,736.00 10.78%
6 03/06/1a Bituminous Prime Coat (Plant Placed) sq. metre 90.00 sq. metre 123.00 36.67%
7 03/06/1b Bituminous Prime Coat (hand placed) sq. metre 87.00 sq. metre 121.00 39.08%
8 03/07/1a Bituminous Tack Coat (Plant Work) sq. metre 27.00 sq. metre 48.00 77.78%
9 03/07/1b Bituminous Tack Coat (Labour intensive work) sq. metre 22.00 sq. metre 44.00 100.00%
10 03/08/01 Primer seal sq. metre 86.00 sq. metre 133.00 54.65%
Single Bituminous Surface Treatment 14mm nominal
11 03/09/1(a) size aggregate (Machine Method) (Bitumen Grade Sq Meter 161.00 Sq Meter 202.00 25.47%
80/100)
Single Bituminous Surface Treatment 14mm nominal
12 03/09/1(b) size aggregate (Machine Method) (Bitumen Grade Sq Meter - Sq Meter 211.00 -
60/70)
Double Bituminous Surface Treatment-20mm
13 3/09/02(a) nominal size aggregate followed by 10mm (Machine Sq Meter 300.00 Sq Meter 396.00 32.00%
Method) (Bitumen Grade 80/100)
Double Bituminous Surface Treatment-20mm
14 3/09/2(b) nominal size aggregate followed by 10mm (Machine Sq Meter - Sq Meter 433.00 -
Method) (Bitumen Grade 60/70)
Double Bituminous Surface Treatment-14mm
15 3/09/02(c) nominal size aggregate followed by 10mm (Machine Sq Meter 264.00 Sq Meter 330.00 25.00%
Method) (Bitumen Grade 80/100)
Double Bituminous Surface Treatment-14mm
16 3/09/2(d) nominal size aggregate followed by 10mm (Machine Sq Meter - Sq Meter 340.00 -
Method) (Bitumen Grade 60/70)
Dense Bituminous Surfacing-Base Course (Plant
17 03/10/1(a) cu meter 13,591.00 cu meter 17,468.00 28.53%
Method) (Bitumen Grade 80/100)
Dense Bituminous Surfacing-Base Course (Plant
18 03/10/1(b) cu meter - cu meter 18,088.00 -
Method) (Bitumen Grade 60/70)
Dense Bituminous Surfacing - Wearing Course (Plant
19 03/10/2(a) cu meter 14,267.00 cu meter 19,519.00 36.81%
Method) (Bitumen Grade 80/100)
Dense Bituminous Surfacing - Wearing Course (Plant
20 03/10/2(b) cu meter - cu meter 20,198.00 -
Method) (Bitumen Grade 60/70)
21 03/11/01 Premix Bituminous Carpeting cu metre 13,191.00 cu metre 16,250.00 23.19%
22 03/12/01 7 mm Compacted Premix Bituminous Seal Coat sq. metre 86.00 sq. metre 113.00 31.40%
23 03/12/02 12 mm Compacted Premix Bituminous Seal Coat sq. metre 126.00 sq. metre 165.00 30.95%
24 03/12/03 15 mm Compacted Premix Bituminous Seal Coat sq. metre 162.00 sq. metre 214.00 32.10%
25 03/13/01 Brick on End Edging Lin. Metre 88.00 Lin. Metre 103.00 17.05%
26 03/13/02 Single Layer Brick Flat Soling i/c 75mm thick compacted sand
sq. metre 411.00 sq. metre 478.00 16.30%
cushion
27 03/13/03 Herring Bond Brick Pavement i/c 12mm sand cushion sq. metre 546.00 sq. metre 613.00 12.27%
28 03/14/01(
Dry Lean Concrete Class-10 (Concrete Mixture). cu meter - 8,576.00 -
a)
29 Dry Lean Concrete Class-10 (Batching Plant without
03/14/1(b) cu meter - 11,244.00 -
Concrete Paver).

c„ôv bs-2/7
Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
30 Dry Lean Concrete Class-10 (Batching Plant with
03/14/1(c) cu meter - 11,455.00 -
Concrete Paver).
31 03/14/2(a) Dry Lean Concrete Class-20 (Concrete Mixture). cu meter 11,949.00
32 Dry Lean Concrete Class-20 (Batching Plant without
03/14/2(b) cu meter - 14,616.00 -
Concrete Paver).
33 Dry Lean Concrete Class-20 (Batching Plant with
03/14/2(c) cu meter - 14,827.00 -
Concrete Paver).
34 Cement Concrete Pavement (Concrete Class-25)
03/15/1(a) cu meter - 13,295.00 -
(Concrete Mixture).
35 Cement Concrete Pavement (Concrete Class-25)
03/15/1(b) cu meter - 17,257.00 -
(Batching Plant without Concrete Paver).
36 Cement Concrete Pavement (Concrete Class-25)
03/15/1(c) cu meter - 17,616.00 -
(Batching Plant with Concrete Paver).
37 Precast RCC Pavement slab (Concrete Class-25)
03/15/1(d) cu meter - 20,529.00 -
(Batching Plant)
38 Cement Concrete Pavement (Concrete Class-30)
03/15/2(a) cu meter - 14,129.00 -
(Concrete Mixture).
39 Cement Concrete Pavement (Concrete Class-30)
03/15/2(b) cu meter - 18,099.00 -
(Batching Plant without Concrete Paver).
40 Cement Concrete Pavement (Concrete Class-30)
03/15/2(c) cu meter - 18,557.00 -
(Batching Plant with Concrete Paver).
41 Precast RCC Pavement slab (Concrete Class-30)
03/15/2(d) cu meter - 21,418.00 -
(Batching Plant)
42 Cement Concrete Pavement (Concrete Class-35)
03/15/3(a) cu meter - 14,727.00 -
(Concrete Mixture).
43 Cement Concrete Pavement (Concrete Class-35)
03/15/3(b) cu meter - 18,689.00 -
(Batching Plant without Concrete Paver).
44 Cement Concrete Pavement (Concrete Class-35)
03/15/3(c) cu meter - 19,047.00 -
(Batching Plant with Concrete Paver).
45 Precast RCC Pavement slab (Concrete Class-35)
03/15/3(d) cu meter - 22,042.00 -
(Batching Plant)

Item Type : Division 4 – Foundation work

Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1 04/01/1a Bored Cast in Place Piles (dia. 400mm) Lin. Metre 1,695.00 Lin. Metre 2,024.00 19.41%
2 04/01/1b Bored Cast in Place Piles [dia 600mm] Lin. Metre 3,852.00 Lin. Metre 4,601.00 19.44%
3 04/01/1c Bored pile cast in place piles (dia 750 mm) Lin. Metre 6,035.00 Lin. Metre 7,223.00 19.69%
4 04/01/1d Bored cast in place Piles (dia 900mm) Lin. Metre 8,921.00 Lin. Metre 10,664.00 19.54%
5 04/01/1e Bored cast in Place Piles (dia 1000mm) Lin. Metre 10,491.00 Lin. Metre 12,565.00 19.77%
6 04/01/1f Bored cast in Place Piles (dia 1200mm) - - Lin. Metre 18,692.00 -
7 04/01/1g Bored cast in Place Piles (dia 1500mm) - - Lin. Metre 33,473.00 -
8 04/01/03 Mild Steel Reinforcing Bars Tonne 89,263.00 Tonne 91,410.00 2.41%
9 04/01/04 High Yield Deformed Steel Reinforcing Bars Tonne 91,550.00 Tonne 95,236.00 4.03%
10 04/01/5a Permanent steel Casing (6mm thick ,dia 400mm) Lin. Metre 6,959.00 Lin. Metre 7,104.00 2.08%
11 04/01/5b Permanent steel casing (6mm thick,dia 600mm) Lin. Metre 10,130.00 Lin. Metre 10,287.00 1.55%
12 04/01/5c Permanent steel casing (6mm thick, dia750mm) Lin. Metre 12,634.00 Lin. Metre 12,801.00 1.32%
13 04/01/5d Permanent steel casing (10mm thick, 600mm dia) Lin. Metre 16,311.00 Lin. Metre 16,467.00 0.96%
14 04/01/5e Permanent steel casing (10mm thick, 750mm dia) Lin. Metre 20,378.00 Lin. Metre 20,546.00 0.82%
15 04/01/05f Permanent steel casing (10mm thick, 900mm dia) Lin. Metre 24,404.00 Lin. Metre 24,578.00 0.71%
16 04/01/5g Permanent steel casing (10 mm thick, 1000mm dia) Lin. Metre 27,021.00 Lin. Metre 27,199.00 0.66%
17 04/01/5h Permanent steel casing (10 mm thick, 1200mm dia) - - Lin. Metre 32,586.00 #VALUE!
18 04/01/5i Permanent steel casing (10 mm thick, 1500mm dia) - - Lin. Metre 40,494.00 #VALUE!
19 04/02/1a Driven Pre-cast Piles (a) 300x300mm Lin. Metre 1,656.00 Lin. Metre 1,892.00 14.25%
20 04/02/1b Driven Precast Piles (b) 350x350mm Lin. Metre 2,163.00 Lin. Metre 2,407.00 11.28%

c„ôv bs-3/7
Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
21 04/02/1c Driven Pre-cast Pile (c) 400x400mm Lin. Metre 2,648.00 Lin. Metre 2,932.00 10.73%
22 04/02/02 Driven Precast Pilot Piles Lin. Metre 536.00 Lin. Metre 651.00 21.46%
23 04/02/03 Mild Steel Reinforcement Bars Tonne 89,263.00 Tonne 91,410.00 2.41%
24 04/02/04 High Yield Reinforcement Bars Tonne 91,550.00 Tonne 95,236.00 4.03%
25 04/03/01 King Post Lin. Metre 500.00 Lin. Metre 703.00 40.60%
26 04/03/02 Raker Piles (including Tie Bars) Lin. Metre 756.00 Lin. Metre 1000.00 32.28%
27 04/03/03 Precast Planks (including Reinforcement Steel) Sq Metre 2,752.00 Sq Metre 2,983.00 8.39%
28 04/03/04 Mild Steel Reinforcing Bars to King Posts and Raker Piles Tonne 89,263.00 Tonne 91,410.00 2.41%
29 04/03/05 High Yield Deformed Steel Reinforcing Bars to King
Tonne 91,550.00 Tonne 95,236.00 4.03%
Posts and Raker Piles
30 04/04/1a Load Test on Cast In Place Working Pile (Proof Load
Number 68,059.00 Number 91,730.00 34.78%
to be specified in BoQ)50 Ton
31 04/04/1b Load test on cast in place piles (For 100 Ton) Number 115,906.00 Number 160,170.00 38.19%
32 04/04/1c Load Test on cast in place piles (For 200 Ton) Number 195,142.00 Number 274,951.00 40.90%
33 04/04/02 Load Test on Cast in Place Pilot Pile (Proof load to be
Number 0.00 Number 0.00  
specified in BoQ)
34 04/04/03 Load Test on Pilot Driven Pile (Proof load to be
Number 0.00 Number 0.00  
specified in the BoQ)
35 04/05/01 Bitumen Slip Layer to Concrete Piles Sq Metre 212.00 Sq Metre 254.00 19.81%
36 04/06/1a Driven Bullah Piles
Lin. Metre 412.00 Lin. Metre 688.00 66.99%
( Dimensions to be stated in BoQ)(125-150mm)
37 04/06/1b Driven Bullah Pile (150-175mm dia) Lin. Metre 486.00 Lin. Metre 767.00 57.82%
38 04/06/1c Driven Bullah Pile (175-200mm dia) Lin. Metre 599.00 Lin. Metre 928.00 54.92%
39 04/06/1d Driven Bullah Pile (200-225mm dia) Lin. Metre 725.00 Lin. Metre 1,108.00 52.83%
40 04/07/01 Cutting Edge (Well Shoe) Ton 110,190.00 Ton 106,348.00 -3.49%
41 04/07/02 Class-20 Concrete for RCC Well cum 11,973.00 cum 14,845.00 23.99%
42 04/07/03 Concrete in Top/Bottom Plugging cum 10,404.00 cum 12,478.00 19.93%
43 4/07/4(a) Labor for Well Sinking (Size 5000mmX10000mm) Depth 0m-6m Metre 14,236.00 Metre 17,775.00 24.86%
44 4/07/4(b) Labor for Well Sinking (Size 5000mmX10000mm) Depth 6m-12m Metre 21,119.00 Metre 25,236.00 19.49%
45 4/07/4(c) Labor for Well Sinking (Size 5000mmX10000mm) Depth 12m-18m Metre 24,028.00 Metre 28,514.00 18.67%
46 4/07/4(d) Labor for Well Sinking (Size 5000mmX10000mm) Depth 18m-24m Metre 30,419.00 Metre 35,704.00 17.37%
47 4/07/4(e) Labor for Well Sinking (Size 5000mmX10000mm) Depth Above 24m Metre 36,052.00 Metre 42,259.00 17.22%
48 4/07/4(f) Labor for Well Sinking (Size 4270mmX7940mm) Depth 0m-6m Metre 9,611.00 Metre 12,031.00 25.18%
49 4/07/4(g) Labor for Well Sinking (Size 4270mm X 7940mm) Depth 6m-12m Metre 14,457.00 Metre 17,254.00 19.35%
50 4/07/4(h) Labor for Well Sinking (Size 4270mmX7940mm) Depth 12m-18m Metre 16,367.00 Metre 19,183.00 17.21%
51 4/07/4(i) Labor for Well Sinking (Size 4270mm X 7940mm) Depth 18m-24m Metre 20,587.00 Metre 23,966.00 16.41%
52 4/07/4(j) Labor for Well Sinking (Size 4270mm X 7940mm) Depth Above 24m Metre 24,427.00 Metre 28,586.00 17.03%
53 4/7/5 Sand Filling cum 1,024.00 cum 1,179.00 15.14%
54 4/7/6 High Steel Reinforcement Bars Ton 91,550.00 Ton 95,236.00 4.03%

Item Type : Division 5 -Structures

Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1 05/01/01 Single Layer Brick Flat Soling sq. metre 416.00 sq. metre 468.00 12.50%
2 05/01/2a Concrete Class as Detailed on Drawings (Class10) (Concrete Mixer) cu metre 7,229.00 cu metre 8,469.00 17.15%
3 05/01/2b Concrete class-20 (Foundation) (Concrete Mixer) cu metre 9,790.00 cu metre 11,929.00 21.85%
4 05/01/2c Concrete class - 20 (Vertical member col. pier,
cu metre 11,421.00 cu metre 15,082.00 32.05%
abutment / wing wall,culvert etc.) (Concrete Mixer)
5 05/01/2d Concrete class-20 (Girder, cross girder,diaphram,beam etc) (Concrete Mixer) cu metre 13,396.00 cu metre 16,003.00 19.46%
6 05/01/2e Concrete class-20 (Deck slab,side walk,wheel
cu metre 11,777.00 cu metre 14,186.00 20.46%
guard,curb etc (Concrete Mixer)
7 05/01/02f Concrete class -20 (rail & post) (Concrete Mixer) cu metre 14,496.00 cu metre 16,887.00 16.49%
8 05/01/2g Concrete Class - 25 (Foundation) (Concrete Mixer) cu metre 10,123.00 cu metre 12,382.00 22.32%
9 05/01/2h Concrete class -25 (Vertical member col,
cu metre 11,720.00 cu metre 14,235.00 21.46%
pier,abutment/wing wall,culvert etc) (Concrete Mixer)
10 05/01/02i Concrete class - 25 (Girder, beam, cross girder,and
cu metre 13,725.00 cu metre 16,615.00 21.06%
diaphram etc) (Concrete Mixer)
c„ôv bs-4/7
Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
11 05/01/02j Concrete class - 25 (RCC/CC Pavement work) (Concrete Mixer) cu metre 12,245.00 cu metre 14,833.00 21.14%
12 05/01/2k Concrete class-30 (Deck slab, side walk, wheel
cu metre 12,778.00 cu metre 15,549.00 21.69%
guard,curb etc (Concrete Mixer)
13 05/01/02l Concrete Class – 35 (Concrete Mixer) cu metre 20,622.00 cu metre 24,088.00 16.81%
14 05/01/2m Concrete Class – 40 (Pre-stressed Girder) (Concrete Mixer) cu metre 21,008.00 cu metre 24,579.00 17.00%
15 05/01/3a Concrete Class as Detailed on Drawings (Class10) (Batching Plant) cu metre - - 10,211.00 -
16 05/01/3b Concrete class-20 (Foundation) (Batching Plant) cu metre - - 13,671.00 -
17 05/01/3c Concrete class - 20 (Vertical member col. pier,
cu metre - - 15,526.00 -
abutment / wing wall,culvert etc.) (Batching Plant)
18 05/01/3d Concrete class-20 (Girder, cross girder,diaphram,beam etc) (Batching Plant) cu metre - - 17,727.00 -
19 05/01/3e Concrete class-20 (Deck slab,side walk,wheel guard,curb etc) (Batching Plant) cu metre - - 15,911.00 -
20 05/01/3f Concrete class -20 (rail & post) (Batching Plant) cu metre - - 18,612.00 -
21 05/01/3g Concrete Class - 25 (Foundation) (Batching Plant) cu metre - - 14,115.00 -
22 05/01/3h Concrete class -25 (Vertical member col,
cu metre - - 15,968.00 -
pier,abutment/wing wall,culvert etc) (Batching Plant)
23 05/01/03i Concrete class - 25 (Girder, beam, cross girder,and
cu metre - - 18,341.00 -
diaphram etc) (Batching Plant)
24 05/01/03j Concrete class - 25 (RCC/CC Pavement work) (Batching Plant) cu metre - - 16,559.00 -
25 05/01/03k Concrete class-30 (Deck slab, side walk, wheel guard,curb etc) (Batching Plant) cu metre - - 17,284.00 -
26 05/01/03l Concrete Class – 35 (Batching Plant) cu metre - - 24,812.00 -
27 05/01/3m Concrete Class – 40 (Pre-stressed Girder) (Batching Plant) cu metre - - 25,303.00 -
28 05/02/01 Mild Steel Reinforcement Bars Tonne 89,263.00 Tonne 91,410.00 2.41%
29 05/02/02 High Yield Reinforcement Bars Tonne 91,550.00 Tonne 95,236.00 4.03%
30 05/02/03 Wire Mesh Reinforcement Tonne 80,503.00 Tonne 81,224.00 0.90%
31 05/03/01 Prestressing Wire or Strand Tonne 253,652.00 Tonne 273,590.00 7.86%
32 05/04/01 Modification to Existing Concrete cu metre 8,603.00 cu metre 9,894.00 15.01%
33 05/04/02 Concrete Surface Repair Works (Superstructures) sq. metre 184.00 sq. metre 213.00 15.76%
34 05/04/03 Concrete Surface Repair Works (Substructures) sq. metre 246.00 sq. metre 283.00 15.04%
35 05/04/04 Resin Repair Mortars Kg 0.00 Kg 0.00  
36 05/04/05 Cement Mortar in Cracks Lin. Metre 50.00 Lin. Metre 58.00 16.00%
37 05/04/06 Anchor and Tie Bars Tonne 2,356.00 Tonne 1,966.00 -16.55%
38 05/05/01 New and Extended Brickwork cu metre 6,421.00 cu metre 7,408.00 15.37%
39 05/05/02 Brick Drainage Layer cu metre 4,031.00 cu metre 4,444.00 10.25%
40 05/05/03 Replacement of Defective Existing brick cu metre 9,974.00 cu metre 11,783.00 18.14%
41 05/05/04 Repointing of Existing Brickwork Joints sq. metre 440.00 sq. metre 533.00 21.14%
42 05/05/05 Steel Tie Bars and Pattress Plates Tonne 0.00 Tonne 0.00  
43 05/06/01 Preparation and Painting of Existing Structures sq. metre 461.00 sq. metre 527.00 14.32%
44 05/07/01 Carriage of Bridge Steelwork from Port to Site Tonne 0.00 Tonne 0.00 -
45 05/07/02 Fixing of bearings for Unit Bridging Number 0.00 Number 0.00 -
46 05/07/03 Supply and Fixing of Elastomeric Bearings for Composite Bridge Construction Number 0.00 Number 0.00 -
47 05/07/04 Asssembly and Installation of Unit Bridging Lin. Metre 0.00 Lin. Metre 0.00 -
48 05/07/05 Installation of Steelwork for Composite Bridge Construction. Tonne 0.00 Tonne 0.00 -
49 05/07/06 Installation of Steel Post and Barrier Parapet to
Lin. Metre 0.00 Lin. Metre 0.00 -
Reinforced Concrete Deck Slab
50 05/08/01 Expansion Joint complete as detailed on the Drawings in the location 10.88%
Lin. Metre 2,417.00 Lin. Metre 2,680.00
described in the BoQ. (Updated with new drawing/2014)
51 05/08/02 Bridge Deck Joint Complete as detailed on the Drawings. Lin. Metre 0.00 Lin. Metre 0.00 -
52 05/09/01 Provision and Fixing of drainage to structures as detailed on the Drawings. Lump sum 0.00 Lump sum 0.00 -
53 05/10/01 Embedment of Inserts and Fittings Lump Sum 0.00 Lump Sum 0.00 -
54 5/12/1(a) Supply and Installation of Pot bearings (Size-500X500X72) Number 0.00 Number 0.00 -
55 5/12/1(b) Supply and Installation of Pot bearings (Size-500X450X72) Number 0.00 Number 0.00 -
56 5/12/1(c) Supply and Installation of Pot bearings (Size-400X300X72) Number 0.00 Number 0.00
57 05/12/02 Supply and Installation of Shock Transmission units Number 0.00 Number 0.00
58 5/13/1(a) Neoprene rubber bearing or Elastomeric bearing supplying &
Number 14,344.00 Number 16,631.00 15.94%
fitting fixing, etc.
59 5/13/1(b) Neoprene rubber bearing or Elastomeric bearing supplying &
Number 16,694.00 Number 19,334.00 15.81%
fitting fixing, (b) , etc.
60 5/14/1(b) Double Single Bailey Bridge or Acrow panel (Erecting and Assembling). Lin. Metre 2,151.00 Lin. Metre 3,065.00 42.49%
61 5/14/1(c) Calender Hamilton Truss Bridge (Erecting and Assembling) Lin. Metre 9,292.00 Lin. Metre 11,197.00 20.50%
62 5/14/2(b) Double Single Bailey Bridge or Acrow panel (Delaunching). Lin. Metre 1,579.00 Lin. Metre 1,955.00 23.81%
63 5/14/2(c) Calender Hamilton Truss Bridge (Delaunching). Lin. Metre 6,084.00 Lin. Metre 7,301.00 20.00%
64 05/15/01 Mobilization for railing type work, etc. Lin. Metre 1,622.00 Lin. Metre 1,868.00 15.17%
c„ôv bs-5/7
Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
65 05/16/01 Dismantling of deck slab, thickness 175mm. Sq Metre 4,516.00 Sq Metre 5,998.00 32.82%
66 05/16/02 Steel Beam (W 530 x 167) Lin. Metre 10,929.00 Lin. Metre 11,051.00 1.12%

c„ôv bs-6/7
Item Type : Division 6 - Incidental
Sl. Item Description. RHD Schedule of Rate Rate Analysed by the Change in Unit Rates
No. Code May/2011. Committee-June-2015 between May/2011
and June/2015 (%)
(1) (2) (3) (4) (5)
Qnty Rate (Tk.) Qnty Rate (Tk.) Qnty
1 06/01/01 Grouted Riprap Pavement sq. metre 1,748.00 sq. metre 2,165.00 23.86%
2 06/01/02 Concrete Slope Protection sq. metre 1,368.00 sq. metre 1,475.00 7.82%
3 06/01/03 Loose stone Riprap Protection cu metre 4,605.00 cu metre 5,309.00 15.29%
4 06/01/04 Concrete Cut-Off cu metre 15,694.00 cu metre 17,427.00 11.04%
5 06/02/01 Reinforced Concrete Culvert Pipe - Class A bedding Lin. Metre 3,943.00 Lin. Metre 4,985.00 26.43%
6 06/02/02 Reinforced Concrete Culvert Pipe - Class B bedding Lin. Metre 1,942.00 Lin. Metre 2,360.00 21.52%
7 06/03/01 Manhole (Diameter to be stated in the BoQ) Number 0.00 Number 0.00  
8 06/03/02 Catch Basin (Diameter to be stated in the BoQ) Number 0.00 Number 0.00  
9 06/03/03 Concrete Side Ditch/ U-Drain Lin. Metre 0.00 Lin. Metre 0.00  
10 06/03/04 Brick Headwall to Culvert Pipe ( Pipe diameter to be stated in the
Number 0.00 Number
BoQ) 0.00  
11 06/04/01 Concrete Kerb (as detailed on the drawings) Lin. Metre 0.00 Lin. Metre 0.00  
12 06/04/02 Combined Concrete Kerb and Gutter (as detailed on the
Lin. Metre 0.00 Lin. Metre
drawings) 0.00  
13 06/05/01 Road Marking-Thermoplastic Material (indicate if screed or spray
Sq Metre 1,051.00 Sq Metre
application) 1,070.00 1.81%
14 06/05/02 Road Marking - Road marking Paint Sq Metre 283.00 Sq Metre 412.00 45.58%
15 06/05/03 Reflecting Road Studs Number 700.00 Number 897.00 28.14%
16 06/05/04 Application of Ballotini Sq Metre 308.00 Sq Metre 349.00 13.31%
17 06/06/01 Topsoil cu metre 248.00 cu metre 332.00 33.87%
18 06/07/01 Grass Sodding Sq Metre 28.00 Sq Metre 37.00 32.14%
19 06/07/02 Grass Turfing Sq Metre 28.00 Sq Metre 37.00 32.14%
20 06/08/01 Guardrail Lin. Metre 0.00 Lin. Metre 0.00  
21 06/09/01 Concrete Monument Number 0.00 Number 0.00  
22 06/09/02 Concrete Post Number 0.00 Number 0.00  
23 06/10/01 Traffic Signs Number 5,521.00 Number 6,901.00 25.00%
24 06/10/02 Sign Post Number 2,458.00 Number 3,073.00 25.02%
25 06/11/01 Rumble strips (Bituminous Concrete Volume) cum 15,035.00 cum 14,717.00 -2.12%
26 06/11/02 Road Marking Thermoplastic Material (by spray) 1,051.00 1,055.00 0.38%
27 06/12/01 Geotextile Filter Fabric (as detailed on the Drawings) Sq Metre 173.00 Sq Metre 179.00 3.47%
28 06/12/02 Furnishing and installing Matress (as detailed on the drawings) Sq Metre 1,333.00 Sq Metre 1,524.00 14.33%
29 6/13/1(a) Bullah Palisiding (150mm – 175mm) Lin. Metre 6,601.00 Lin. Metre 9,410.00 42.55%
30 6/13/1(b) Bullah Palisiding (Local Bullah : 150mm – 200mm) Lin. Metre 4,348.00 Lin. Metre 7,034.00 61.78%
31 06/14/01 Mobilization for deck slab repairing work, etc. Sq Metre 688.00 Sq Metre 799.00 16.13%
32 06/15/01 Concrete Guide Post (1.6 m long, 200mm dia) No. 1,529.00 No. 2,040.00 33.42%
33 06/16/01 Concrete Kilometer Post (As per drawing) No. 6,375.00 No. 7,820.00 22.67%
34 6/17/1(a) RCC Palisiding (4m post, 200mm X 200mm) Lin. Metre 8,129.00 Lin. Metre 9,938.00 22.25%
35 6/17/1(b) RCC Palisiding (3m post, 150mm X 150mm) Lin. Metre 5,277.00 Lin. Metre 6,581.00 24.71%

c„ôv bs-7/7
wewfbœ wbg©vY mvgMÖx I kªwgK gRyixi GKK `i t
Sl. Basic Item Category Unit Recommended Recommended BBS Remarks Recommended
No. Rate 2011 Rate 2014 August Rate 2015
(Taka) (Taka) 2014 Rate (Taka)
FM = 0.5 Cum 400.00 450.00 - BBS-Gi 450.00
FM = 0.8 Cum 450.00 500.00 - 500.00
FM = 1.0 Cum 500.00 600.00 -
cwimsL¨vb 600.00
FM = 1.8 Cum 1,130.00 1,200.00 - ey‡jwUb-G 1,200.00
Abyiƒc
1 Sand
‡MÖ‡Wk‡bi
FM = 2.5 Cum 1,500.00 1,700.00 - AvB‡Ug bv 1,700.00
_vKvq `i cvIqv
hvqwb|
2 Cement OPC Ton 8,500.00 10,000.00 10,764 10,764
40 grade Ton 62,000.00 60,000.00 62,360 62,360
3 Reinforcement
60 grade Ton 64,000.00 65,000.00 65,640 65,640
80/100
Ton 48,000.00 70,000.00 68,500 including 68,500
Penetration grade
4 Bitumen carraige of Tk
60/70 Penetration
Ton - 76,000.00 73,000 2000 per Ton 73,000
grade
5 Brick 1st Class Per 1000 7,000.00 8,000.00 7,477 7,477
Fore man Per day/person 700.00 800.00 - BBS-Gi 800.00
Asphalt Mistry Per day/person 500.00 600.00 600.00
Mason Per day/person 500.00 600.00 - cwimsL¨vb 600.00
Skilled Per day/person 500.00 550.00 - ey‡jwUb-G 550.00
6 Labor Semi-skilled Per day/person 400.00 450.00 - Abyiƒc 450.00
AvB‡Ug bv
Un-skilled Per day/person 300.00 400.00 - _vKvq `i 400.00
cvIqv hvqwb|
7 Brick Chips 40mm cum 2,800.00 3,200.00 3,000 3,000
Stone Chips/ 25mm cum 4,800.00 4,800 BBS-Gi 4,800
Gravel 14mm cum 4,500.00 4,600 4,600
8
12mm cum 4,000.00 4,400 cwimsL¨vb 4,400
9mm cum 3,200.00 3,500 ey‡jwUb-G 3,500
20mm cum 4,500.00 5,970 Abyiƒc AvB‡Ug 5,970

Stone
14mm cum 4,500.00 4800 bv _vKvq `i 4800

9 Chippings cvIqv hvqwb|


(Chattak/Pakur) 10mm cum 4,500.00 4600 Including 4600
crushing charge
Tk 250 per cum
10 Pea Gravels cum 2,000.00 2500 - 2500
11 Fire Wood Ton 4,000.00 5,000.00 - - 5,000.00
6m long (Dia 150 –
Lin. meter 1,600.00 500.00 - - 500.00
175mm)
12 Bullah Pile
6m long (Dia 150 –
Lin. meter 1,600.00 550.00 - - 550.00
200mm)