Check contractor's measurements Measurements During construction assist the contractor with services issues
Public Relations
10, 3, 9 10, 4, 7
Measure and check payment certificates
Manage the release of information
Written report from Contractor to RE
5, 8
Accidents reports all filed
Accidents Manage the sub contractor processes
RE to ensure accidents are reported to OHASA or other authority 4, 6, 7, 8
7, 8, 9
Employers other agents
Accidents involving RE and staff also reported to authority All communication is through the RE
Wok ordered outside scope of items to be managed separately 4, 5, 7, 8
Contractual Matters
RE to negotiate rates with the contractor and seek approval The RE is responsible for the quality of all materials on site.
Suppliers
10, 9
Major work changes must get Employer/Client approval Variations and Day Work
1.2.4.9.10
Daywork must have detailed claim system
Be familiar with all technical specs
Where work is significant new rates should be established and approved
10, 3, 4, 7, 9
Payment for PC items must be done as per GCC Prime Cost Items (PC) Design and Specification
Must understand all design principles including site investigation
9.10
RE must be familiar with the contract price adjustment formula and its ramifications Escalation Formula Contractor must set out all lines and levels - RE checks
10, 4, 7, 9
RE must apply GCC to resolve claims
Contractor to formulate plans, and RE avoids giving instruction
RE must motivate and get approval for agreement in disputes
Claims 7, 8
RE to ensure that agreement is reached and documented
10, 4, 5, 7, 8, 9 Contractor to produce all calcs and drawings which RE checks
Contractor to give monthly notice of of intention to claim 3, 5, 7, 9
All Risks Traffic Accommodation
Plant 1, 10, 2, 4, 9
Insurance - RE to ensure
Third Party Strength to carry load
7
1, 10, 2, 3, 5, 7, 9
Employers Liability Temporary Works
Adequate foundations
1, 10, 2, 3
Insist on compliance with the programme temp works don't adversely impact on permenant works
Check that
Must assist the contractor with planning and monitoring the programme 10, 6, 7, 9
RE to negotiate additional resources be employed if project falls behind Proper safety precautions observed
Progress Monitoring
10, 4, 6, 7
Regular progress meetings held 10, 4, 6, 7, 9
Technical Duties
That temp work are built to approved design
Can offer ways and means of of managing the program
10, 6, 7, 8, 9
1, 2, 3
Control Contractor's progress
General admin
10, 4, 5, 7, 8
Site investigations and surveys
thorough inspections and checking all stages
Programmes and progress 10, 4, 8, 9
Authority to Proceed
Estimates State what samples and tests must take place
Files
Sub-contracts and material 10, 7, 9