RECORD OF PILE FOUNDATION Project Name:
(To be filled for every 3 Tables)
Date:
Time :
Table No - Table No - Table No -
Sr No. CRITERION
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
Is auguring done at
1
survey point
Horizontal distance
b/w post top to
2 nearby post top as per
drawing (Allowable
tolerance ±5 mm)
vertical alignment of
3 post (Spirit level
check)
whether water is
4 poured before 15 mins
of concreting
Alignment of
5
shuttering
Mixing of concrete
should be done
6 appropriate to
produce
homogeneous mix