Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

 

Doosan Heavy Industries


Vietnam
Dung Quat Economic Zone,
Binh Thuan, Binh Son, Quang Ngai,
Vietnam
 
T +84 55 5618 900
F +84 553 618 950

A 17.Aug.2012 N.V.CHI D.M.KIM K.J.LIM FOR INFORMATION

Rev. Date Prepared Checked Approved Details of Revision

Owner :

Consultant :

Contractor :

               
Project : PC : T10206
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT UAS : DD09
Unit : P0

Title : KKS : ZEN

T10206-DD09-P0ZEN__-120012 METHOD Reg. No. 120012


STATEMENT FOR CRANE & HOIST ERECTION Rev. : A

Page-No : 1/21
Drawing No. : T10206-DD09-P0ZEN__-120012

Page 1 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION
 

    CONTENTS 

NO. DESCRIPTION PAGE

1 PURPOSE 3

2 SCOPE 3

3 REFERENCE DOCUMENT 3

4 TOOL AND EQUIPMENT 4

5 RESPONSIBILITY 5

6 PROCEDURE AND SEQUENCE 5

7 INSPECTION AND TESTING 10

8 ENVIRONMENT, HEALTH AND SAFETY (EHS) 10

9 RISK ASSESSMENT 13

10 JOB SAFETY ANALYSIS (ATTACHMENTS) 17

Page 2 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

1. PURPOSE
This Method Statement covers the erection works of Crane & Hoist of Mong Duong II Coal Fired
Power Plant Project. 

¾ Project name: MONG DUONG II CFPP (2x560MW)


¾ Final User: AES-VCM
¾ EPC Contractor: DOOSAN
¾ SUBCONTRACTOR: LILAMA – Job number: DV-PC-11-022/2011.11.8
¾ Site location: MONG DUONG, CAM PHA, QUANG NINH, VIETNAM
¾ Project Code: T10206
¾ Item: Crane & Hoist
¾ Location of CRANE & HOIST in service: MONG DUONG, CAM PHA, VIETNAM
 

2. SCOPE

This method statement details the minimum requirements for the storing, unloading, handling,
transportation, erection & testing of Crane & Hoist of Mong Duong II project.

3. REFERENCE DOCUMENT

¾ Approved Construction Drawings


¾ Instructions for erection and operation from manufacturer
¾ Inspection & Test Plan (ITP)
¾ AWS D1.1: Structural Welding Code- Steel
¾ Welding procedure specification (WPS)
¾ Project EHSS requirement
¾ QTKĐ 001:2008/BLĐTBXH: Safety Technical Inspection Guideline for Lifting Equipment.

Page 3 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

4. TOOL AND EQUIPMENT

All construction machines, facilities and tools should be complied with requirements of the project.

The below list details construction machines, facilities and tools to be used for erection of crane &
hoist.

No Description Quantity Remark

Existing at STG area for


1. Hydraulic crawler crane 250T 1
erection of STG building

For erection of rails and


2. Hydraulic crane 50T 1
supporting for assembly

3. Boom truck 10 tons 1

4. Portable welding machine set 2

Steel wire rope slings and


5. Wire rope slings and shackles
nylon flexible sling

6. Electrical hand drilling machine 2

7. Electrical hand grinding machine 2

8. Chain blocks

9. Level blocks

10. Hand tool set 1

11. Wooden blocks

12. Cutting torch set 1

13. Theodolite machine 1

14. Leveling machine 1

15. Torque wrench 1 700 Nm

16. Scaffold

Page 4 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

5. RESPONSIBILITY

¾ It is overall responsibility of Project Manager to organize resources prior to perform construction


activities as per project specification in compliance with the quality, schedule & safety
requirements;
¾ EHS Manager will ensure in ordination with Site Engineer that all measure/construction taken
shall be maintained till completion of job;
¾ It is the responsibility of Construction Manager/Site Engineer that construction activities are
executed according to the relevant project specification in compliance with the quality, schedule
& safety requirements;
¾ Doosan will ensure that all works are performed safely according to the attachment;
¾ The relevant Doosan Supervisor will ensure that the work is carried out in accordance with this
method statement and project specification;
¾ The QC Inspector will ensure that the work is executed according to the requirements of quality
dossier are fulfilled.
6. PROCEDURE AND SEQUENCE
6.1. Preparation for erection
¾ All components and structures must be at site location;
¾ Check all components according to parking list and check the material status (visual check,
dimension check, review document);
¾ The storage condition also must be checked before storing the material;
¾ End connection of girders and end carriage must be free of rust, oil, grease, paint and
contaminants before assembly;
¾ Check all marking and match items to be assembled;
¾ Check all motors and brakes for moisture condensation and brake jammed;
¾ Check the steel structures, concrete foundations or the crane supports have been done, adjusted
and inspected in accordance with the design drawings and erection procedure to make sure the
rails of crane & hoist can be installed;
¾ Check the temporary access road for heavy equipment accessing and operating. Also the space of
the working area for heavy equipment accessing;
¾ Check the heavy equipment status which shall be used for lifting, transporting: The documents to
be submitted for verification, visual check, operator license;
¾ Check the tool/ equipment for working is good condition;
¾ Check the scaffolding condition to make sure working at height is ready;
¾ Check the electrical work for welding, drilling, grinding;
¾ Check the work permit is to be approved by authorized person;

Page 5 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

¾ Check the manpower to be used for working (welder, grinder, fitter, general worker, helper, etc).
Make sure that all workers have been trained, guided carefully before work.
6.2. Transportation
The transportation equipments must be good condition and inspected by authorized person also.

All access to the site shall be checked to confirm accessibility for the transport vehicles into the site
(transport roads, their width & strength).

The supervisor must be dispatched to check before, during and after transportation of the material to
the working area to make sure the transportation condition is good, safe for equipment, vehicle, and
personnel around.

6.3. Positioning of crane


Depend on site condition the crane shall be located into a best location for lifting, for example: the
overhead crane for Turbine building shall be installed by using the CKE250 crane with the location
shown on the drawing below:

Page 6 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

The positioning of crane and load of the item must be calculated and checked carefully before lifting,
also the lifting plan must be established and approved by authorized person and the plan shall be
placed at the working area.

6.4. Assembly work

Depend on the position and the items to be installed the items can be assembled to a block before
lifting.

For example 1: the overhead crane (90/30 T) for Turbine building, the sub assembly work could be
done for the items as below:

¾ End carriage
¾ Girders
¾ Power supply system
¾ Walkways
¾ Electrical equipment
¾ Pendant system
For example 2: Crane girder is assembled with the following items:

¾ End carriage including wheels and drive motors;


¾ Walkway, handrails;
¾ All electrical boxes and panels;
¾ Festoon cable systems;
¾ Hoist unit completes with trolley.
6.5. The erection work
Depend on each type of the crane & hoist the assembled block can be erected then other items or
blocks can be erected and fitted with the related items.

During erection stage, the direct workers must be trained carefully and have to comply with the
erection manual which issued by the manufacturer. During working the crane & hoist the supervisors
also have to check carefully step by step for making sure the work to be carried out in accordance
with the design drawing, procedure/ manual and to prevent any risk which may cause as an accident.

For example: the overhead crane of Turbine building shall be installed following the sequence
below:

Page 7 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

Rail installed, adjusted, fitted Assembly work on the ground

Lifting the assembled block Another item is being lifted

The parts to be fitted Electrical panel & cable connection

¾ Installation of runway rails;


¾ Installation of long travel end stoppers;
¾ Installation of long travel power supply bracket;
¾ Installation of long travel power supply;

Page 8 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

¾ Installation of sub assembly of mechanical and electrical work on the crane as ground level;
¾ Lifting of crane onto the runway;
¾ Cable connection and termination.
6.6. Welding work
The welding work shall be carried out by qualified welder (welder shall be qualified in accordance
with AWS D1.1).

The welding work shall be complied with approved WPS.

Visual check shall be applied for 100% of the welding surface and PT (refer to the ITP document)

Cleaning work must be done and checked carefully before, during and after welding.

6.7. Bolting work


The bolting material shall be stored indoor type the packing must be maintained carefully before
using. When taking bolting material for construction, the bolting material must be checked and
distributed carefully to make sure the bolting material is correct for the work and in good condition.

The tools for tightening must be in good condition and not damage to the bolting material during
working.

The bolting must be tightened properly to prevent the damages.

After bolting work finished, all bolts must be checked carefully to find the broken or damaged bolts
and repair the bolts properly.

The end carriage is assembled to the girder by inserting the high tensile bolts into the aperture in the
end and the nuts are tightened from the outside with a torque wrench to a maximum of the tensile.
And the washer is to be inserted before tightening. The aperture on the end carriage should then be
closed with the plugs (rubber pad) provided, see the figure as below:

Page 9 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

6.8. Adjusting work


The parts of the crane shall be assembled & fitted following the sequence as required by
manufacturer, before fitting the connection joint has to be cleaned, other materials must be removed
and proper protection material must be applied carefully.

The adjusting must be done slowly and carefully by experienced & trained personnel.

After each time of the adjusting, the items must be checked to make sure the tolerance and
requirements from the crane manufacturer.

Building span, runway rails and end stopper should be adjusted and checked to ensure that structure
and runway rails are installed properly.

6.9. Painting work


Only touch up paint shall be applied in this case of the welding joints, the paint damaged area.

The painting work shall be carried out in accordance with the painting specification which issued by
the paint manufacturer. The qualified painters are required for all painting works also.

Refer to the Painting Procedure no. T10206-YR01-P0ZEN-070001_Rev.D.

7. INSPECTION AND TESTING


Please refer to the ITP document.

The acceptance standard shall follow the manufacturer requirements.

All of bolts connect girders with carriages shall be checked by a torque wrench.

After the erection works finished, the crane & hoist shall be power energized and load test to check
the permanent work later. The said activity means is to get the certificate for the permanent
operation of the later stage. The Certificate of Compliance shall be issued after load test by
authorized body following the local regulation (procedure No. QTKĐ 001:2008/BLĐTBXH).

8. ENVIRONMENT, HEALTH AND SAFETY (EHS)


8.1. Responsibilities and Instructions
¾ PM/EHS Officer shall ensure that all work is undertaken in accordance with the specified work
scope;
¾ Safety training should be conducted to all personnel assigned at site prior to commence any work;
¾ All personnel should know the locations of fire extinguishers, communications, manual alarms &
ESD point;
¾ All personnel should be aware of assembly points, escape routes, emergency contact numbers;

Page 10 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

¾ Carry-out daily tool box and safety talks;


¾ Personal Protective Equipment (PPE) shall be worn at all times;
¾ Good housekeeping shall be observed in work areas;
¾ Construction wastes shall be segregated and disposed to an approved dump yard area;
¾ Keep non-essential workers clear of machinery whilst it is in operation;
¾ Proper inspection of all equipments prior to use to avoid leakage and equipment failure;
¾ Permit to work shall be obtained appropriately for the type of work and location;
¾ All vehicles must comply and observed speed limit of 10 km/h on site;
¾ Excavation and delivery of materials are prohibited during heavy rains;
¾ Adequate lighting equipments when working night time;
¾ Ensure all workers and equipments working overtime are properly accounted and obtained
permit/approval from Doosan EHS Manager prior to carry-on works. Regular working time is
from 6:30 am ~ 5:00 pm;
¾ Periodic refresher trainings, tool box talk and audit shall be conducted.
8.2. Safety ( PPE )
¾ Safety Helmets
¾ Gloves
¾ Safety Goggles
¾ Dust Mask
¾ Reflective Vest
¾ Others: Depend on each special work the proper PPE shall be equipped for the workers before
work.
8.3. First Aid Facilities
¾ First aid facility is always made available during working hours by a qualified first aider.
¾ Ambulance car with Driver, Helper and stand by Nurse are available at site at all times.
 

Page 11 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

8.4. Emergency chart

Emergency Contact Point


Site Office of Doosan Vina: 033 3968 200 DOLISA Quang Ninh:
- Lim Kwang Jae(Site Director): 0916203533 - Đỗ Thị Xanh (Director)
- Kyeong ho Kam (Admin. Manager): 0906676673 Tel: 033 3835 664
MP: 0912 668 468

EHS Manager – Kim Kyung Yong (MP: 0916 930 755)


Mr.K.Lee: 0919079827
Mr.Lam: 0905135075
Mr. Thai: 0905430036

Police Department: Hospital:


- Mobile Police: 113 - Emergency: 115
- Cam Pha Town: - Cam Pha Hospital: 033 3862 245
+ Nguyễn Quốc Tiến: 0913 249 819 + Vũ Ngọc Tuấn: 0904 190 469
- Mong Duong Ward:
+ Nguyễn Văn Xa: 0903 463 158
- Cam Dong Ward: Fire station: 114
+ Nguyễn Hải: 0913 266 832 + Nguyễn Thành Lâm: 0912 348 895

Doosan Fire Team


+ Comender Mr. Dat: 0936007779
Army Division: + Team Leader: Mr. Sy: 0945624528
- Cam Pha Town: Members: Mr.Tho: 0986101540
+ Lê Văn Long: 0982 090 417 Tuan: 01647394783
- Mông Dương Ward: Trung: 0923669268
+ Bùi Quang Trung: 0984 544 488
Others
- Immigration Office - Quang Ninh’s Police:
Tel: 033 3798 114
- DOLISA – Cam Pha Town:
+ Bùi Văn Lự: 0912 126 398
- Customs Department
+ Bùi Đức Ái: 0913 263 387
Doosan Heavy Industries Vietnam

Page 12 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

9. RISK ASSESSMENT

The Notes:

¾ All workers related to unloading, handling and erection of overhead cranes will be conducted
according to safe practices by DHI.
¾ Do not commence or continue lifting of crane structure when the wind velocity exceeds 72 km/h.
¾ During lifting of crane structures, especially items that are long and bulky, ensure that both ends
of the structures are attached by guiding ropes. These ropes manned sufficiently to control the
movements so as to prevent undesirable swinging and dipping.
¾ The load imposed on the slings shall not exceed the safe working load, open hooks shall not be
used for hoisting.
¾ Chain, belts, ropes, etc shall have valid certificates and inspected before use.
¾ Protection of lifting area by using barricade.
¾ Particular care shall be taken to maintain a clean/safe working environment.
¾ Housekeeping shall be continuously conducted and all wooden timber scrap/packing material
removed from site.
¾ Equipment shall be regularly maintained and kept free of fluid/oil leakage corrected.
¾ All produced waste will be disposal of according to approved waste management plan.
 
 

Page 13 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

Task / List of Type of damage Base Risk Mitigating Controls Residual Risk
Job Hazards (Without Control)
Steps
L S Risk L S Risk

I. Crane & Hoist Erection

A. Lifting,
Pushing, A.1 Injury to A.1 Where possible the requirement to
Pulling of
hands, feet and manual handle shall be eliminated by
Materials
back through cuts, making use of mechanical means such as
bruising, sprains cranes, hoists, forklifts, sack barrows and
and strains other proprietary lifting, pushing and
pulling tools.
A.2 Lifting
equipment failure A.2 Where lifting, pushing and pulling
cannot be avoided assessment shall identify
A 3 Load a safe system of work which shall include
fallingAE.4 the use of more than one person to carry out
Personnel trapped the required operation.
by lifting
equipment A.2a All lifting equipment will be checked
movement prior to start of work by Doosan Authorized
person.

A.2b Lifting equipment operator to carry


out daily checks to ensure the lifting
Injury 2 3 M equipment is fit for its purpose. 2 2 T

A.2c All lifting tools, cranes shall be Third


Party inspected & certified.

A.2.d Lifting area shall be barricaded &


kept clear of unauthorized person.

A.2e Competent signal man shall be


appointed.

A.3 Suitable periods of work and rest in


order to prevent fatigue shall be planned
into all operations.

A 4 Appropriate personal protective


equipment shall be. worn at all times.

A5. All loads will be lifted using the correct


rigging methods. Loads shall be secured
with minimum two tag lines.

B.1a The electrode and workpiece shall be


B. Cutting, regarded as electrically live.
Welding B.1 Fire and
explosion B.1b Place fire extinguishers nearby.
Injury
B.2 Electric shock B.1c A fire watchman shall be deployed at
incidents Effects on health 4 4 U the hot work location. And fire watchman
shall remain at site minimum one hour after
B.3 Fumes and Impacts on environment completion of hot work
gases
B.2a Welding gloves shall be sound, dry
B.4 Heat and used on both hands.

Page 14 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

 
B.5 Falls from a B.2b Only DC welding machine shall be
height used. In case of AC welding machine is to
be use must be equipped with VRD
B.6 Health
hazards B.3 Welders shall wear appropriate dry fire
proof clothing.
B.7 Environment
hazards B.4 Leads and equipment shall be inspected
prior to use.

B.5a A competent safety observer shall be


assigned to monitor

B.5b Maintenance of welding equipment


shall not be undertaken

B.5c Every effort shall be made to make the


area as dry and cool

B.6a Proper arrangements of ventilation


shall be made.

B.7a Waste electrode shall be collected in


separate waste drums & not to be mixed
with general waste

C.1a Ensure ladders of an adequate length for


C. Lifting
and C.1 Working at the purpose required and that are footed whilst the top
Positioning height
is tied
Injury 4 4 U 3 2 M
C.1b When working at height more than

1.8 m a safety harness shall be used.

Crushing 3 3 M 2 2 T
D. Crane D.1 Overturning D.1a Crane outriggers shall be deployed in
Stability of the crane
Collapse 3 3 M Accordance with manufacturer's instruction. 2 2 T
D.2 Collapse of
the ground
D. 2a Outriggers shall only be deployed on
beneath outriggers
Injury 3 4 S 2 2 T
firm level ground and fully extended.
D.3 Injury to 
operator in 
control cab  Injury 3 3 M D.3a Outriggers feet shall be fully 2 2 T
supported on purpose made pans or
D.4 Injury to adequate timbers.
personnel in crane
radius D.4a When outriggers are fully deployed
the drane shall be level with all wheels
clear on the ground sufficient
ballast/counterweight shall be in place.

D.4b A.S.L.I. shall be in good working contr

Cab computer read out shall match that o

Crane configuration. Cranes shall stop opera

in wind speeds greater than those laid down

Page 15 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

 
manufacturer.

E.1a Edge protection to be provided on all


E. Use of Injury 4 4 U
Access E.1 Fall of persons open ended platforms
Scaffolds/Ji
g E.1b Daily inspection of access platforms.

Injury/ Destruction 4 4 U E.1c All persons on access scaffolds to be

within safety lines.


Injury
E.1d Provide handrail or lifeline and always
/Death
use safety full body harness and hooking.
3 3 M
E.2 Fall of E.2a All equipment to be in good order.
materials 3 2 M
E.2b No materials to be thrown down under
any circumstances.

E.2c set up safety net to protect from falling


materials

E.2d Cleaning of platforms before any


E.3 Collapse of barriers are removed is essential.
scaffolds
E.3a Ensure scaffolds are inspected by
competent persons daily and before use

Injury 4 4 U 3 3 M
F. Use of F.1 Electric shock /Death F.1a Competent person to inspect daily on
Portable equipment.
Electric
Equipment - F.1b Visual inspection of all tools and
Hand Power cables before connection.
Tools
Conductive cable hangers shall be used to
run temporary cables.

F.1d Only competent persons to repair and


the inspect

F.1e Temporary cables shall not be run on


ground.

F.1f Power supply to all portable elect tools


shall be through ELCB

Page 16 of 21 
 
   
Doosan Heavy Industries 
Vietnam 
AES‐VCM 
   
METHOD STATEMENT FOR CRANE & HOIST ERECTION  

 
G. General G.1 Oil spill G.1a All stationary engine driven
activities Effects on environment 3 3 M
equipment shall be provided with secondary
containment trays.

G.1b All equipments shall be inspected


before entering to site for any oil leak or
excessive smoke.

G.1c Refueling shall be carried out by


providing a drip tray under the fuel nozzle.

10. JOB SAFETY ANALYSIS (JSA)

Page 17 of 21 
 
 

 
 
 
  JOB SAFETY ANALYSIS
  MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
  (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control, minimize or eliminating hazards.
 
 
Task: Erection of Cranes and Hoists
Prepared by: Reviewed by : Approved by:
 
Original Date : Revised by Rev. Date: Revision:
 
  Goggles Gloves Face Shield Barricade Needed Lock Out Dust Mask
Tag Out
 
Safety Harness Long Sleeves Hearing MSDS Group Fault Interrupter Others
 
Protection Needed/Review (Y/N)
 
Other Safety Equipment Required :
  Remarks : Describe job on general works for tank fabrication & Erection
  List of All Job Steps List of All Known Hazards How to Eliminate Hazards
 
  A. Lifting and Positioning A.1 Working at height A.1 Ensure ladders of an adequate length for the purpose required and that
  are footed whilst the top is tied
   
    A.2 When working at height more than 1.8m a safety harness shall be used.
   
    A.3 When placing counterweight rigging personnel must attach restrain
    lanyard, this will be secured to the inertia reel suspended from the mobile
  crane hook block Whilst placing counterweight the movement of rigging
 
  personnel may be restricted therefore hindering movement away from the
 
  load.
   
    A.4 Should this be the case assessment should be made and if necessary
    detach the lanyard and move to a different location.
   
   
 
 
 
 
 

Page 18 of 21 
 

 
 
 
  JOB SAFETY ANALYSIS
  MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
  (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control, minimize or eliminating hazards.
 
 
Task: Erection of Cranes and Hoists
Prepared by: Reviewed by : Approved by:
 
Original Date : Revised by Rev. Date: Revision:
 
  Goggles Gloves Face Shield Barricade Needed Lock Out Dust Mask
Tag Out
 
Safety Harness Long Sleeves Hearing MSDS Group Fault Interrupter Others
 
Protection Needed/Review (Y/N)
 
Other Safety Equipment Required :
  Remarks : Describe job on general works for tank fabrication & Erection
  List of All Job Steps List of All Known Hazards How to Eliminate Hazards
 
  B. Crane Stability B.1 Overturning of the crane B.1 Crane outriggers shall be deployed in accordance with manufacturer's
  instruction.
 
    B.2 Outriggers shall only be deployed on firm level ground and fully
    B 2 Collapse of the ground beneath extended.
    outriggers
    B.3 Outriggers feet shall be fully supported on purpose made pans or
  adequate timbers.
 
 
  B.3 Injury to operator in control cab B.4 When outriggers are fully deployed the drane shall be level with all
 
    wheels clear on the ground sufficient ballast/counterweight shall be in place.
   
    B.4 Injury to personnel in crane radius B.5 A.S.L.I. shall be in good working control. Cab computer read out shall
    match that of the crane configuration. Cranes shall stop operating in wind
    speeds greater than those laid down by the manufacturer.
 
 
 
 
 

Page 19 of 21 
 

 
 
 
  JOB SAFETY ANALYSIS
  MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
  (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control, minimize or eliminating hazards.
 
 
Task: Erection of Cranes and Hoists
Prepared by: Reviewed by : Approved by:
 
Original Date : Revised by Rev. Date: Revision:
 
  Goggles Gloves Face Shield Barricade Needed Lock Out Dust Mask
Tag Out
 
Safety Harness Long Sleeves Hearing MSDS Group Fault Interrupter Others
 
Protection Needed/Review (Y/N)
 
Other Safety Equipment Required :
  Remarks : Describe job on general works for tank fabrication & Erection
  List of All Job Steps List of All Known Hazards How to Eliminate Hazards
 
  C. Use of Access Scaffolds C.1 Fall of persons C.1a Edge protection to be provided on all open ended platforms
    C.1b Daily inspection of access platforms.
   
    C.1c All persons on access scaffolds to be within safety lines.
   
  C.2 Fall of materials C.1d Provide handrail or lifeline and always use safety full body harness
 
  and hooking.
 
 
  C.2a All equipment to be in good order.
 
   
C.2b No materials to be thrown down under any circumstances.
    C.3 Collapse of scaffolds
    C.2c Cleaning of platforms before any barriers are removed is essential.
     
    C.3a Ensure scaffolds are inspected by competent persons daily and before
  use
 
 

Page 20 of 21 
 

 
 
 
  JOB SAFETY ANALYSIS
  MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
  (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control, minimize or eliminating hazards.
 
 
Task: Erection of Cranes and Hoists
Prepared by: Reviewed by : Approved by:
 
Original Date : Revised by Rev. Date: Revision:
 
  Goggles Gloves Face Shield Barricade Needed Lock Out Dust Mask
Tag Out
Safety Harness Long Sleeves Hearing MSDS Group Fault Interrupter Others
Protection Needed/Review (Y/N)
Other Safety Equipment Required :
Remarks : Describe job on general works for tank fabrication & Erection
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
D. Use of Portable Electric Equipment D.1 Electric shock  D.1a Competent person to inspect daily on equipment.
- Hand Power Tools 
  D.1b Visual inspection of all tools and cables before connection.

D.1c Conductive cable hangers shall be used to run temporary cables.

D.1d Only competent persons to repair and the inspect

D.1e Temporary cables shall not be run on ground.

Page 21 of 21 