Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

Republic of the Philippines

CAMARINES SUR POLYTECHNIC COLLEGES


Nabua, Camarines Sur

College of Engineering

WORKSHEET FOR SIEVE ANALYSIS

Date:
Lab No.:

Project: Design Thickness of Base Course for Pervious Concrete Pavement


Kind of Materials: Item 201
Sampled at: Antipolo Young, Nabua, Camarines Sur
Original Source: Antipolo Young, Nabua, Camarines Sur
Sampled by: De Matta et al
Tested by: De Matta et al
Computed by: De Matta et al

SAMPLE 10
WT
OF
WT SIEV
WT OF E
OF SIEV W/ PERCENTA
DIAMETE
SIEV E SOIL GE CUMMULATIVE
R %
E W/ - WT RETAINED
PASSING
(g) SOIL OF
(g) SIEV
E
(g)
% WT.
RETAINED PASSING
50 450.2 0 0 0 0 2000 100
37.5 434.9 0 0 0.00 0.00 2000 100
25 444.5 0 0 0.00 0.00 2000 100
18 444.2 455.4 11.2 0.56 0.56 1988.8 99.44
12.5 393.8 472.8 79 3.95 3.95 1909.8 95.49
4 413.8 717.4 303.6 15.18 15.18 1606.2 80.31
1700. 1333.
0.355 366.4 66.70 66.70 272.3 13.62
3 9
0.075 357.9 602.2 244.3 12.22 12.22 28 1.40
PAN 273.8 301.8 28 1.4 1.40 0.00 0.00
TOTAL 2000
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

College of Engineering

SAMPLE 18
WT
OF
WT SIEV
WT OF E
OF SIEV W/ PERCENTA
DIAMETE
SIEV E SOIL GE CUMMULATIVE
R %
E W/ - WT RETAINED
PASSING
(g) SOIL OF
(g) SIEV
E
(g)
% WT.
RETAINED PASSING
50 450.2 450.2 0 0 0 2000 100
37.5 434.9 434.9 0 0.00 0 2000 100
25 444.5 475 30.5 1.53 1.53 1969.5 98.475
18 444.2 539.9 95.7 4.79 4.79 1873.8 93.69
12.5 393.8 538 144.2 7.21 7.21 1729.6 86.48
1562. 1149.
4 413.8 57.46 57.46 580.5 29.025
9 1
0.355 366.4 880.3 513.9 25.70 25.70 66.6 3.33
0.075 357.9 420.5 62.6 3.13 3.13 4 0.2
PAN 168.4 172.4 4 0.20 0.20 0.00 0.00
TOTAL 2000
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

College of Engineering

SAMPLE 20
WT
OF
WT SIEV
WT OF E
OF SIEV W/ PERCENTA
DIAMETE
SIEV E SOIL GE CUMMULATIVE
R %
E W/ - WT RETAINED
PASSING
(g) SOIL OF
(g) SIEV
E
(g)
% WT.
RETAINED PASSING
50 450.2 450.2 0 0 0 2000 100
37.5 434.9 434.9 0 0.00 0.00 2000 100
25 444.5 474 29.5 1.48 1.48 1970.5 98.525
18 444.2 490.6 46.4 2.32 2.32 1924.1 96.205
12.5 393.8 474.5 80.7 4.04 4.04 1843.4 92.17
4 413.8 822.1 408.3 20.42 20.42 1435.1 71.755
1233.
0.355 366.4 1600 61.68 61.68 201.5 10.075
6
0.075 357.9 541.8 183.9 9.20 9.20 17.6 0.88
PAN 273.8 291.4 17.6 0.88 0.88 0.00 0.00
TOTAL 2000

Remarks: _Satisfactory___________________________________________________________

Tested By: Checked By:

DE MATTA, CRISTINE ABIGAIL S.

NAORBE, MIA NICOLE B.


ENGR. ROWEL DOMINGO N.
OBELIDOR, REJEAN I. BERMAL
Laboratory-In-Charge
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

College of Engineering
PEÑA, MARY MARJORIE E.

PECUNDO, JOAN R.
CE 5C-STUDENTS

WORKSHEET FOR MOISTURE CONTENT

Date:
Lab No.:

Project: Design Thickness of Base Course for Pervious Concrete Pavement


Kind of Materials: Item 201
Sampled at: Antipolo Young, Nabua, Camarines Sur
Original Source: Antipolo Young, Nabua, Camarines Sur
Sampled by: De Matta et al
Tested by: De Matta et al
Computed by: De Matta et al

WEIGHT WT. OF CAN + WT. OF CAN + MOISTURE


SAMPLE LABEL AVERAGE
OF CAN MOIST SOIL DRY SOIL CONTENT
A 8.5 12.9 11.9 29.41 %
10 27.21 %
B 8.5 13.0 12.1 25.00 %
A 8.6 13.1 12.0 32.35 %
18 33.82 %
B 8.5 13.1 11.9 35.29 %
A 8.5 13.1 12.3 21.05 %
20 21.34 %
B 8.5 13.0 12.2 21.62 %

Tested By: Checked By:

DE MATTA, CRISTINE ABIGAIL S.


Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

College of Engineering
NAORBE, MIA NICOLE B.
ENGR. ROWEL DOMINGO N.
OBELIDOR, REJEAN I. BERMAL
Laboratory-In-Charge
PEÑA, MARY MARJORIE E.

PECUNDO, JOAN R.
CE 5C-STUDENTS
Remarks: _Adequate Moisture Content_______________________________________________

WORKSHEET FOR LIQUID LIMIT

Date:
Lab No.:

Project: Design Thickness of Base Course for Pervious Concrete Pavement


Kind of Materials: Item 201
Sampled at: Antipolo Young, Nabua, Camarines Sur
Original Source: Antipolo Young, Nabua, Camarines Sur
Sampled by: De Matta et al
Tested by: De Matta et al
Computed by: De Matta et al

SAMPLE 10

TRIAL NUMBER 1 2 3 4
Container’s Number A B C D
Container and wet soil, g 9.4 10.3 10.4 10.2
Container and dry soil, g 9.1 9.6 9.7 9.6
Wt. of Container 8.5 8.4 8.3 8.8
Mass of Dry soil, g 0.6 1.2 1.4 0.8
Mass of Pore Water 0.3 0.7 0.7 0.6
Moisture Content, % 50 58.33 66.6 75
7
Number of Blows 30 24 18 14
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

College of Engineering

SAMPLE 18

TRIAL NUMBER 1 2 3 4
Container’s Number A B C D
Container and wet soil, g 9.3 9.6 9.9 10.1
Container and dry soil, g 9.1 9.3 9.5 9.6
Wt. of Container 8.4 8.4 8.5 8.5
Mass of Dry soil, g 0.7 0.9 1.0 1.1
Mass of Pore Water 0.2 0.3 0.4 0.5
Moisture Content, % 28.57 33.3 40 45.45
3
Number of Blows 31 27 23 17

SAMPLE 20
TRIAL NUMBER 1 2 3 4
Container’s Number A B C D
Container and wet soil, g 10.9 11.1 10.2 10.3
Container and dry soil, g 10.3 10.4 9.7 9.7
Wt. of Container 8.6 8.6 8.6 8.5
Mass of Dry soil, g 1.7 1.8 1.1 1.2
Mass of Pore Water 0.6 0.7 0.5 0.6
Moisture Content, % 35.39 38.8 45.45 50
9
Number of Blows 33 26 22 16
Republic of the Philippines
CAMARINES SUR POLYTECHNIC COLLEGES
Nabua, Camarines Sur

College of Engineering

You might also like