WBS CODE ACTIVITY

E1.B02.06 Device installation & termination (750)


E1.B03.06 Device installation & termination (829)
E1.B04.06 Device installation & termination (718)
E3.ALL.01 FCU/DX/DAMPER Control Panel
E3.B1.07 No. of Data points completed
E3.B2.07 No. of Data points completed
E3.B3.07 No. of Data points completed
E3.B4.07 No. of Data points completed
E3.GF.07 No. of Data points completed
E3.L1.07 No. of Data points completed
E3.L2.07 No. of Data points completed
E3.L3.07 No. of Data points completed
E3.L4.07 No. of Data points completed
E3.L5.07 No. of Data points completed
E3.L6.07 No. of Data points completed
E3.L7.07 No. of Data points completed
E3.L8.06 FCU,DX Control Panel installation
M1.B2.08 Grilles and Diffusers Installation
M1.B3.08 Grilles and Diffusers Installation
M1.L01.05 identification label & excess threaded rod cutting
M1.L01.06 VCD Installation
M1.L01.07 MSFD, MSD & MD Installation
M1.L01.13 Duct Insulation &Acrostic Linear U nloding&Shifting
M1.L02.08 Grilles and Diffusers Installation
M1.L03.08 Grilles and Diffusers Installation
M1.L04.08 Grilles and Diffusers Installation
M1.L05.08 Grilles and Diffusers Installation
M1.L06.08 Grilles and Diffusers Installation
M1.L07.01 Ductwork installation (Fire Duct )
M1.L07.02 Duct Insulation&installation (GI Duct)
M1.L07.03 Duct Insulation&installation (MS)
M1.L07.06 VCD Installation
M1.L07.07 MSFD, MSD & MD Installation
M1.L07.08 Grilles and Diffusers Installation
M1.L08.02 Duct Insulation&installation (GI Duct)
M1.L08.05 identification label & excess threaded rod cutting
M1.L08.06 VCD Installation
M1.L08.07 MSFD, MSD & MD Installation
M1.L08.08 Grilles and Diffusers Installation
M2.B2.07 Chilled water pipe back Flushing for FCU &AHU
M2.B3.07 Chilled water pipe back Flushing for FCU &AHU
M2.B4.07 Chilled water pipe back Flushing for FCU &AHU
M2.L08.03 Installation of FCU & AHU Valve Packages
M2.L08.07 Chilled water pipe back Flushing for FCU &AHU
M2.RF.02 Chilled water pipe pressure test
M2.RF.03 Installation of FCU Valve Packages
M2.RF.04 Chilled water pipe insulation & Fostering, Identification labels
M2.RF.05 Installation of AHU Valve Packages
M3.B3.16 snag work with labeling
M3.B3.2 Installation of water & Drainge pipes
M3.GF.2 Installation of water & Drainge pipes
M3.GF.20 Installation of concealed fixtures and (Shower, bath and wash basin mixer,wc)
M3.L2.16 snag work with labeling
M3.L2.20 Installation of concealed fixtures and (Shower, bath and wash basin mixer,wc)
M3.L2.21 installation of wc brackets and supports(chair bracket, wall baracket)
M3.L5.2 Installation of water & Drainge pipes
M3.L6.12 Installation of CDP Insulation
SUPERVISOR ENGINEER NAME FOREMAN TRADE
Gopinath M. Vipin Gopal Muslimuddin Electrical
Gopinath M. Vipin Gopal Muslimuddin Electrical
Gopinath M. Vipin Gopal Muslimuddin Electrical
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Shilumon Kochunarayana Pillai BMS
Denis D Souza Vipin Gopal Shilumon Kochunarayana Pillai BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Shilumon Kochunarayana Pillai BMS
Denis D Souza Vipin Gopal Shilumon Kochunarayana Pillai BMS
Denis D Souza Vipin Gopal Shilumon Kochunarayana Pillai BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Denis D Souza Vipin Gopal Renjith Sreedharan BMS
Raveendran C. Rahul Shroti Mohammad Kaium Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palash Mondal Naresh Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palash Mondal Naresh Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palash Mondal Naresh Mechanical
Raveendran C. Rahul Shroti Palanisamy Subbiah Mechanical
Raveendran C. Rahul Shroti Palash Mondal Naresh Mechanical
Raveendran C. Rahul Shroti Palash Mondal Naresh Mechanical
Raveendran C. Rahul Shroti Palash Mondal Naresh Mechanical
Muralidharan Hesham S Chw
Muralidharan Hesham S Chw
Muralidharan Hesham S Fazil Mohammed Chw
Muralidharan Hesham S Fazil Mohammed Chw
Muralidharan Hesham S Chw
Muralidharan Hesham S Chw
Muralidharan Hesham S Chw
Muralidharan Hesham S Fazil Mohammed Chw
Muralidharan Hesham S Chw
Prabhu D. Shaikh Mohamad Muhammad Iqbal Shafiq Plumbing
Prabhu D. Shaikh Mohamad Plumbing
Prabhu D. Shaikh Mohamad Plumbing
Prabhu D. Shaikh Mohamad Muhammad Iqbal Shafiq Plumbing
Sajikumar Raman Shaikh Mohamad Plumbing
Sajikumar Raman Shaikh Mohamad Plumbing
Sajikumar Raman Shaikh Mohamad Plumbing
Sajikumar Raman Shaikh Mohamad Plumbing
Sajikumar Raman Shaikh Mohamad Plumbing
BASELINE PLANNED HOURS TOTAL QUANITTY BALANCE QUANTITY ACTUAL UNITS COMPLETED
2250 750 297 453
2475 829 199 630
2250 718 498 220
32584 888 275 613
21584 1349 1342 7
1176 147 147 0
1808 226 226 0
4464 558 558 0
21584 1349 939 410
2592 223 -8 231
1896 158 128 30
624 83 0 83
624 93 0 93
624 78 78 0
624 78 78 0
800 100 100 0
2736 342 342 0
472 189 125 64
470 188 134 54
150 6120 5980 140
803 265 180 85
240 36 13 23
408 490 429 61
1196 299 -94 393
1196 299 69 230
1160 290 266 24
1140 285 276 9
940 235 235 0
1076 400 290 110
3074 1000 389 611
215 52 0 52
450 113 76 37
250 38 29 9
380 95 95 0
1537 800 60 740
60 600 565 35
384 96 15 81
90 21 11 10
516 129 129 0
35520 888 888 0
5304 663 663 0
800 100 100 0
1060 32 7 25
52 32 32 0
134 14 0 14
850 18 0 18
152 143 0 143
850 11 0 11
680 150 41 109
8210 2065 1292 773
9500 2936 2266 670
156 34 9 25
520 350 0 0
985 108 0 0
1010 108 0 0
19450 150 0 0
385 380 0 0
ACTUAL MAN HOURS PROGRESS PERCENTAGE PRODUCTIVITY FACTOR
2273 60.4 1.67
2290 76 1.22
1250 30.64 1.81
5665 69.03 0.25
390 0.52 3.47
280 0 0
90 0 0
0 0 0
1800 30.39 0.27
945 103.59 0.35
140 18.99 0.39
600 100 0.96
590 100 0.95
0 0 0
0 0 0
0 0 0
0 0 0
433 33.86 2.71
232 28.72 1.72
90 2.29 26.2
360 32.08 1.4
263 63.89 1.72
366 12.45 7.21
958 131.44 0.61
458 76.92 0.5
46 8.28 0.48
0 3.16 0
0 0 0
340 27.5 1.15
976 61.1 0.52
100 100 0.47
92 32.74 0.62
230 23.68 3.89
10 0 0
1180 92.5 0.83
210 5.83 60.03
173 84.38 0.53
50 47.62 1.17
0 0 0
110 0 0
110 0 0
120 0 0
580 78.13 0.7
120 0 0
510 100 3.81
530 100 0.62
550 100 3.62
490 100 0.58
1123 72.67 2.27
2055 37.43 0.67
2160 22.82 1
381 73.53 3.32
0 0 0