KAUST Project Risk Management Plan
KAUST Project Risk Management Plan
KAUST Project Risk Management Plan
by
Revision History
Table of Contents
1. Project Overview.................................................................................................................4
3 Risk Identification...............................................................................................................7
4 Risk Categorization.............................................................................................................7
5 Risk Assessment..................................................................................................................9
1. Project Overview
King Abdullah University of Science and Technology (KAUST) can be considered as a small
town, which consists of 2500 villas for university staff, 80 student dormitories, restaurants,
supermarket, gas station, schools for staff children and university buildings. This small town
was built in two years upon the order of Saudi Arabia (KSA) king, and the construction time
of the university was relatively short based on the construction industry practices. This fast
pace of the project caused quality problems which were underestimated at the time of
construction to catch up the deadline. The university management decided to renovate the
buildings in 2018. Saudi Aramco (one of the biggest companies in Saudi Arabia) became the
The renovation of KAUST buildings will be in three phases. The first phase will be the 80
student dormitories, the second phase will include the 2500 villas, and the third phase will be
the university buildings. In all the stages, the buildings will be stripped to their shell and core
structure, and then an assessment will be made. The required reinforcements will be applied
to these buildings based on the assessments, and fine construction works will be executed
The first phase of the project is estimated to be $400,000,000 USD, and the total construction
area is 240,000 square meters. The project duration is estimated to be twenty-four months.
During the stripping works of the dormitories, the mechanical and electrical main
equipment will be removed carefully for reuse such as electrical panels, air conditioning
KAUST RISK MANAGEMENT PLAN 5
equipment, and heating system equipment. Utmost efforts will be given to avoid harming
Window frames, window glasses, and doors will be deinstalled carefully. An assessment
will be made for these items, and the ones in good condition will be stored and reused.
A new design will be developed based on the new shell and core structure, and on-site
Bill of quantities (BOQ) will be developed for progress payments and cost control.
Inside the university, there is a European way of the living environment which is a total
contradiction to KSA living style; therefore, accessibility to the university is tough. The
whole university area is surrounded by high walls, 70 km away from the city, and requires
KSA is very hot during summer times, and the temperature may rise to 60 to 70
Centigrade Celsius.
Saudi Aramco is an oil company, and its building process and procedures are rigorous,
and they are developed based on constructing oil refinery plants. The same process and
procedures will be applied to this renovation project which will delay approvals.
KAUST RISK MANAGEMENT PLAN 6
This Risk Management Plan (RMP) describes the processes used on the project to plan,
identify, assess, qualify, categorize, handle and track risks associated with the achievement of
the project requirements and goals for the KAUST project. The ultimate goal of RMP is to
increase the probability of project and activity success by focusing attention on problem areas
early and reducing the amount of costly rework in the future. For every risk, there is the
potential impact of cost overruns, schedule delays and compromises in quality and safety if
the risk occurs. Hence, risk management will be applied continuously throughout the KAUST
project life cycle and will evolve and adapt to accommodate the various project phases. In the
risk response plan table, status of the risk will be identified as potential, active and closed. For
the closed risks, contingency reserves will be returned through change orders.
Managing risk is a crucial element of the project management process for both the planning
and the performance phases of the KAUST project. This RMP develops a methodology to
identify, qualify specific risks to the project, determine their consequences and associated
probability, develop and implement risk responses, and control and track risks. The risk
3 Risk Identification
Insufficient Design
Delays in Preparation of Submittals
Delays in Approvals of Submittals
Material, Labor and Equipment Resourcing
Poor Management Coordination
Conflicts for Additional Work Item Prices
Conflicts between Parties
Insufficient Technology / Skills
Unforeseen Construction Works
Damaging Materials and Equipment During Deinstllation and Carriage
Inadequate Safety Measures
Inadequate Construction Quality
Insufficient Construction Productivity
Delays in Payment
Inadequate claim administration
Poorly Tailored Contract Forms
Supplies of Defective Materials
Adverse Weather Conditions
Accessibility to Site
Cultural Work Differences
4 Risk Categorization
Four types of risk categorizations are identified for this project. These categorizations are:
5 Risk Assessment
Risk level assessment is done by determining the probability of the occurrence and cost and
schedule the consequence of each risk. Consequence will consider foreseeable cumulative
impact on cost and schedule. After this assessment, the risks are prioritized to avoid or to
The following risk probability levels are assessed for each risk.
When the risk occurs, the consequence table defines the risk value and consequences based on
cost and schedule.
A risk severity matrix determined from the Overall Consequence Level and the Risk
Probability Level provides the overall assessment of each identified risk as shown below.
Severity Score
VL(5) 5 10 15 20 25
L(4) 4 8 12 16 20
Probability
M(3) 3 6 9 12 15
S(2) 2 4 6 8 10
VS(1) 1 2 3 4 5
N(1) L(2) M(3) H(4) VH(5)
Consequence
Items with a risk severity level of 8 or greater must be entered in the KAUST project
Contingency Plan.
Risk scores table below shows description of risks, their triggers, risk scores, and risk zones.
Risk No. Risk Identification Risk Description Risk Risk Trigger Risk Risk Risk Risk
Category Probabilit Impact Score Zone
y
Risk No. Risk Identification Risk Description Risk Risk Trigger Risk Risk Risk Risk
Category Probabilit Impact Score Zone
y
Risk No. Risk Identification Risk Description Risk Risk Trigger Risk Risk Risk Risk
Category Probabilit Impact Score Zone
y
S-005 Inadequate Construction Poor construction Site Poor skilled labor 3 4 12 Orange
Quality quality
E-003 Accessibility to Site Long worker queues External Strict security 4 5 20 Red
at the control gates controls
KAUST RISK MANAGEMENT PLAN 15
Risk No. Risk Identification Risk Description Risk Risk Trigger Risk Risk Risk Risk
Category Probabilit Impact Score Zone
y
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
Potentia PMO-001 Insufficient PMO Yellow Schedule Mitigate * Add buffer * Work overtime to Design
l Design time to the work rectify the design Manager
schedule for * Ask the assistance
design and do of the Sponsor for
not reveal to fast approval
project team
* Control of the
design
* Approval of
the Sponsor
Potentia PMO-002 Delays in PMO Yellow Schedule Mitigate * Provide * Work overtime Project
KAUST RISK MANAGEMENT PLAN 17
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
l Preparation of sufficient * Request the Manager
Submittals workforce Sponsor assistance
for approval if
necessary
Potentia PMO-003 Delays in PMO Orange Schedule Mitigate * Communicate * If the delay Document
l Approvals of and remind exceeds the Control
Submittals Sponsor on a Sponsor's Department,
regular basis for contractual Project
the approvals obligations, write an manager
official letter to the
Sponsor for time
claim for each day
of delay
KAUST RISK MANAGEMENT PLAN 18
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
Potentia PMO-004 Material, PMO Yellow Schedule Mitigate * Work with * Contact other Human
l Labor and and Cost people who have project managers of Resources
Equipment expertise the company for Manager,
Resourcing * Identify the available resources Procurement
resources during * Contact pre- Manager
the planning identified sub-
stage contractors
Potentia PMO-005 Poor PMO Yellow Schedule Mitigate * Prepare a * Request an Project
l Management and/or communication immediate meeting Manager
Coordination Cost management
plan
* Regular
meetings
KAUST RISK MANAGEMENT PLAN 19
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
Potentia PMO-006 Conflicts for PMO Red Schedule Mitigate * Earn the trust * If possible, make Commercial
l Additional and/or of the Sponsor compromises Manager,
Work Item Cost * Prepare change * If necessary, go to Contract
Prices order documents mediation Manager,
with sufficient * Try to avoid Project
justifications litigations Manager
Potentia PMO-007 Conflicts PMO Orange Schedule Mitigate * Good * If possible, make Project
l between and/or communication compromises Manager
Parties Cost * Integrity * If necessary, go to
mediation
* Try to avoid
litigations
Potentia S-001 Insufficient Site Orange Schedule Transfer * Outsource to * Contact pre- Procurement
KAUST RISK MANAGEMENT PLAN 20
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
l Technology / and/or parties that have identified sub- Manager,
Skills Cost the technology contractors Construction
and skills. * Contact other Manager
project managers for
available resources
Potentia S-002 Unforeseen Site Yellow Schedule Mitigate * Regular * Plan the works to Construction
l Construction and/or walkthrus be executed and Manager
Works Cost assess the time/cost
impact
Potentia S-003 Damaging Site Red Schedule Transfer * Outsource to * Order the Construction
l Materials and and/or specialized sub- damaged goods Manager
Equipment Cost contractors immediately
During
KAUST RISK MANAGEMENT PLAN 21
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
Deinstallation
and Carriage
Potentia S-004 Inadequate Site Red Schedule Mitigate * Health and * 24/7 doctor and HSE
l Safety and/or Safety Training nurse on site Manager
Measures Cost (HSE) * 24/7 ambulance on Construction
* HSE signs site manager
* HSE constant
controls
Potentia S-005 Inadequate Site Orange Schedule Mitigate * Provide skilled * Re-do the work Construction
l Construction and/or labor with the desired Manager
Quality Cost * Daily control quality
of works
* Award system
KAUST RISK MANAGEMENT PLAN 22
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
to labors for
good quality of
work
Potentia S-006 Insufficient Site Orange Schedule Mitigate * Provide award * Work overtime to Construction
l Construction system tp cover delays Manager
Productivity workers * Replace workers
with the productive
ones
Potentia F-001 Delays in Financial Yellow Cost Mitigate * Get pre- * Ask for the Project
l Payment approval of the assistance of the Manager
Sponsor before Sponsor Commercial
formal Manager
submission
KAUST RISK MANAGEMENT PLAN 23
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
Potentia F-002 Inadequate Financial Yellow Cost Mitigate * Pre-approval * Ask for a meeting Project
l claim of the Sponsor to clarify issues Manager
administration before formal
submission
Potentia F-003 Poorly Financial Yellow Schedule Mitigate * Kick-off * Amendment of the Contract
l Tailored and/or meeting contract manager,
Contract Cost Project
Forms Manager
Potentia E-001 Supplies of External Orange Schedule Mitigate * Warn vendors * If possible, acquire Procurement
l Defective for proper material as soon as Manager
Materials packing possible
* Put penalty * If not possible, ask
clauses on for immediate
KAUST RISK MANAGEMENT PLAN 24
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
contracts for the replacement and
damaged items assess delay.
Potentia E-002 Adverse External Red Schedule Mitigate *Track weather * Stop work and Construction
l Weather reports and plan work overtime to Manager
Conditions site work compensate the loss
accordingly of delay
Potentia E-003 Accessibility External Red Schedule Mitigate * Provide * Work overtime to Human
l to Site transportation to compensate the Resources
gates 2 hours delay Manager
earlier than the
start of the work
Potentia E-004 Cultural Work External Yellow Schedule Mitigate * Provide * Put disciplinary Human
l Differences and/or cultural action in case of Resources
KAUST RISK MANAGEMENT PLAN 25
The Risk No. Risk Risk Risk Primary Risk Risk Response Contingency Plan Risk Owner
below Identification Category Zone Risk Strategy Plan
tables Impact
shows Area
the risk
strategie
s, risk
response
plan,
continge
ncy plan
and
assigned
responsi
ble
persons
to
risks.Sta
tus
Cost awareness cultural assault Manager
training