NPI
APP – Non Production installation PI – Production Installation
i A - Material Change/Dismantlement IMT – Inspection Management Team
MC/Dm Responsible Informed Approved by Administered by
D
(Day Numbers)Completion Window
Submission
Acceptance
Assessment
Technical Assessment
Management
Topic Specialist
(CUBS)Topic Specialist Administrator
(IMT Admin)Co-OrdinatorSafety Case
Duty Holder (Operator/Owner)
(CM)Case Manager
Responsible Person
(Time recording category: Assessment)
MANAGEMENT ROLES
Case Manager – responsible overall for managing assessment teams to process allocated safety cases in accordance with this procedure.
Deputy Case Manager – responsible for managing the co-ordinated effort of topic specialists’ assessment of assigned safety cases.
Topic Team Leader – responsible for the management and quality of safety case technical assessments allocated to the topic team.
iii i
If you require the role to be reassigned
send an email to scr05@hse.gsi.gov.uk .
Assign Roles via Portal and create COIN
1 CUBS in OPRED will manage EI and EO
Case
2 1 assignment.
1
A COIN Case is only for work recording
purposes only
i
Confirm, via portal if in agreement with
16-30 Confirm and advise if agree with Assessment Instruction. You must
4 16-30 assessment instruction respond within 10 working days of receipt
16-30 of the Assessment Instructions
5
TSs must adhere to the scope identified
in the Assessment Instruction.
16 - 40
a) Read and assess Safety Case
16 - 170
16 – 40 as per Assessment Instructions.
Reassessment of previously accepted
information is not required.
NPI
APP – Non Production installation PI – Production Installation
i A - Material Change/Dismantlement IMT – Inspection Management Team
MC/Dm Responsible Informed Approved by Administered by
D
(Day Numbers)Completion Window
Submission
Acceptance
Assessment
Technical Assessment
Management
Notes
(Operator/Owner)Duty Holder
AdministratorTopic Specialist
Topic Specialist
(CM)Case Manager
Responsible Person
(Time recording category: Assessment)
17-59
Respond formally to NAI(s) and address
17-104 Via Portal
17-59 any Clarification(s)
APP
Review NAI response(s) from Dutyholder
NAI inadequate response template
16-59 if you are not satisfied with the response
upload and forward via the portal.
you should return to the Dutyholder
Monitor progress with Topic Assessment
Reports, Responses viewed via
i
Milestones on portal. Where there is a
delay in response or an inadequate
response from the Duty Holder
(Operator/Owner) the Case Manager
should consider the impact on the
acceptance decision date and whether an
60 - 66
extension may be necessary. Any
6 105 - 120 Undertake Stocktaking Exercise.
60 - 66 extensions to the acceptance decision
date should be agreed by the Case
Manager, and you must inform the
DutyHolder (Operator/Owner) of the
change in acceptance date. The
dutyholder will require to agree any
changes to the acceptance deadline date
and this should be reflected in the Portal
via Communications.
APP
Attach finalised Topic Assessment
Report, including completed Topic
16 - 80 Assessment Template, and other relevant
Assess response(s) as necessary and
7 18 - 170 communication onto portal
18 - 80 finalise the Topic Assessment Report.
NPI
APP – Non Production installation PI – Production Installation
i A - Material Change/Dismantlement IMT – Inspection Management Team
MC/Dm Responsible Informed Approved by Administered by
D
(Day Numbers)Completion Window
Submission
Acceptance
Assessment
Technical Assessment
Management
Notes
(Operator/Owner)Duty Holder
AdministratorTopic Specialist
Topic Specialist
(CM)Case Manager
Responsible Person
(Time recording category: Assessment)