GIVEN

Number of storeys=4

Height of each storey =4m

Total cost of construction=20L

Percentage of material cost=45%=9 L

Waste for landfill=25 tons

Density of waste =900 kg/m3

Percentage of bricks reused =25%

Rest 75% new bricks which has 30% fly ash content

Price of 1 fly ash brick=6rs

Price of 1 conventional brick =3rs

Sl particulars Reused part Demolished part Total


no
1 SLAB +ROOF AREA 6x4x5=120 m2 4x3x5=60 m2 180 m2

2 Wall area [(6.6+4)X2X4X4]=339.2m2 [(4.6+3+3)X4X4]=169.6 508.8 m2


m2
3 Door and window [(1.5x2)+(1.5x2.3)]x4=25.8 m2 [(1.5x2.3)+(1x2)]x4= m2 47.6 m2
deduction
4 Net masonry area 339.2-25.8=313.4 m2 169.6-21.8=147.8 m2 461.2 m2

5 Foundation plan area 6x4=24 m2 4x3=12 m2 36 m2

6 A. MRC1=

7 Fly ash bricks cost

8 RCV

9 B. MRC4=

1
As per IGBC Material and Resource category:

How many points the team may get under MRC 1.1: Building Reuse

Total area of including slab + roof area, net masonry area and foundation plan area=180+461.2+36

=677.2 m2

Area of sturctural elements Retained (re-used) =120+313.4+24

[ Slab area + roof area+ net masonry area + foundation plan area] = 457.4 m2

Percentage of retained = [ 457.4/677.2]x100 = 67.54% which is greater than 50%

Ensure at least 50% (by area) of the structural and/or at least 25% (by area) of the non-structural
(interiors) elements of the existing building are retained.

SL PARTICULARS PERCENTAGE RETAINED POINTS


NO AWARDED
1 Structural elements 67.54% > 50% 1

Total points earned under MRC 1.1: Building reuse = 1 points

2
How many points may be achieved under MRC 1.3: Recycled content

Total cost of construction=20L Rs

Percentage of material cost=45%=9 L Rs

Cost of total recycled content = RCV = 147.8x0.3x500x0.25x3

=16627.5 Rs

Percentage of Materials with Recycled Content = [16627.5/900000]x100 = 1.847%

Use materials with recycled content in the building (as per owner / developer’s scope) such that
the total recycled content constitutes at least 10% of the total cost of building materials.

SL PARTICULARS PERCENTAGE POINTS


NO AWARDED
1 Total recycled content 1.8147% < 10% 0

Total points awarde under MRC 1.3: Recycled Content = 0 points