Number of storeys=4
Rest 75% new bricks which has 30% fly ash content
6 A. MRC1=
8 RCV
9 B. MRC4=
1
As per IGBC Material and Resource category:
How many points the team may get under MRC 1.1: Building Reuse
Total area of including slab + roof area, net masonry area and foundation plan area=180+461.2+36
=677.2 m2
[ Slab area + roof area+ net masonry area + foundation plan area] = 457.4 m2
Ensure at least 50% (by area) of the structural and/or at least 25% (by area) of the non-structural
(interiors) elements of the existing building are retained.
2
How many points may be achieved under MRC 1.3: Recycled content
=16627.5 Rs
Use materials with recycled content in the building (as per owner / developer’s scope) such that
the total recycled content constitutes at least 10% of the total cost of building materials.