We have to know the process of boiler before looking into the P&ID 26 diagram. The main system commonly found in all types of boiler 8
manufacturing is:
Steam drum
Downcomer
Furnace
Separator / cyclone
Backpass / Heat Recovery Area (HRA)
Feed water pipe
Economizer
Superheater (low, medium & high temperature)
Connecting Pipes (upper & lower)
Main Steam Pipe
https://automationforum.in/t/p-id-diagram-for-boiler/5838 1/5
3/18/2020 P&ID diagram for Boiler - Industrial Automation - Industrial Automation, PLC Programming, scada & Pid Control System
p&idboiler.jpg879×676 116 KB
https://automationforum.in/t/p-id-diagram-for-boiler/5838 2/5
3/18/2020 P&ID diagram for Boiler - Industrial Automation - Industrial Automation, PLC Programming, scada & Pid Control System
Process fuel (coal, limestone, oil) until it becomes ash remaining combustion
https://automationforum.in/t/p-id-diagram-for-boiler/5838 3/5
3/18/2020 P&ID diagram for Boiler - Industrial Automation - Industrial Automation, PLC Programming, scada & Pid Control System
Economizer
Here the temperature will be raised slowly before reaching the next system
Steam drum
From the economizer, water is then supplied to the steam drum through a pipe. At the beginning of the process, when steam (water vapour) has not
reached saturated steam, the separator in the steam drum will bypass and let the water go down to the next stage.
Downcomer:
Here, a downcomer in the form of a pipe flows water to the bottom of the next system via lower connecting pipes.
Furnace:
Water from the downcomer will enter the furnace at the bottom and be store inside. The bottom header is then due to the coal combustion system,
oil and limestone inside. Furnace, will slowly change shape to wet steam. According to its nature, steam will propagate up by itself in the tube
(because of the constant heating process in the boiler).
This is where the energy conversion system happens. After that, the steam will be supplied again to the steam drum through the upper connecting
pipes, and, back.
Superheater:
Here there are several times a backpass (feedback) steam from low-temperature superheater to superheater medium temperature then supplied to
the steam drum, then return to high-temperature superheater / final superheater. In the high/final temperature superheater, this is the last process of
steam after repeated heating in the superheater low and medium.
Main SteamPipe:
https://automationforum.in/t/p-id-diagram-for-boiler/5838 4/5
3/18/2020 P&ID diagram for Boiler - Industrial Automation - Industrial Automation, PLC Programming, scada & Pid Control System
This is the most important pipe in the power plant process because this pipe will supply superheated steam to the turbine. The material, the welding
wire and the test (Non Destructive Test) are classified as special because they require special treatment and a special team to do it. This is where
the highest temperature and pressure in the boiler is located.
https://automationforum.in/t/p-id-diagram-for-boiler/5838 5/5