Professional Documents
Culture Documents
Monthly Maintenance Schedule of HVAC System
Monthly Maintenance Schedule of HVAC System
HVAC System
Monthly Maintenance Schedule for April, 2020
Date Description Location Time Remarks
09.00-
1st April 20 AHU, VFD, All Kind of Diff. & Grill GR Floor
18.00
Fresh air exhaust fan and all kind of 09.00-
2nd April 20 B-1, B-2, B-3
diffuser 16.00
3rd April 20 Friday
09.00-
4th April 20 Cooling tower-1,2&3 Maintenance Roof top Saturday
16.00
AHU, VFD, All Kind of Diff. & Grill 1st floor & roof 09.00-
5th April 20
and pressurization fan 1,2,3 clean top 16.00
09.00-
6th April 20 AHU, VFD, all kind of Diff. & grill, 2nd floor
16.00
09.00-
7th April 20 AHU, VFD, all kind of Diff. & grill, 3rd floor
16.00
Chilled water and condenser water pump Roof top & 12.00-
8th April 20
maintenance & chiller clean chiller plant 16.00
12.00-
9th April 20 AHU, VFD, all kind of Diff. & grill, 4th floor
16.00
10th April 20 Friday
12.00-
11th April 20 AHU, VFD, all kind of Diff. & grill, 11th floor Saturday
16.00
12.00-
12th April 20 AHU, VFD, all kind of Diff. & grill, 5th floor
16.00
PAHU, Chiller plant Exhaust fan, Roof top & 09.00-
13th April 20
maintenance chiller plant 16.00
09.00-
14th April 20 Cooling tower-1,2&3 Maintenance Roof top
16.00
12.00-
15th April 20 AHU, VFD, all kind of Diff. & grill 6th floor
16.00
FCU, Split type AC, air cutter, 09.00-
16th April 20 Lift, & Lounge
maintenance 16.00
17th April 20 Friday
12.00-
18th April 20 AHU, VFD, all kind of Diff. & grill 13th floor Saturday
16.00