Professional Documents
Culture Documents
Factory Overhead Budget
Factory Overhead Budget
Factory Overhead Budget
Fixed Overhead B)
Variable overhead C) Fixed overhead rate E)
Total Budgeted D) Variable Overhead F)
Overhead Standard overhead G)
rate
REQUIRED
1. Compute for the missing amounts.
2. What is the budgeted FOH if adjusted based on 7,500 actual hour
3. What is the budgeted FOH if adjusted based on 8,000 standard