Professional Documents
Culture Documents
15 Towers - Deviation Sheet - 149182-TRASH CHUTES
15 Towers - Deviation Sheet - 149182-TRASH CHUTES
Sr.
Category Latest SPEC No. Page Spec Description Deviation
No.
2.1 PERFORMANCE 2.1 PERFORMANCE
REQUIREMENTS REQUIREMENTS 1. Test Pressure:
1. Test Pressure: Test at atmospheric Test at atmospheric (neutral) pressure
(neutral) pressure according to NFPA according to NFPA 252 (82) or UL 10B
252 or finish with 1.5 hr fire rating.
UL 10B. 2. Intake Doors: Side hanged intake door
2.Intake Doors: Labeled, 1-1/2-hour fire- Labeled, NFPA 82 standards and UL
resistance rated with 30-minute 10B, 1-1/2-hour fire-resistance rated
temperature rise of 140 deg C. with 30-minute temperature rise of 140
TRASH CHUTES
B. Discharge-Door Assemblies: Fire- deg C.
149182 -
149182 - resistive door construction Labeled, 1- B.Discharge-Door Assemblies: have no
1 Special Equipment E18066-0100D-FD-
Page 3of 7 1/2-hour fire resistance rated according UL certificate or NFPA 252,but
00-G00-SPC-15A-
to NFPA 252 or UL 10B requirements complied with Fire-resistive door
ME-01 REV 2
for fire-rated door assemblies. construction Labeled, 1-1/2-hour fire
C.Electrical Components, Devices, and resistance rated .
Accessories:Listed and labeled as C.Electrical Components, Devices, and
defined in NFPA 70, by a qualified Accessories:Listed and labeled as
testing agency, and marked for intended defined in NFPA 70,or CE,or IEC,or
location and application. Make List, by a qualified testing agency,
and marked for intended location and
application.