Assignment CMPM
Assignment CMPM
Microsoft Project
Primavera Project Planner
Sure Trak
ABT Project Workbench
Project Scheduler 7
Power Project
Milestone
Others
Microsoft Project
According to PMI Survey – March 2000, Microsoft Project is the most widely used project
management tool available today.
Easy
GUI
Cheap
Standard
Primavera Products
Since 1983, Primavera Systems, Inc. has helped the engineering and construction industries
deliver more than $4.5 trillion worth of projects to date. ENR has ranked Primavera as the most-used
project management software in the industry. The reason for this is trust.
SureTrak
Primavera Project Planner
Primavera Engineering & Construction
Expedition
Primavera Contractor
Prime Contract
Primavera Project Planner (P3)
P3 is the recognized standard for high-end, high-performance scheduling and resource control.
A multi-project, multi-user project and resource planning and scheduling
To review important notations in weekly meetings to set up action lists/agendas and improve
performance through discussion.
To compliment good reports that briefly convey important items.
Daily reports are working documents of the business.
Daily Reports are documents that can testify the activities that did happen or did not happen
but should have happened on site.
It can be introduced in court as evidence of the activities on site.
Inaccuracies
Self-serving statements
Inconsistencies
Loss of records
Types of Construction
Engineers concerned with direct fieldwork must allocate the work to the various agencies under
their control, arrange for materials and equipment, and ensure that the works are carried out by the
workers as per the specifications laid down and as per drawings given to them by the planners. They
would have to also ensure that the work is carried out as per the given schedule, and this would require
constant monitoring of the productivity of the workers under their control. The safety of the workers
has also to be ensured by the engineer. On large sites, separate engineers would be concerned with the
laying out of the work and the measuring it after it is completed. A separate QA QC section would also
oversee the necessary quality.
There is also substantial amount of work that has to be done off site in any construction project.
This can involve detail scheduling and monitoring of progress to ensure that the work is within the time
schedule envisaged by the owners or stakeholders. Attention is also required to be paid to procurement
of the materials to ensure that the schedule of construction is not interrupted. Provision of temporary
facilities like offices, storage space, water supply, electricity, and security may require the attention of
the engineer.