Bills of Materials Retaining and Perimeter Wall 29032019

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

WALLING

Cement Bags 210 30000 6,300,000


sand Trucks 1 1300000 1,300,000
COLUMNS AND
Aggregates Trucks 2 1800000 3,600,000
RING BEAM
R8 Roll 202 16500 3,333,000
H16 Roll 200 65000 13,000,000
Cement Bags 150 30000 4,500,000
Sand Trucks 2 1300000 2,600,000
BLOCK WORK
blocks pc 6500 2000 13,000,000
Hoop iron rolls 50 60000 3,000,000
6"X1" pc 320 7000 2,240,000
TIMBER Props pc 150 3500 525,000
Nails kg 100 3500 350,000
BINDING WIRE 50KG Roll 6 200000 1,200,000
SubTotal 54,948,000
Labor 21,979,200
Total Perimeter Wall 76,927,200