MS For Trestle Assembly
MS For Trestle Assembly
MS For Trestle Assembly
Document
Project BASED POWER PROJECT AT ERECTION OF PHP CONVEYOR
SOUTH AKANYARU, RWANDA. Title TRESTLE ASSEMBLY
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 1 of 9
PROJECT:
2X35 MW PEAT FIRED POWER PLANT
AT SOUTH AKANYARU, RWANDA.
EMPLOYER:
YUMN LIMITED
EMPLOYER’S ENGINEER:
SWECO INTERNATIONAL AB
SUPPLIER:
SHAPOORJI PALLONJI & CO. PVT. LTD.
(EPC DIVISON)
SUBMISSI
ON
REVISION STATUS R2
CATEGOR
Y
SIGN
INITIAL
S
SIGN
2 INITIAL S
25.09.2019
SK SK
S J
SIGN
1 24.09.2019
INITIAL S
SK SK
S J
SIGN
0A FIRST ISSUE 21.09.2019
INITIAL S
SK SK
S J
CV EL IC ME QA AP
PR DETAILS OF
DATE
OV REVISION
REV CLEARED
ED
SPEPC
2X35 MW PEAT METHOD STATEMENT FOR
Document
Project BASED POWER PROJECT AT ERECTION OF PHP CONVEYOR
SOUTH AKANYARU, RWANDA. Title TRESTLE ASSEMBLY
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 2 of 9
(1) Objective:
The purpose of this method statement is to describe required resources and procedure for
the erection of Conveyor Trestle at PHP area.
(3) Resources:
A) Manpower
The workforce planned for this operation would include:
Section Engineer/Supervisor 1
Rigger Foreman 1
HSE Supervisor 1
Riggers 4
B) Equipment’s Required
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 3 of 9
Two guide ropes will be tied up with both ends of the trestle assembly for
movement of the trestle assembly and minor adjustments.
Trestle assembly will be lifted with the help of one crane of capacity 70 MT /180 MT
as per the lifting plan mentioned below.
Trestle assembly will be lowered into the foundation in as per drawing.
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 4 of 9
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 5 of 9
2X35 MW PEAT METHOD STATEMENT FOR
Document
Project BASED POWER PROJECT AT ERECTION OF PHP CONVEYOR
SOUTH AKANYARU, RWANDA. Title TRESTLE ASSEMBLY
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 6 of 9
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 7 of 9
LIFTING PLAN:
2X35 MW PEAT METHOD STATEMENT FOR
Document
Project BASED POWER PROJECT AT ERECTION OF PHP CONVEYOR
SOUTH AKANYARU, RWANDA. Title TRESTLE ASSEMBLY
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 8 of 9
Document Number SP – YUMN –00 – CQC – CQI –MS– 0005 Revision 0A Sheets 9 of 9
Lifting activity of Trestle will be performed with one crane (Crane capacity: 70 MT / 180 MT).
Put trestle into the foundation and provide proper welding to the same.
Crane will be released after completion of welding.