Review the Training Plan and verify that the content is sufficient for plant
BIQS -24 needs.
Operation 1
Operation 2
Operation 3
Operation 4
Operation 5
Operation 6
Job: Step 1 - Prepare Team Member
A. Review Safety Documentation/Information & Safe Operating Practices.
B. Plant Safety (Example: Evacuations/Take Shelter, HazMat Proc. M obile Equ/Orange Crush)
C. Personal Safety (Example: M edical [5222/911], Pedest Safety/Walkw ays, Lockout, Conveyor)
D. Product Safety (Example: Safety & Mutilation Protection Equipment, Paint Clean Bldg Policy)
Step 2 - Present Operation
E. Review Department (Example: PM P-Product M aintenance Partnership, Job Rotation Log)
F. Review Workstation Documentation (Example: Blue Board/Blue Book, SOS/JES, STS/TIS, CVIS)
G. Demo the Line (Example: Error Proof Devices, Andon & Escalation Proc, Part Routing/M aterial Call)
H. Demo the Job (Example: TAY, PS1 Joint/Fastener(s), E-Stops/Overtravels, Ergo assist & Tools)
I. Demo specialized tooling, equipment, lift assist
J. Review specialized safety precautions/issues, hazards, restrictions
K. Certify the T/M to 1/4 on flexibility chart (must complete steps for all models)
Step 3 - Try-Out Performance
L. Explain Steps (Major Steps, Key Point, & Reason Why)
Directrices Date
our miembros
Pasos (Harvey Ball). Entreviste a algunos suppliers achieve
de equipo launch
acerca and
quality excellence.
de cómo
X.
Y.
Attend Job Instruction Training Course
Certify T/M to 4/4 on flexibility chart
T/M T/L G/L
valoración
• Scorecard /resultados de Planta
Necesita
Capacitación • Iniciativas Regionales /Globales
Disponible • Encuesta del Empleado
• Situación de la Contratación
Programas de
• Evaluaciones de Desempeño
Capacitación
(Cursos y Métodos)
Necesita Valoración / Datos Existentes
Directrices
El plan de formación y calendarioMISSION: To be leaders
se realiza anualmente of an
basándose enterprise
en las necesidadesapproach to ensure
de planta y apoyados por el Liderazgo.
ourque
Revisar el Plan de Formación y verificar suppliers
el contenidoachieve launch
es adecuado and
para las quality de
necesidades excellence.
la planta.
Verificar que la formación está siendo realizada conforme al plan. ¿Está a tiempo?
Plan de Capacitación Anual – Cursos Obligatorios y Disponibles Inputs para TM – Plan de Capacitación:
•
Annual Training Plan 2016 / SQ&D GMM
Course Target
Plan de Capacitación Anual
• (Ejemplo)
Content number Duration group Method Location Instructor Timetable Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
PFMEA
PFMEA
6 hours
6 hours
SQE/SQO
SQE/SQO
Classroom Ramos
Classroom Silao
Mark Waligora
Mark Waligora
9:00 AM - 4:00 PM
9:00 AM - 4:00 PM
X
X
Infor del Gráfico de Flexibilidad TM – Plan de Capacitación
Dimensional Apprentice
DFSS - Part 1
DFSS - Part 1
16 hours
33341 20 hours
33341 20 hours
SQE/SQO
SQ&D
SQ&D
Classroom Ramos
Classroom Ramos
Classroom Toluca
Daniel Barrera
C. Uribe / G. Davila
F. Bobadilla
8:00 AM - 5:00 PM
8:00 AM - 5:00 PM / 12:00 PM
8:00 AM - 5:00 PM / 12:00 PM
X
X
X
• Evaluación de Capacitación Individual Operations - Training Plan
AREA:
DFSS - Part 1 33341 20 hours SQ&D Classroom SLP A. Bancia / R. Perez 8:00 AM - 5:00 PM / 12:00 PM X GL Month Month Month
Week Week Week Week Week Week Week Week Week Week Week Week
Dimensional Apprentice 16 hours SQE/SQO Classroom Ramos Daniel Barrera 8:00 AM - 5:00 PM X Team ID Name
Station Operation Operation Operation
DFSS - Part 1 33341 20 hours SQ&D Classroom Silao J. Ceballos / D. Arredondo 8:00 AM - 5:00 PM / 12:00 PM X
BIQ - S 8 hours SQE/SQO Classroom Toluca C. Bispo/L. Mata 8:00 AM - 5:00 PM X
BIQ - S 8 hours SQE/SQO Classroom SLP A. Sandoval 8:00 AM - 5:00 PM X
SPC 8 hours SQ&D Classroom Guanajuato AIAG 8:00 AM - 5:00 PM X
Run at Rate 4 hours SQ&D Classroom Guanajuato E. Gray 8:00 AM - 12:00 PM X
BIQ - S 8 hours SQE/SQO Classroom Silao C. Bispo/A. Rangel 8:00 AM - 5:00 PM X
DFSS - Part 1 33341 20 hours SQ&D Classroom Ramos C. Uribe / G. Davila 8:00 AM - 5:00 PM / 12:00 PM X
BIQ - S 8 hours SQE/SQO Classroom Ramos M. Nabte 8:00 AM - 5:00 PM X
Dimensional Apprentice 16 hours SQE/SQO Classroom Ramos Daniel Barrera 8:00 AM - 5:00 PM X
*Mandatory
**Available
(Ejemplo)
Gráfico de Flexibilidad – Estado de Equipo e identificación
de necesidades (requerimientos de trabajo)
(Ejemplo)
Capacitación Estándar - Evaluación
Individual
Team Member (T/M): _________________________ Team: Shift:
Operation 1
Operation 2
Operation 3
Operation 4
Operation 5
Operation 6
Requerimientos
Step 4 - Follow-up
R-1. Safety Check
R-2. Standardized Work Check
R-3. Quality Check - Goal of ZERO defects
de trabajo
Check minimum of 15 Jobs - Complete Verification Checksheet with Team Member Initials
R-4. Takt Check
R-5. Standardized Tools Check
R-6. Error-proofing Check
R-7. Materials Check
R-8. Andon Check
R-9. Workstation Documentation Requirements
S. Verification (later in shift or next day)
T. Provide Feedback
U. Certify the T/M to 3/4 on flexibility chart (must complete steps for all models )
Sign Team Member initials required for each job certified
Date ( T/M signoff that these steps were used by trainer to certify )
Sign
Date
FLEX
Sign
Date
Team Leader initials required for each job certified