5-Dialux Report
5-Dialux Report
21/10/2019
Project 0
Project 0 21/10/2019
Project 0 / Content
Content
Project 0
Site 1
Building 1
Storey 1
balcony
Summary................................................................................................................................................................................................. 4
Luminaire layout plan.............................................................................................................................................................................. 5
Workplane (balcony) / Perpendicular illuminance (adaptive).................................................................................................................. 6
bath
Summary................................................................................................................................................................................................. 7
Luminaire layout plan.............................................................................................................................................................................. 8
Workplane (bath) / Perpendicular illuminance (adaptive)........................................................................................................................9
bed room 3
Summary............................................................................................................................................................................................... 12
Luminaire layout plan............................................................................................................................................................................ 13
Workplane (bed room 3) / Perpendicular illuminance (adaptive).......................................................................................................... 14
bed room1
Summary............................................................................................................................................................................................... 18
Luminaire layout plan............................................................................................................................................................................ 19
Workplane (bed room1) / Perpendicular illuminance (adaptive)........................................................................................................... 20
Bed room2
Summary............................................................................................................................................................................................... 24
Luminaire layout plan............................................................................................................................................................................ 25
Workplane (Bed room2) / Perpendicular illuminance (adaptive)........................................................................................................... 26
corridor
Summary............................................................................................................................................................................................... 30
Luminaire layout plan............................................................................................................................................................................ 31
Workplane (corridor) / Perpendicular illuminance (adaptive)................................................................................................................ 32
corridor1
Summary............................................................................................................................................................................................... 34
Luminaire layout plan............................................................................................................................................................................ 35
Workplane (corridor1) / Perpendicular illuminance (adaptive).............................................................................................................. 36
corridor2
Summary............................................................................................................................................................................................... 37
Luminaire layout plan............................................................................................................................................................................ 38
Workplane (corridor2) / Perpendicular illuminance (adaptive).............................................................................................................. 39
dining
Summary............................................................................................................................................................................................... 43
Luminaire layout plan............................................................................................................................................................................ 44
Workplane (dining) / Perpendicular illuminance (adaptive)................................................................................................................... 45
kitchen
Summary............................................................................................................................................................................................... 49
Luminaire layout plan............................................................................................................................................................................ 50
Workplane (kitchen) / Perpendicular illuminance (adaptive)................................................................................................................. 51
master bath
Summary............................................................................................................................................................................................... 55
Luminaire layout plan............................................................................................................................................................................ 56
Workplane (master bath) / Perpendicular illuminance (adaptive)..........................................................................................................57
reception
Summary............................................................................................................................................................................................... 60
Luminaire layout plan............................................................................................................................................................................ 61
Workplane (reception) / Perpendicular illuminance (adaptive)..............................................................................................................62
Room 7
Summary............................................................................................................................................................................................... 66
shower
Summary............................................................................................................................................................................................... 67
Luminaire layout plan............................................................................................................................................................................ 68
Page 2
Project 0 21/10/2019
Project 0 / Content
Page 3
Project 0 21/10/2019
balcony
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (balcony) Perpendicular illuminance (adaptive) [lx] * 99.8 (≥ 100) 63.7 120 0.64 0.53
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 5.17 W/m² = 5.18 W/m²/100 lx (Floor area of room 7.74 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 4
Project 0 21/10/2019
balcony
Page 5
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Isolines [lx]
Scale: 1 : 50
Scale: 1 : 50
Scale: 1 : 50
Page 6
Project 0 21/10/2019
bath
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (bath) Perpendicular illuminance (adaptive) [lx] * 354 (≥ 300) 273 414 0.77 0.66
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 16.91 W/m² = 4.78 W/m²/100 lx (Floor area of room 5.32 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 7
Project 0 21/10/2019
bath
Page 8
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 9
Project 0 21/10/2019
Isolines [lx]
Scale: 1 : 25
Scale: 1 : 25
Page 10
Project 0 21/10/2019
Scale: 1 : 25
Page 11
Project 0 21/10/2019
bed room 3
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (bed room 3) Perpendicular illuminance (adaptive) [lx] * 207 (≥ 200) 136 250 0.66 0.54
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 5.57 W/m² = 2.69 W/m²/100 lx (Floor area of room 18.67 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 12
Project 0 21/10/2019
bed room 3
Page 13
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room 3 / Workplane (bed room 3) / Perpendicular illuminance (adaptive)
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 14
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room 3 / Workplane (bed room 3) / Perpendicular illuminance (adaptive)
Isolines [lx]
Scale: 1 : 25
Page 15
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room 3 / Workplane (bed room 3) / Perpendicular illuminance (adaptive)
Scale: 1 : 25
Page 16
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room 3 / Workplane (bed room 3) / Perpendicular illuminance (adaptive)
Scale: 1 : 25
Page 17
Project 0 21/10/2019
bed room1
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (bed room1) Perpendicular illuminance (adaptive) [lx] * 220 (≥ 200) 144 266 0.65 0.54
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 6.16 W/m² = 2.80 W/m²/100 lx (Floor area of room 16.88 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 18
Project 0 21/10/2019
bed room1
Page 19
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room1 / Workplane (bed room1) / Perpendicular illuminance (adaptive)
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 20
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room1 / Workplane (bed room1) / Perpendicular illuminance (adaptive)
Isolines [lx]
Scale: 1 : 25
Page 21
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room1 / Workplane (bed room1) / Perpendicular illuminance (adaptive)
Scale: 1 : 25
Page 22
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / bed room1 / Workplane (bed room1) / Perpendicular illuminance (adaptive)
Scale: 1 : 25
Page 23
Project 0 21/10/2019
Bed room2
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (Bed room2) Perpendicular illuminance (adaptive) [lx] * 224 (≥ 300) 149 274 0.67 0.54
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 6.35 W/m² = 2.83 W/m²/100 lx (Floor area of room 16.39 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 24
Project 0 21/10/2019
Bed room2
Page 25
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / Bed room2 / Workplane (Bed room2) / Perpendicular illuminance (adaptive)
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 26
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / Bed room2 / Workplane (Bed room2) / Perpendicular illuminance (adaptive)
Isolines [lx]
Scale: 1 : 25
Page 27
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / Bed room2 / Workplane (Bed room2) / Perpendicular illuminance (adaptive)
Scale: 1 : 25
Page 28
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / Bed room2 / Workplane (Bed room2) / Perpendicular illuminance (adaptive)
Scale: 1 : 25
Page 29
Project 0 21/10/2019
corridor
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (corridor) Perpendicular illuminance (adaptive) [lx] * 108 (≥ 100) 83.7 127 0.78 0.66
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 5.27 W/m² = 4.87 W/m²/100 lx (Floor area of room 4.93 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 30
Project 0 21/10/2019
corridor
Page 31
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Isolines [lx]
Scale: 1 : 25
Page 32
Project 0 21/10/2019
Scale: 1 : 25
Scale: 1 : 25
Page 33
Project 0 21/10/2019
corridor1
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (corridor1) Perpendicular illuminance (adaptive) [lx] * 129 (≥ 100) 97.0 150 0.75 0.65
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 5.92 W/m² = 4.58 W/m²/100 lx (Floor area of room 6.76 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 34
Project 0 21/10/2019
corridor1
Page 35
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Isolines [lx]
Scale: 1 : 50
Scale: 1 : 50
Scale: 1 : 50
Page 36
Project 0 21/10/2019
corridor2
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (corridor2) Perpendicular illuminance (adaptive) [lx] * 122 (≥ 100) 52.3 149 0.43 0.35
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 4.24 W/m² = 3.48 W/m²/100 lx (Floor area of room 9.43 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 37
Project 0 21/10/2019
corridor2
Page 38
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 39
Project 0 21/10/2019
Isolines [lx]
Scale: 1 : 25
Page 40
Project 0 21/10/2019
Scale: 1 : 25
Page 41
Project 0 21/10/2019
Scale: 1 : 25
Page 42
Project 0 21/10/2019
dining
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (dining) Perpendicular illuminance (adaptive) [lx] * 258 (≥ 200) 147 321 0.57 0.46
Height: 0.800 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 4.59 W/m² = 1.78 W/m²/100 lx (Floor area of room 26.17 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 43
Project 0 21/10/2019
dining
Page 44
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 45
Project 0 21/10/2019
Isolines [lx]
Scale: 1 : 50
Page 46
Project 0 21/10/2019
Scale: 1 : 50
Page 47
Project 0 21/10/2019
Scale: 1 : 50
Page 48
Project 0 21/10/2019
kitchen
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (kitchen) Perpendicular illuminance (adaptive) [lx] * 543 (≥ 500) 333 646 0.61 0.52
Height: 1.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 13.27 W/m² = 2.44 W/m²/100 lx (Floor area of room 9.95 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 49
Project 0 21/10/2019
kitchen
Page 50
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 51
Project 0 21/10/2019
Isolines [lx]
Scale: 1 : 25
Page 52
Project 0 21/10/2019
Scale: 1 : 25
Page 53
Project 0 21/10/2019
Scale: 1 : 25
Page 54
Project 0 21/10/2019
master bath
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (master bath) Perpendicular illuminance (adaptive) [lx] * 319 (≥ 300) 167 383 0.52 0.44
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 14.85 W/m² = 4.66 W/m²/100 lx (Floor area of room 6.06 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 55
Project 0 21/10/2019
master bath
Page 56
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / master bath / Workplane (master bath) / Perpendicular illuminance (adaptive)
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 57
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / master bath / Workplane (master bath) / Perpendicular illuminance (adaptive)
Isolines [lx]
Scale: 1 : 25
Scale: 1 : 25
Page 58
Project 0 21/10/2019
Site 1 / Building 1 / Storey 1 / master bath / Workplane (master bath) / Perpendicular illuminance (adaptive)
Scale: 1 : 25
Page 59
Project 0 21/10/2019
reception
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (reception) Perpendicular illuminance (adaptive) [lx] * 301 (≥ 200) 178 368 0.59 0.48
Height: 0.800 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 5.53 W/m² = 1.84 W/m²/100 lx (Floor area of room 21.69 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 60
Project 0 21/10/2019
reception
Page 61
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 62
Project 0 21/10/2019
Isolines [lx]
Scale: 1 : 50
Page 63
Project 0 21/10/2019
Scale: 1 : 50
Page 64
Project 0 21/10/2019
Scale: 1 : 50
Page 65
Project 0 21/10/2019
Room 7
Clearance height: 2.800 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (Room 7) Perpendicular illuminance (adaptive) [lx] * 0.003 (≥ 500) 0.000 0.011 / 0.00
Height: 0.800 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 0.00 W/m² = 0.00 W/m²/100 lx (Floor area of room 4.24 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 66
Project 0 21/10/2019
shower
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (shower) Perpendicular illuminance (adaptive) [lx] * 142 (≥ 300) 127 153 0.89 0.83
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 17.13 W/m² = 12.06 W/m²/100 lx (Floor area of room 1.93 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 67
Project 0 21/10/2019
shower
Page 68
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Page 69
Project 0 21/10/2019
Isolines [lx]
Scale: 1 : 10
Page 70
Project 0 21/10/2019
Scale: 1 : 10
Page 71
Project 0 21/10/2019
Scale: 1 : 10
Page 72
Project 0 21/10/2019
toilet
Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.70
Workplane
Surface Result Average (Target) Min Max Min/average Min/max
1 Workplane (toilet) Perpendicular illuminance (adaptive) [lx] * 238 (≥ 300) 191 276 0.80 0.69
Height: 0.000 m, Wall zone: 0.000 m
*This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Lighting power density: 14.83 W/m² = 6.23 W/m²/100 lx (Floor area of room 2.70 m²)
The energy consumption quantities do not take into account light scenes and their dimming levels.
Page 73
Project 0 21/10/2019
toilet
Page 74
Project 0 21/10/2019
This result is no longer current! Possibly an object has been modified or added. The project should be recalculated in its entirety to get current results.
Isolines [lx]
Scale: 1 : 25
Scale: 1 : 25
Page 75
Project 0 21/10/2019
Scale: 1 : 25
Page 76