Professional Documents
Culture Documents
Auto Usage Decision
Auto Usage Decision
Auto Usage Decision
Vivek Malik
August 26, 2016 2 minute read
If the goods in an inspection lot are confirmed to be free of defects in an inspection, the system can complete an
inspection automatically, provided certain prerequisite conditions have been met.
Prerequisite.
The system can only make an automatic usage decision if the following conditions have been met:
Step 1.
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 1/9
4/11/2020 Auto Usage Decision | SAP Blogs
In Plant dependent QM setting maintain wait time in Automatic usage decision tab as per the business
requirement.
Waiting time :- The number of hours / mins entered here must have expired after creation of the Lot,before the system
makes an automatic usage decision for the corresponding inspection lot.
Step 3.
In material master in QM view activate Automatic UD indicator for the inspection type.
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 2/9
4/11/2020 Auto Usage Decision | SAP Blogs
Step 4.
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 3/9
4/11/2020 Auto Usage Decision | SAP Blogs
Step 6:-
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 4/9
4/11/2020 Auto Usage Decision | SAP Blogs
Result recording is mandatory to perform Auto UD if required char indicator is activated for the characteristic.
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 5/9
4/11/2020 Auto Usage Decision | SAP Blogs
Step 7
Follow RSS feed Like
Execute T-code QA10 to perform Auto UD for the Inspection lot. You can also scheduled job.
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 6/9
4/11/2020 Auto Usage Decision | SAP Blogs
Alert Moderator
Follow RSS feed Like
Assigned tags
PLM Quality Management (QM) | MAN Production Planning (PP) | plm | sap erp manufacturing production
planning | sap erp operations quality management |
Related Questions
3 Comments
Former Member
Hi,
I have follow the same step however UD code is not getting update into inspection lot, only status of lot is
changed. Please suggest if we need to do something for this as well.
Like (0)
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 7/9
4/11/2020 Auto Usage Decision | SAP Blogs
KAVIYARASAN THANGAPPAN
Follow RSS feed Like
August 22, 2018 at 4:40 am
Hi,
Kindly check and change the ‘posting proposal UD’ status for the concern ‘selected set code’, which is available
under the node ‘Maintain catalogs for usage decisions’.
T Code: QS51.
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 8/9
4/11/2020 Auto Usage Decision | SAP Blogs
Best Regards,
Follow RSS feed Like
Kavi T
Like (0)
Nitin Jinagal
Why didn’t you get inspection lot number with series 9 ? And I couldn’t nd the steps 2 and step 5. Did you miss
it
Also it will be nice to have details & screenshotsabout scheduling a background job since that actually serves
the purpose of automatic usage decision without doing anything after the results are recorded.
Like (0)
Find us on
Newsletter Support
https://blogs.sap.com/2016/08/26/auto-usage-decision/ 9/9