Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 18

qwertyuiopasdfghjklzxcvbnmqwerty

uiopasdfghjklzxcvbnmqwertyuiopasd
fghjklzxcvbnmqwertyuiopasdfghjklzx
NUBARIA DISTRIBUTED CONTROL
SYSTEM
cvbnmqwertyuiopasdfghjklzxcvbnmq
HMI LAYOUT

wertyuiopasdfghjklzxcvbnmqwertyui
[Pick the date]

J ARNAUD
opasdfghjklzxcvbnmqwertyuiopasdfg
hjklzxcvbnmqwertyuiopasdfghjklzxc
vbnmqwertyuiopasdfghjklzxcvbnmq
wertyuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiopasdfg
hjklzxcvbnmqwertyuiopasdfghjklzxc
vbnmqwertyuiopasdfghjklzxcvbnmq
wertyuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiopasdfg
hjklzxcvbnmrtyuiopasdfghjklzxcvbn
mqwertyuiopasdfghjklzxcvbnmqwert
yuiopasdfghjklzxcvbnmqwertyuiopas
dfghjklzxcvbnmqwertyuiopasdfghjklz
xcvbnmqwertyuiopasdfghjklzxcvbnm
qwertyuiopasdfghjklzxcvbnmqwerty
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

Document No. 7000-


002-ECN-201
Page 2 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

Revision Record

REV Prepared CHECKED APPROVED DATE Description STAT.

00 Ahmad Ali Said 21.5.2008 FIRST ISSUE I

Document No. 7000-


002-ECN-201
Page 3 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

Revision Record

REV Prepared CHECKED APPROVED DATE Description STAT.

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
3AABPIT015 HRSG 3A CRHT PRESSURE barg 24 VDC
0 4
0 26.8     20 mA

3AABPIT071 HRSG 3A COLD REHEAT   barg 24 VDC


PRESSURE 0 4
0   26.8     20 mA

3BABPIT015 HRSG 3A CRHT PRESSURE   barg 24 VDC


0 4
0   26.8     20 mA

3BABPIT071 HRSG 3B COLD RHEAT   barg 24 VDC


PRESSURE 0 4
0   26.8     20 mA

3XADPIT007 CONDENSTE PUMPS DISC   barg 24 VDC


PRESSURE 0 4
0   26.8     20 mA
HP BFP 1A DISCH
 
3XAEPIT006A PRESSURE barg 24 VDC
0 4
0   221     20 mA
HP BFP 1B DISCH
 
3XAEPIT006B PRESSURE barg 24 VDC
0 4
0   221     20 mA
HP BFP 1C DISCH
 
3XAEPIT006C PRESSURE barg 24 VDC
0 4
0   221     20 mA

3XAEPIT010A HP BFP DISCH HEADER   barg 24 VDC


PRESSURE 0 4
0   221     20 mA
HP BFP DISCH HEADER
 
3XAEPIT010B PRESS barg 24 VDC
0 4
0   221     20 mA

3XAEPIT012A HP BFP IA EXT TO IP ECO   barg 24 VDC


Document No. 7000-
002-ECN-201
Page 4 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

PRESS 0 4
0   89     20 mA

3XAEPIT012B HP BFP IB EXT TO IP ECO   barg 24 VDC


PRESS 0 4
0   89     20 mA

3XAEPIT012C HP BFP IC EXT TO IP ECO   barg 24 VDC


PRESS 0 4
0   89     20 mA

3XAEPIT018A LP BFP 2A SUCTION   barg 24 VDC


PRESSURE 0 4
0   85     20 mA

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
3XAEPIT018B LP BFP 2B SUCTION   barg 24 VDC
PRESSURE 0 4
0   85     20 mA

3XAEPIT018C LP BFP 2C SUCTION   barg 24 VDC


PRESSURE 0 4
0   85     20 mA
LP BFP 2A DISCH
 
3XAEPIT 022A PRESSURE barg 24 VDC
0 4
0   40     20 mA
LP BFP 2B DISCH
 
3XAEPIT022B PRESSURE barg 24 VDC
0 4
0   40     20 mA
LP BFP 2C DISCH
   
3XAEPIT022C PRESSURE barg 24 VDC
0 4
0   40     20 mA
LP BFP DICH HEADER
   
3XAEPIT027A PRESS barg 24 VDC
0 4
0   40     20 mA
LP BFP DICH HEADER
  4
3XAEPIT027B PRESS barg 24 VDC
0
0   40     20 mA
IP BFP EXT TO IP ECON
   
3XAEPIT031 HDR barg 24 VDC
PRESS 0 4
0   89     20 mA

3XFGPIT003 FUEL GAS HEADER PRESS   barg 24 VDC  


0 4
Document No. 7000-
002-ECN-201
Page 5 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

0   30     20 mA

3XPIPIT002 INST AIR DISTRIB HEADER   barg 24 VDC  

PRESSURE 0 4
0   9.3     20 mA

3XPIPIT004 SERV AIR DISTRIB HEADER   barg 24 VDC  

PRESSURE 0 4
0   8.6     20 mA
INST/SERV AIR DIST
   
3XPIPIT011 HEADER barg 24 VDC
PRESS 0 4
0   9.3     20 mA
DEMI WTR PMPS DISH
   
3XSCP1T010 PRESS barg 24 VDC
0 4
0   7.1     20 mA

3XWBP1T007 CCW PUMPS DISH HDR   barg 24 VDC  

PRESSURE 0 4
0   8     20 mA

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
CRC WATER PMP 1A
   
3XWLP1T001A DSCHRG barg 24 VDC
PRESSURE 0 4
0   5.5     20 mA
CRC WATER PMP 1B
   
3XWLP1T001B DSCHRG barg 24 VDC
PRESSURE 0 4
0   5.5     20 mA
CRC WATER PMP 1C
   
3XWLP1T001C DSCHRG barg 24 VDC
PRESSURE 0 4
0   5.5     20 mA
SRVC WTR PMPS DISCH
   
3XWSP1T017 HDR barg 24 VDC
PRESS 0 4
0   6     20 mA

3XAEFIT003A HP BFP 1A SUCTION FLOW   mbar 24 VDC  


0 4
0   350     20 mA

3XAEFIT003B HP BFP 1B SUCTION FLOW   mbar 24 VDC  


0 4
0   350     20 mA

3XAEFIT003C HP BFP 1C SUCTION FLOW   mbar 24 VDC  


0 4
0   350     20 mA
3XAEFIT008A HP BFP 1A MIN RECIRC   mbar 24 VDC  
Document No. 7000-
002-ECN-201
Page 6 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

FLOW
0 4
0   450     20 mA
HP BFP 1B MIN RECIRC
   
3XAEFIT008B FLOW mbar 24 VDC
0 4
0   450     20 mA
HP BFP 1C MIN RECIRC
   
3XAEFIT008C FLOW mbar 24 VDC
0 4
0   450     20 mA

3XAEFIT019A LP BFP 2A SUCT FLOW   mbar 24 VDC  


0 4
0   350     20 mA

3XAEFIT019B LP BFP 2B SUCT FLOW   mbar 24 VDC  


0 4
0   350     20 mA

3XAEFIT019C LP BFP 2C SUCT FLOW   mbar 24 VDC  


0 4
0   350     20 mA
LP BFP 2A MIN RECIRC
   
3XAEFIT024A FLOW mbar 24 VDC
0 4
0   300     20 mA

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
LP BFP 2B MIN RECIRC
   
3XAEFIT024B FLOW mbar 24 VDC
0 4
0   300     20 mA
LP BFP 2C MIN RECIRC
0  
3XAEFIT024C FLOW mbar 24 VDC
4
0   300     20 mA

3XAEFIT009A HP BFP 1A EXT TO IP ECO   mbar 24 VDC  

FLOW 0 4
0   800     20 mA

3XAEFIT009B HP BFP 1B EXT TO IP ECO   mbar 24 VDC  

FLOW 0 4
0   800     20 mA

3XAEFIT009C HP BFP 1C EXT TO IP ECO   mbar 24 VDC  

FLOW 0 4
0   800     20 mA

3XADFIT012 CONDENSTE PUMPS DISCH   mbar 24 VDC  

FLOW 0 4

Document No. 7000-


002-ECN-201
Page 7 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

0   800     20 mA

3XSCLIT003A DEMI WTR STORGE TANKE   mm 24 VDC  

LEVEL 0 4
0   8500     20 mA

3XSCLIT003B DEMI WTR STORGE TANKE   mm  24 VDC  

LEVEL 0 4
0   8500     20 mA

3XWBL1T002 CCW HEAD TANK LEVEL   mm 230 VAC  


0 4
0   1300     20 mA
HRSG 3A CRHT
   
3AABTT015 TEMPERATURE °C  
0 4
0   335     20 mA

3AABTT067 HRSG 3A HP SHTR STEAM   °C    

TEMP. 0 4
0   574     20 mA

3AABTT068 HRSG 3A HOT REHEAT STM   °C    

TEMP. 0 4
0   574     20 mA
HRSG 3A COLD REHEAT
   
3AABTT072 TEMP °C  
0 4
0   335     20 mA
HRSG 3A IP BYPS VLV STM
   
3AABTF076 INLT TEMP °C  
0 4
0   574     20 mA

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
HRSG 3B CRHT
0  
3BABTT015 TEMPERATURE °C  
4
0   335     20 mA

3BABTT067 HRSG 3B HP SHTR STEAM   °C    

TEMP. 0 4
0   574     20 mA
HRSG 3B HOT RHEAT
   
3BABTT068 STEAM °C  
TEMP. 0 4
0   574     20 mA

3BABTT072 HRSG 3B COLD RHEAT 0 °C    

TEMP. 0 4
0   335     20 mA

Document No. 7000-


002-ECN-201
Page 8 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

HRSG 3B IP BYPS VLV STM


   
3BABTT076 INLT °C  
TEMP. 0 4
0   574     20 mA

3XADTT011 COND PUMPS DISC TEMP   °C    

AFTER GSC 0 4
0   55     20 mA

3XAETT003A HP/IP BFP A SUCT TEMP.   °C    


0 4
0   180     20 mA

3XAETT003B HP/IP BFP B SUCTION TEMP   °C    


0 4
0   180     20 mA
HP/IP BFP 1C SUCTION
   
3XAETT003C TEMP °C  
0 4
0   180     20 mA

3XAETT019A LP BFP A SUCT TEMP   °C    


0 4
0   180     20 mA

3XAETT019B LP BFP B SUCT TEMP   °C    


0 4
0   180     20 mA

3XAETT019C LP BFP C SUCT TEMP   °C    


0 4
0   180     20 mA

3XFGTT002 FUEL GAS HEADER TEMP   °C    


0 4
0   15     20 mA

3XWBTT004 CCW PUMPS DISH HDR   °C    

TEMP. 0 4
0   15     20 mA

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
3XWBTT012 PLATE HEAT EXCHS OUT   °C    

TEMP. 0 4
0   50     20 mA
SRVC WTR TO CIRC TO
   
3XWSTT015 SRGE °C  
TNK TEMP 0 4
0   40     20 mA
HRSG 3A MAIN STEAM
   
3AABTT075 BYPASS °C  

Document No. 7000-


002-ECN-201
Page 9 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

TEMPERATURE 0 4
0   572     20 mA
HRSG 3B MAIN STEAM
   
3BABTT075 BYPASS °C  
TEMP. 0 4
0   572     20 mA
HRSG 3A CRHT DRP LEG
 
3AABLSH054 LVL DPDT 230 VAC
HI
0          

3AABLSHH054 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC


HI HI
0          
HRSG 3A CRHT DRP LEG
 
3AABLSH055 LVL DPDT 230 VAC
HI
0          

3AABLSHH055 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC


HI HI
0          
HRSG 3B CRHT DRP LEG
 
3BABLSH054 LVL DPDT 230 VAC
HI
0          

3BABLSHH054 HRSG 3B CRHT DRP LG LVL   DPDT 230 VAC


HI HI
0          
HRSG 3A CRHT DRP LEG
 
3AABLSH055 LVL DPDT 230 VAC
HI
0          

3AABLSHH055 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC


HI
0          
HRSG 3A CRHT DRP LEG
 
3AABLSH056 LVL DPDT 230 VAC
HI HI
0          

3AABLSHH056 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC  

HI HI
0          

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
HRSG 3B CRHT DRP LEG
   
3BABLSH055 LVL DPDT 230 VAC
HI

Document No. 7000-


002-ECN-201
Page 10 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

0          

3BABLSHH055 HRSG 3B CRHT DRP LG LVL   DPDT 230 VAC  

HI HI
0          
HRSG 3A CRHT DRP LEG
   
3AABLSH056 LVL DPDT 230 VAC
HI
0          
3AABLSHH056 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC  

HI HI
0          
HRSG 3A CRHT DRP LEG
3AABLSH057    
LVL DPDT 230 VAC
HI
0          
3AABLSHH057 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC  

HI HI
0          
HRSG 3B CRHT DRP LEG
3BABLSH056    
LVL DPDT 230 VAC
HI
0          
3BABLSHH056 HRSG 3B CRHT DRP LG LVL   DPDT 230 VAC  

HI HI
0          
HRSG 3A CRHT DRP LEG
3AABLSH057    
LVL DPDT 230 VAC
HI
0          
3AABLSHH057 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC  

HI HI
0          
HRSG 3A CRHT DRP LEG
3AABLSH058    
LVL DPDT 230 VAC
HI
0          
3AABLSHH058 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC  

HI HI 0
0   1      
HRSG 3B CRHT DRP LEG
3BABLSH057    
LVL DPDT 230 VAC
HI 0
0   1      
3BABLSHH057 HRSG 3B CRHT DRP LG LVL   DPDT 230 VAC  

HI HI 0
0   1      

Document No. 7000-


002-ECN-201
Page 11 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

Tag name Description Process Range Process Units Voltage Level Signal Range
Min Zero
Rev   Max     Span
HRSG 3A CRHT DRP LEG
3AABLSH058    
LVL DPDT 230 VAC
HI 0
0   8      
3AABLSHH058 HRSG 3A CRHT DRP LG LVL   DPDT 230 VAC  

HI HI 0
0   8      

CONDUCTOR CALCULATION NOTES

1. INTRODUCTIONPURPOSE AND SCOPE


This note describes the sizing of the battery and the DC battery charger
associated.document gives the calculation criteria used to select 220kV over head
conductor connected between main Busbar and 220KVA power transformer (TR02) for
Suez Steel 220kv substation

2. applicable codes and standard


The calculation criteria is in compliance with the following standard:

23. REFERENCE DOCUMENTS


The following documents shall taken into consideration:

3.3 3.1 [DR1] :


3.4 Technical Specification for Dc and Uninterruptible Power Supply
Systemdata sheet received from supplier (attachment 6.1)No. 10094-9-3PS-
ED00-00001

3.2 [DR2] :[DR1] : Technical specification 10049-9-3PS-ED00-00001.Standard


IEEE std 80-2000485.
3.5 Single line diagram DWG No.(7000-002-ESLD-801).
3.6 220kv substation yard equipment layout DWG No. (7000-002-EEL-001).
3.7 Meteorological data.

4. SITE CODITIONS
Document No. 7000-
002-ECN-201
Page 12 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

The calculation report is based on the following site condition.

LOCATION Suez steel company

Maximum ambient temperature 42 ˚C

Minimum ambient temperature 7˚C

Relative Humidity 94%

Altitude a.s.l. 1000m

5. 220KV GRID CHARACTERISTICS

Rated voltage 220 kv

Maximum grid voltage value (110% of 242 KV


220kv)

Minimum grid voltage value (90% of 198 KV


220kv)

Rated frequency 50 HZ

Maximum 3 phase short circuit 40 KA

Maximum single phase short circuit 40KA

Minimum 3 phase short circuit 12647 A

Minimum single phase short circuit 9290 A

Document No. 7000-


002-ECN-201
Page 13 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

6. conductor arrangement and cnfigration.

800cm

400cm 400cm

22cm 22cm 22cm

220KV overhead conductor configeration


Figure (1)

- Conductor overall diameter 27mm


- Conductor nominal cross section area 431.5 mm2 (380/50)

7. Conductor current carrying capacity

The current carrying capacity is the maximum continuous current; the conductor can
carry at its maximum operating temperature.

Ib <Iz
Where :

Iz : the continuous current carrying capacity of the conductor.


Ib : the maximum load current ( which the circuit is dimensioned )

As the ACSR conductor will feed the 220 MVA transformer, (220/33)KV. So, the
maximum rating current is 577A at 220KV side.

Document No. 7000-


002-ECN-201
Page 14 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

Based on ACSR conductor data sheet (attachment No.01) the (380/50) ACSR maximum
continuous current is 840 A.

So, the selection of two stranded bundle from 431.5 mm2


(380/50)ASCR are accepted.

(IEEE Recommended Practice for Sizing Batteries for stationary


Applications).

38. BATTERY CAPACITY SIZINGCorona discharge calculation

High voltage gradients surrounding conductors will lead to a breakdown of the air in
the vicinity of the conductor surface known as corona discharge. The effect is more
pronounced at high altitudes. Generally, the breakdown strength of air is
approximately 30KVpeak /cm or 21.1KVrms/cm. This is a useful guide for the selection
of Conductor diameter.

8.1 Calculation formulas

The critical corona voltage can be expressed as follows:

Vc = 21.1 * m * n * ξ * r * Ln ( Dm / Ds ) Kv(rms)

Where:

Vc: the critical corona voltage

m: the surface factor

- polished and smooth surface m=1

- Stranded conductor m=0.8.

n: number of conductor/phase

ξ: the relative density coefficient

- ξ = 31.5 * b /(273+t)

Where:
Document No. 7000-
002-ECN-201
Page 15 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

b: pressure (torr)

t: temperature (˚C)

r: equivalent radius of smooth conductor (cm)

Dm: the geometric main distance cm

Ds: the geometric main radius cm

8.2 Calculation output

Using the conductor sizing an arrangement as mentioned in item 6.


An

And figure (1) the critical corona voltage will be

Vc =189.7 KV (rms)

Where :

- Vc > V phase

So, the selection of two stranded bundle from 431.5 mm2


(380/50)ASCR are accepted.

3.1 Reminder of the requests for sizing

Chapter 5.2.1 of [DR1]:

Document No. 7000-


002-ECN-201
Page 16 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

Provide battery sized in accordance with IEEE 485 using temperature correction factor,
aging factor, and design margin factor to yield a 20-year design life. The battery shall be
sized for the load profile shown in Appendix G.. No additional design margin is required
by Owner for future load growth. The manufacturer shall consider use of design margin if
required to offset uncertainty in sizing the battery to the load profile.

3.2 Capacity calculation

The battery is automatically sized with the battery manufacturer software in


accordance with IEEE 485 like requested. This software allows to know for a discharge
duration value or autonomy given, for end of voltage battery cell and a load profile
provided, the choice of a battery type.

Input DATA:

Number of cells : 60 (max. voltage : 140V, min. voltage: 108V in accordance


with [DR1])

Battery type : OPzS (vented lead acid battery type)

Battery end of voltage per cell: 1,80V

Temperature rate sizing : 25°C

Load profile given in appendix G of [DR1]:

140.065 kW during 1 minute

131.868 kW during 118 minutes

139.483 kW during 1minute.

Aging factor :factor: 1.25

Design factor: 1.1 Temp. factor: 0.97

(Total correction factor: 1.3337)

The battery manufacturer software gives as result as 6000Ah (2 times 60 cells type
24 OPzs 3000).

(see software report on following page).


Document No. 7000-
002-ECN-201
Page 17 of 18
Owner: MDEPCSSC NUBARIA POWER STATION
Contractor Engineer: MADKOUR for PSP IIIREHABILITATION OF Date:
11/09/2008 750
Owner Consultant:MW COMBIND CYCLE
PGESCo
Date: 21082403/05068/2008 PROJECTSUEZ STEEL 220KV

Rev. 0
C ontractor: ET-EGYTECH
Rev. 01
Contractor Engineer: MADKOUR for PSP SH 1004/10
06 8

The battery cell characteristic is given in annex.

Document No. 7000-


002-ECN-201
Page 18 of 18