L OF ZANGALAPALLE(ZPL) STATION
BUILDING @KM:199/160
SRJ@Ch:442.83m (Km:199/602.83)
DS Ch:259.00m (Km:198/891)
SRJ@Ch:562.00m (Km:199/722)
Br. No:88, 198/925.00
LC 122 @ ch:598m (Km:198/562)
SRJ@Ch:575.00m (Km:199/735)
1x1.22m RCC slab
SRJ @ Ch:464.00m (Km:198/696)
BS Km:199/457.00
SRJ@Ch:695.00m (Km:199/855)
BS@Ch:340.00m
Ext. Top Point 11B Km:198/742
(Km:199/500)
BS Km:199/722
Br. No:89, 199/342.00
SRJ Km:198/834
BS Km:199/855
12.23m
Pro. Up loop CSR 699.830 m
BS
14B 21A/ 17A Pro. Up ML CSR 733m
21B 27A
16 11A 10A 25B 7.10m
6.00m 11B 15B 7B 6.00m
Pro. Dn ML CSR 722m 10B 26B/6B
14A 5.30m 15A 7A Pro. Common Loop CSR 722m 5.30m 27B
19 20 /20
GY
SRJ Km:198/796
26A/6A
SRJ @ Ch:398.00m (Km:198/762)
SRJ @ Ch:411.00m ( Km:198/749)
SRJ Km:198/892
SRJ Km:198/993
SRJ @Ch:300.04m (Km:198/859)
BS Km:199/747.00
SRJ Km:199/577
SAND HUMP Km:198/497
Existing TS to be Dismantled
SRJ@Ch:467.00m (Km:199/627)
BS Km:199/912
D-5
Dismantling of Trap switch no 21A at ballast
D day D-4
sidling and insertion of new trap switch 17A at
Dismantling of existing Point No. 10B at GY end Removal of Existing Trap switch point 6A and insertion
ch:259.000m manually
Dismantling of existing Point No. 7A at of point no.26A
Dismantling of trap switch no. 20 at FCI siding
Ch: 268.00. at DMM end. Dismantling of plain track at GY end and insertion of
and insertion of new trap switch point no.
Insertion of New Assembled point nos 15A at New Assembled point 27B with T-28. New point
20manually
Ch: 300.00 with T-28 assembled and kept ready at a distance of 20.00 m
Newly assembled points 15A kept ready at a away from the location.
distance of 30.00m away from the location
Road 1 & Road 3 Under suspension
(Non Crossing)