D+1

Dismantling of existing point No. 11B partly.


Dismantling of existing point No. 7B at Ch:364.00 D-3
Insertion of pre-assembled new point No. 15B at D-2 Dismantling of existing sand hump at GY end.
D-1 Ch:398.00 with T-28. Dismantling of existing points Dismantling of existing point no.10A at Ch:417.00 at GY
Cut and connection of existing main line and slewing to Newly assembled points 15B kept ready at a distance nos. 21B & 11A at DMM end end.
new alignment from Ch:418.00 to Ch:829.40. Dismantling of 30.00m away from the location Insertion of pre-assembled new Point no.25B at Ch:562.00
of existing Point no. 11B partly on main line at Ch:418.00 with T-28. New point assembled and kept ready at a
Road 1 & Road 3 Under suspension Road 3 Under suspension
and Insertion of pre-assembled new Point no.14A at distance of 15.00m away from the location.
Ch:411.00 with T-28. (Non Crossing)
Newly assembled point 14A kept ready at a distance of
Road 3 Under suspension
25.00m away from the location

Road 3 Under suspension

C
L OF ZANGALAPALLE(ZPL) STATION
BUILDING @KM:199/160

SRJ@Ch:442.83m (Km:199/602.83)
DS Ch:259.00m (Km:198/891)

1x1.5x1.89m RCC Box


SRJ @Ch:379.00m (Km:198/781)

SRJ@Ch:562.00m (Km:199/722)
Br. No:88, 198/925.00
LC 122 @ ch:598m (Km:198/562)

SRJ @ ch:517.00 m (Km:198/643)

SRJ@Ch:575.00m (Km:199/735)
1x1.22m RCC slab
SRJ @ Ch:464.00m (Km:198/696)

BS Km:199/457.00

SRJ@Ch:695.00m (Km:199/855)
BS@Ch:340.00m
Ext. Top Point 11B Km:198/742

(Km:199/500)

BS Km:199/722
Br. No:89, 199/342.00

SRJ Km:198/834

BS Km:199/855
12.23m
Pro. Up loop CSR 699.830 m

DMM 17 7.10m 25A 7.10m

BS
14B 21A/ 17A Pro. Up ML CSR 733m
21B 27A
16 11A 10A 25B 7.10m
6.00m 11B 15B 7B 6.00m
Pro. Dn ML CSR 722m 10B 26B/6B
14A 5.30m 15A 7A Pro. Common Loop CSR 722m 5.30m 27B
19 20 /20
GY
SRJ Km:198/796

26A/6A
SRJ @ Ch:398.00m (Km:198/762)
SRJ @ Ch:411.00m ( Km:198/749)

SRJ Km:198/892

SRJ Km:198/993
SRJ @Ch:300.04m (Km:198/859)

BS Km:199/747.00
SRJ Km:199/577
SAND HUMP Km:198/497

SRJ @ Ch:506.50m Km:199/721.50


FCI

Existing TS to be Dismantled
SRJ@Ch:467.00m (Km:199/627)

Ext. Top Point


18A

BS Km:199/912
D-5
Dismantling of Trap switch no 21A at ballast
D day D-4
sidling and insertion of new trap switch 17A at
Dismantling of existing Point No. 10B at GY end Removal of Existing Trap switch point 6A and insertion
ch:259.000m manually
Dismantling of existing Point No. 7A at of point no.26A
Dismantling of trap switch no. 20 at FCI siding
Ch: 268.00. at DMM end. Dismantling of plain track at GY end and insertion of
and insertion of new trap switch point no.
Insertion of New Assembled point nos 15A at New Assembled point 27B with T-28. New point
20manually
Ch: 300.00 with T-28 assembled and kept ready at a distance of 20.00 m
Newly assembled points 15A kept ready at a away from the location.
distance of 30.00m away from the location
Road 1 & Road 3 Under suspension
(Non Crossing)

(B.JAYA KUMAR) (ASHOK KUMAR SHARMA) (CHANDAN PRASAD)


Sr.DGM/C/RITES/ATP DGM/S&T/RITES/ATP Manager/Electrical/RITES/ATP
S.C.Railway
Guntakal Division
PreNI Points (17A, 27B,25B,14A,26A & 20) : 6 No's GY -DMM Doubling
NI Points (15A,15B) : 2 No's YARD PLAN OF ZANGALAPALLE
Km:199.160
Total No.of Points : 8 No's (V. HARI BABU) PHASE-1
PRE NI AND NI PROGRAM
GM/C/RITES/BLR