D-4

D-5 Removing of existing point no.13A and overshoot


Plain Track Dismantling & insertion of New line.
Assembled point 16B with T-28. Insertion of Pre-assembled New Point No.25A
With T-28.
Dismantling of 8A and Over shoot line. New
Insertion of Pre-assembled New Point No.24B
point 16B assembled and kept ready at a
With T-28.
distance of 12.00 m away from the location.
Before Pre NI New points 25A & 24B assembled and kept ready D-2
Road 1 Under suspension Insertion of Point No.17B duly at distance of 12.00 & 10.00 m away from the Plain Track Dismantling & insertion of
D-3
shifting of Buffer end about 15.00 m location New Assembled point 27B with T-28.
Plain Track Dismantling & insertion of New
towards GY end New point assembled and kept ready
Assembled point 15B with T-28. New point D-Day Road 1 Under suspension
assembled and kept ready at a distance of at a distance of 30.00 m away from
Removal of Existing Point no 8B at
8.00 m away from the location the location.
DMM end by T28
Road 1 Under suspension
Road 1 Under suspension

SRJ @ Ch:686.00m (Km:189/174.00)

BS Km:189/383.00 (To be dismantled)


SRJ@ Ch:580.00m (Km:189/280.00)

SRJ @ Ch: 467.00m (Km:190/327.00)


TS @ Ch:532.00m (Km:189/328.00)

SRJ @ Ch:454.00m (Km:190/314.00)


CL OF CHIGICHERLA Stn Building

0)
SRJ @Ch:412.00m (Km:189/448.00)
SRJ @ Ch:510.00m (Km:189/350)

SRJ @ Ch:952.00m (Km:190/812.0


KM. 189.86 @ CH 0.00m

SRJ @ Ch: 848.00m (Km:190/706.00)


D-1

SRJ @ Ch:356.00m (Km:190/216.00)

SRJ @ Ch:833.00m (Km:190/693.00)


Plain Track Dismantling & insertion of
BS Km:189/028.00

BS Km:189/160.00m

New Assembled point 28A with T-28.

36.00
New point assembled and kept ready

SRJ Km:189/476.00
(To be dismantled)

BS Km:190/3
at a distance of 25.00 m away from

Ch:384.00 m
T/M Sliding
CSR 300 m the location.
Over shoot line
120.00 m 0m
t line 120.0 Road 1 Under suspension
16A 17A Over shoo 28B
15B Station 24A 25A
17B Building
24B 13A 25B/(13B)
SRJ@ Ch:739.00m (Km:189/121.00)

DMM 16B 8A 27B


28A
8B
26B/(14B)
GY
15A 18B/(7B)
SRJ @ Ch:587.00m (Km:189/273)

27A 0m
26A/(14A) t line 120.0
18A/(7A) Over shoo
SRJ Km:189/378.00

)
Exg. Top Point

.00
(To be dismantled)

m:190/400
Ch:481.60 m

:540.00m (K
SRJ @ Ch
D+1
S&T and OHE
WORK

S.C.Railway
Guntakal Division
Pre NI Points (15B,16B,24B,25A,27B,28A) :6 No's
GY -DMM Doubling
NI Points Dismantling of Point no-8B :1 No.
YARD PLAN OF CHIGICHERLA
Total No.of Points : 7 No's Km:189.860
PHASE-1
PRE NI AND NI PROGRAM
Not to scale