This document summarizes changes between an old and new Detailed Project Report for the Maynaguri Burnish Road project from km 0.00 to km 2.60. Key changes include deleting an item, rectifying item order numbers, adding a new item, specifying design and estimate sources, combining two concrete drain structure items into one, and rectifying numbering of rate analysis and estimate sections. The document outlines 7 observations where the new DPR has been updated from the old version.
This document summarizes changes between an old and new Detailed Project Report for the Maynaguri Burnish Road project from km 0.00 to km 2.60. Key changes include deleting an item, rectifying item order numbers, adding a new item, specifying design and estimate sources, combining two concrete drain structure items into one, and rectifying numbering of rate analysis and estimate sections. The document outlines 7 observations where the new DPR has been updated from the old version.
This document summarizes changes between an old and new Detailed Project Report for the Maynaguri Burnish Road project from km 0.00 to km 2.60. Key changes include deleting an item, rectifying item order numbers, adding a new item, specifying design and estimate sources, combining two concrete drain structure items into one, and rectifying numbering of rate analysis and estimate sections. The document outlines 7 observations where the new DPR has been updated from the old version.
Name of Work: Maynaguri Burnish Road from 0.00 kmp to 2.
60 km
Observation Sl. OLD DPR NEW DPR Remarks
No. 1) Sl. No. (1): “Dismantling Item has been Deleted of Flexible pavement…..” 1) Sl. No. (3) “Picking up old Sl. No. (1) Rectified bituminous …….” 2) Sl. No. (4): “Box cutting or Sl. No. (3): “Box cutting or Here upto 300mm filling….” filling….” has been considered becoz Cutting reqd for CC Block Shoulder 275mm thk & for Hard Shoulder 225 mm thk. 3) (i) N.A. Sl. No.15 New item added 3) (ii) Sl. No. 15 Sl. No. 14 Rectified 4) i) Overhead Gantry Design is done as per Signboard- Design drawing 4) ii) Overhead Gantry PWD SOR (Vol-III) Rectified Signboard: PWD NH Schedule 4) iii) Overhead Gantry Estimate has been made Rectified Signboard- Estimate considering the items as per PWD SOR (Vol-III) 5) CD Structures: Item Single item has been Rectified repetition made for 2 Type of CD
grade- M20 [PWD SOR 1:2:4 [PWD SOR -Vol(I)] -Vol(III)] 7) & (8) Sl. No. of Rate Analysis & Sl. No. for Rate Analysis = Rectified Sl. No. of Abstract Sl. No. for Abstract Estimate / Qty Estimate Estimate = Sl. No. Qty. Estimate