JOB SAFETY ANALYSIS Tank 1001 & 1002 Rev: 0 ; Dated: 21/04/2003

PUNJ LLOYD LTD

ASSESSMENT BY:- TAPAN GHANTI DATE: 21-04-2003 ACTIVITY :- ROOF AIR LIFT

LOCATION:- HAZIRA PORT & LNG TERMINAL PROJECT


HAZARDS:- Others Site Work … .. Site Conditions …. . …. Fuel / Lubricants.. . ….. Hazardous Chemicals .………..Mobile Plant/Vehicles….…. Deep Excavations…
Demolition … .…. Noise/Vibration….. … Explosion … .….. Work Near Water . … Falls From Height…. … Trips/Falls … . … fall of Materials … Fumes/Gas .. …
Lifting Operations …... Flying Particles …. … Collapse of Structure .  …Contaminated Ground… ..… Soft Ground ….. … Poor Light/Visibility…... …Overhead
services… . Buried services . … Manuals handling…... Vehicle overturning… ...… Adverse weather.. ... Dust… . … Heat… .…. Eye hazard … .... Ear Hazard… .
Respiratory hazard……. Head hazards... . ...Hand hazard…..… Skin hazards ……Foot hazard ….… Radiation hazard . … Electrical Hazard. …Other Hazard: -
ACTIVITY HAZARD RISK (Consequence) Controls to Be Introduced to Reduce the Risk/s Control Measures
& Level (H-M-L) Done By (name)

Working inside the tank CONFINED SPACE M A ) All personnel associated with air lift shall be trained
After installation of roof to work in confined space .
Seal & closure plate B) Confined space permit shall be enforced.
C) Minimum two persons shall be allowed to enter
the tank at any time .
D) Door shall be locked with pad locks after joint
inspection by ground control engineer and HSE
Engineer.
E ) Adequate illumination shall be provided inside
the tank .
F)Trained rescue team shall be kept at site for
Attending any emergency .

Working on tank roof Fall from height M A) Temporary walk way with a hand rail around the
Hand hazard
before air lift Foot hazard Roof shall be provided.
1
Head hazard B) All work man and staff shall wear full body
Safety harness while working on the roof .
C) Chin strap on the hard hat must be worn on the
Roof .
M
A) Entry on the roof shall be subject to special
Working on tank roof Identification badges.
before air lift B) All workmen shall be briefed regarding use of
Man- basket and emergency rescue operation .
` C) Trained rescue team will be available at site .

All blowers and other electrical installation shall


Installation of M
Be connected through ELCB and properly earthed.
electrical equipment
M Wireless set shall have different frequency for air
Communication . lift operation and also other frequency set will be
switched off .

M A) Two man basket s shall be kept on the walk way


Emergency For Emergency evacuation from tank doom roof .
B) All air lift crew shall be made aware of man -
Basket operation .
C) Ambulance shall be kept stand by with the
Paramedic .