BPC/Xenocon Lusaka Road -QUOTATION

Date 9th Feb  2018
Client Kamatu

Subject GEOTECHNICAL INVESTIGATION‐QUOTATION 

Site PROPOSED DEVELOPMENT  AT UCHUMI ALONG THIKA ROAD

Activity Test point Depth (m) Total Metres


Mobilization,subsistance,set ,Soft ground Auger boring & Rock coring on 2 points down to a depth of 
10m   including Taking soil and rock samples,performing SPT,Geological logging,water table  BHs 2 10 20
Scope monitoring,  Laboratory testing including classification,strength & chemical test.Engineering report 
containing Data  records, analysis & recomedation on the  bearing capacity,associated settlement, 
depth of foundation.   rock samples 2 5 10

Item Description Unit Quantity Rate  Total amount


Ksh Ksh
1 Mobilisation and Demobilisation
Mobilisation and demobilisation of One Rotary Coring Rig to Site, as well as all personnel, equipment, 
consumable  and accessories. ls 1 16,500 16,500
1.1
Subsistance,local movement,vehicle ,driver and security etc day 3 6,050 18,150

2 Set Up, Drill & Field  tests 
2.1 Set up of drilling rig and test bequipments over each ready to start drilling ls 2 5,500 11,000

2.2 Soft Ground Auger boring  in Loose Materials (not Infill Materials) 0‐5m m 10 5,500 55,000

2.3 Dito but 5‐10m m 1 5,775 rate only

2.4 Diamond Rock coring 0‐5m m 1 6,325 rate only

2.5 Ditto but 5‐10m m 10 6,641 66,413

2.6 Water table monitoring no 2 1,650 3,300

2.61 Inserting temporary casings to protect collapse  no 2 2,500 5,000

2.62 Drilling water 10,000Ltrs per day (if water is on site desregard this item)  ls 1 12,857 12,857

2.63 Performing  SPT at intervals of 1.5m asssume rock found at 5m no 6 1,980 11,880

2.64 Taking undisturbed soil samples at intervals of 1.5m no 6 1,980 11,880

2.65 Provission of core box, samples jars and bags no 4 1,980 7,920

2.66 Geological logging and photos no 20 220 4,400

3 Laboratory Tests
3.1 Moisture content No 6 275 1,650

3.2 Atterberg limits  No 6 440 2,640

3.3 Particle Size Distribution (sieve analysis) No 6 550 3,300

3.4 Particle Size Distribution ( Hydrometer analysis) No 6 1,540 9,240

3.5 Consolidated Shear  box test No 2 3,300 6,600

3.6 Tri axial test No 2 2,860 5,720

3.7 One Dimensional Consolidation Test No 2 4,400 8,800

3.8 Chemical test PH‐Chloride and sulphate No 2 3,630 7,260

3.9 Determination of rock UCS test  No 8 1,980 15,840

4 Report
4.1 Detailed Geotechnical report including bearing capacity and settlement LS 1 40,000 40,000

TOTAL 325,350

VAT 16% 52,056

TOTAL CONTRACT VALUE 377,406

 
General Notes

1 The contract is lump sum 377,406
2 50%  advance payment before mobilization        188,703
3 50% Balance on submission of the final report and not later than  14 days of invoicing.        188,703
4 Client to provide a completion certificate
5 The client to responsible for getting  access permits from City council and Nema/NCA   at no cost to Votex Ltd.
6 The client to responsible for settling all  compensations issues including land,vegetation,Fence  etc
7 The client to be responsible for locating all   service lines near or close to test points.
Time schedule  day  day 

8 Mobilization to site days after receipt of advance payment 1 1

9 Completion of Drilling  and sampling after arrival on site 3 4

10 Completion of Laboratory testing after arrival on site 7 11

11 Compiling and Submission  of  draft  report 2 13

12 Submission of the Final Report  after arrival on site 2 15

NB Our drilling team  will be on site within 24 hours of receipt of item 2 above. 

Xenocon consultants 2nd -Nov 2017