PRE-BID PV PLANT BOQ

DISCRIPTION QUANTITY UNITS

Earthwork in excavation up to 1.0m depth below


existing ground level including lifting, dressing of sides
and ramming of bottom, shoring, strutting,
dewatering,if required stacking of excavated soil with all
equipment and materials, including disposal for the lead 49,242 M3
upto 500m with in Plant boundary. all complete as per
specification, drawings and instructions of the Engineer
in charge in all types of soil/ soft/ whethered rock/ hard
rock.

Filling with excavated soil obtained from item 3.2 ,


including transportation, unloading etc... and filling with
soil including spreading in layers not exceeding 300 mm
in loose thickeness of each and consolidating each
deposited layer by ramming and watering to achieve 45,563 M3
minimum 95% of maximum dry density all as per the
specification, drawings and instructions of the Engineer
in charge in all type of Soil, Soft/ weathered rock/Hard
rock all complete for all lifts and upto 500m lead with in
plant.