Construction Industry Will Face Labour Issues For Next 6 To 9 Months and Labor Rates May Go Up - Vevij Doors

You might also like

You are on page 1of 10

Locations

COVID 19 IMPACT ON WORLD


Measured

?
CAN THE WORLD DELIVER
COMPLETELY DEVELOPED
PROJECTS ON TIME AFTER
THE CRISIS HAS PASSED?

28 34
24 44
31
18

43 45
38
35
A B C 29
25
60% 55% 50%
WOLRD WILL JOB, CAREER, & WITH DELAYED
DEPEND ON LABOUR PRODUCTIONS,
OUTSOURCING PROBLEMS WILL SUPPLY WILL NOT
BE COMMON MATCH DEMAND (BAR NO ARE IMAGINARY PART)
AN OVERVIEW

Indian Construction Sector


Unlike other sectors, the Indian Construction
Industry is heavily dependent on the physical
presence of its people. Capital Expenditure: Inr.60
billion/annum (on an average)
As many as 15.62 lakh units across the top
seven cities were in various stages of
construction across the landscape as of 2019 Offers employment to over 49
end. million – the 2nd largest source
of employment in the country

3rd Quarter:
2nd Quarter: monsoons
4th Quarter: Of these 60-65% are migrant
1stQuarter: Revenue
New Projects
Project hamper
generating + labourers
construction construction,
Launched planning of
in full swing focus is on
new projects
sales
HOW THIS LOCKDOWN IS 120

IMPACTING CURRENT PROJECTS100


New
• Labourers have returned to their villages, Housing
manpower is negligible Launches
80
• Raw material supply and resources have in 2019
been stopped completely First
Quarter
• As soon as the lockdown is raised, India will 60
face monsoons and construction activity New
will slow down. Housing
Launches
• All interconnected activities will be delayed 40
in 2020
• There will be a huge loss of revenue by the First
4th quarter of the year Quarter
20
• The end user will be impatient for
possession due to ticking rate of interest on
EMIs 0
PROBLEMS A DEVELOPER WILL CONTINUE
TO FACE EVEN AFTER THE CRISIS
• Once things get back to normalcy, there will
be a huge gap in demand and supply
• There will be a massive load on
transportation systems & raw material
supply
• Shortage of manpower will not be solved
overnight and tasks requiring expertise Sources:
The Economic Times
skills will see short supply and will be high
KPMG
over priced. Architectural Digest
• Certain financial sources might be forced to Deloitte
declare bankruptcy. The Hindu
• Overall development will still be slow The Hindu Business
To summarize:

YOU WILL BE
RACING
AGAINST TIME
TO COMPLETE
PROJECTS IN
HAND.
PROBABLE SOLUTIONS

• Technological advancements to solve problems


• Progressive work solutions
• Increased factory production
• Installation of modular / retro-fit / ready to install product.
• A shift to using finished products on site

Considering all of the above,


How vevij stands apart ?
PRESENTING
FACTORY FINISH
MODULAR DOOR
SET SYSTEM:
VEVIJ:
The Doors
Unlocking your mind to
modularity…
A HASSLE -
FREE
EXPERIENCE
SWITCH TO

VEVIJ
DOORS
FOR
GOOD
WHY VEVIJ?
QUICKER MANUFACTURING

• Developer gets a modular, SUPERIOR QUALITY


factory finished product TIME SAVING
• Supply matches site demand
• All doors will be ready in time EASY INSTALLATION
• Ready to fit less than ¼ Labour HIGHLY DURABLE
require
• Maintenance free product for the CONCURRENT ENGINEERING POSSIBLE
end user USER FRIENDLY
• 5 years warranty
• Product can be customized for all COST EFFECTIVE
openings. CUSTOMIZABLE SIZES

HUGE RANGE OF VARIETY


For More Details Log on to
www.vevij.com
Click on Link For Video
https://www.youtube.com/watch?v=
qFMJCSBYa8g
Or Contact
RAZIYA - 7420061414
LIYAKAT – 8087610632
JINESH - 7410048139

You might also like