1.0 Purpose
2.0 Scope
3.0 Reference
4.0 Responsibility
5.1 Procedure
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 08
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 3 of
Safety Procedure for Installation of various markers Rev No. 0
11
5.3 PPEs
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 08
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 4 of
Safety Procedure for Installation of various markers Rev No. 0
11
I. Arial Markers
Arial markers shall be installed at every 5 kms or as finalized
by EPMC/Client.
II. KM Markers
KM Marker shall be installed at every km, It should indicate
the distance from the base point or as desired by EPMC
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 08
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 5 of
Safety Procedure for Installation of various markers Rev No. 0
11
5.6 Precaution
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 08
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 7 of
Safety Procedure for Installation of various markers Rev No. 0
11
xiii. Ensure First aid box available and trained first aid person at
site.
xiv. Ensure the availability of antivenom at site.
xv. Surrounding area should be barricade and don’t allow
unauthorized person in that area while loading pipe.