Issue By Approved By
1.0 Purpose
2.0 Scope
3.0 Reference
4.0 Responsibility
5.1 Procedure
5.3 PPEs
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 09
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 4 of
Safety Procedure for Tie-in Joints Rev No. 0
18
9. Welding
10. Field joint coating
11. Radiography
12. Lowering
13. Backfilling
1. Crew safety
i. Injury/Accident due to collapsing of trench/Machinery
failure
ii. Noise, eye hazards
iii. Electrical hazards
iv. Radiation Hazard
2. Electrical safety
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 09
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 6 of
Safety Procedure for Tie-in Joints Rev No. 0
18
3. Trenching
i. Falling of person in trench
ii. Damage of underground utilities
iii. Snake Bite
4. Handling of pipes
i. Falling of Pipe due to breaking sling belt
ii. Failure of Hydra/Crane etc. may cause accident at
site
iii. Damage of lifting equipment due to overload
iv. Poor slinging methodology
v. Overhead electric lines
vi. Soft ground condition
vii. Unbalancing may lead to Tilting of equipment
5. Welding
i. Fire Hazard
ii. Burn
iii. Gas / Fumes
iv. Dehydration
v. During welding operation, the eye may be penetrated
by sparks, spatter, slag, infra-red light, ultraviolet light,
foreign bodies
7. Radiography
i. Radiation exposure
ii. Un-authorized operation/entry
iii. Health Hazards
iv. Electrical Hazards
v. Hit due to fall of radiography camera while setting.
vi. Fall/slip in trench
vii. Snake/Insect bite
8. Lowering
i. Accident
ii. Falling in trench
iii. Collapsing of trench
iv. moving equipment
v. overhead power lines
vi. open excavations
9. Backfilling
i. Injury
ii. Run over by vehicle
iii. Hit due to movement of vehicle while loading/unloading
iv. Soft ground condition
v. Un-authorized operation.
vi. Respiratory problem from dust
5.6 Precaution
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 09
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 8 of
Safety Procedure for Tie-in Joints Rev No. 0
18
1. Crew safety
i. All working person should be healthy and mentally sound.
ii. All the testing equipment shall have valid calibration test
certificates.
iii. All the joint coating material to be used shall be within the
valid expiry dates as given by the manufacturer
iv. Crew should wear proper PPEs asper job and site
requirement.
v. Use Ear buds and Goggles while blasting is in progress.
vi. Don’t touch any open/cut electric wire which may cause
electric shock.
vii. Person having respiratory disease should use proper mask
while working
near blasting area.
2. Electrical safety
3. Trenching
4. Handling of pipes
i. A Tie-In pit or bell hole of suitable length, depth and
width shall be cut to enable to work freely inside the
trench.
ii. Proper care shall be taken so as not to allow pit to
collapse or pit wall caving in.
iii. Necessary supports shall be used wherever required
iv. Check crane/sling/chain pulley certification for their
Safe Working Load and testing date.
v. Safe Working Load must be mentioned on each lifting
device.
vi. Better communication between crane operator and
foreman.
vii. Use only tested lifting tools & tackles certified by TPI.
viii. Use of PPE’s like safety shoe, hard hat, hand gloves etc.
ix. Only trained and experienced operator shall operate
lifting equipment.
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 09
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 11 of
Safety Procedure for Tie-in Joints Rev No. 0
18
5.Welding
7. Radiography
8. Lowering
i. Lowering of pipeline should be done after approval from
owner / consultant. The activity should be done in
presence of Authorized representative of Owner /
Consultant.
ii. During lowering-in, Contractor must ensure that the pipe
is not subjected to inadmissible stresses ; the pipeline is
supported over a sufficient surface area to prevent the
supports from penetrating the coating; a sufficient
number of machines with the required capacity will be
used for lowering-in the pipeline strings.
iii. It shall be ensured that the pipe is laid gently by using
sufficient number of side booms for holding the line in
gentle s-curve maintaining the minimum elastic bend
radius.
iv. The pipeline must be laid without interruption for the
whole or the length of section available. Lowering shall
not be left in half way.
v. Where water is present, no laying shall be permitted until
the ditch has been drained to the extent and for the time
necessary to make visual inspection possible of the bed
on which the pipe is to be laid. Following such inspection,
the presence of water will be permitted, provided that it is
not so high as to cause cave-in of wall of the trench or
floating of the pipeline before backfilling, when weighting
is not provided for the pipe.
vi. Pipe shall never be picked up or lowered while any
employees are between the tractor and the pipe, and pipe
shall never be carried over the heads of employees.
हिन्दुस्तान पेट्रोलियम कार्पोरेशन लिमिटेड Doc No. SP – 09
Hindustan Petroleum Corporation Limited
Issue No.
परियोजना एवं पाइपलाइन 01 Issue Date
Projects & Pipelines
Page 17 of
Safety Procedure for Tie-in Joints Rev No. 0
18
9. Backfilling
6.0 RECORDS