CONCRETE REQUISITION

CONCRETE
GRADE OF LOADING CONCRETE Pump Sign of Site REMARKS- PART OF STRUCTURE Grid
SR NO LOCATION QTY CONCRETE TIME @ UNLOADING TM1 TM2 TM3 TM4 Required Engineer no/Fottiing no/Column /Slab
PLANT TIME @ SITE yes/No

Note:- Please PLAN as per schedule TO AVOID DELAY OF CONCRETE


1)Column concrete unloading for 1cum max time is one hour.
2)Fotting concrete unloading for 6cum max time is one hour
3)Slab concrete unloading for 18cum max time is one hour
4)Any PCC concrete unloading for 12cum max time is one hour
5)All reuirment delevary depends upon availability of T.M

Sign of P&M Sign of QC Sign of Project Manager Sign of Site Incharge


Incharge Engineer
CENTRAL UNIVERSITY OF KARNATAKA GULBARGA
UNITY INFRA PROJECTS LTD
LIST OF EQUIPMENT FOR MATERIAL TESTING LABOATORY
PHASE –II
SI No Description Remarks
1 Balance Capacity of 100kgs,32kgs,10kgs and 600gms Each one
2 Eelcricity Oprerated Oven 1
Sieves:-
100mm,80mm,63mm,50mm,40mm,25mm,20mm,12.5mm,10mm, 1 Set
3 4.75mm complet with pan
Sieves with Brass Fram:-
4.75mm,2.36mm,1.18mm,600mic,300mic,150mic,90mic75mic 1 Set
4 complet with pan
5 Sive Shaker 1 no
6 Equipment for Slump Cone with plat,Tamping Rod etc 2 Set
Compressive testing machine ,Electrical cum manually operated 1 Set
7 Capacity 1000KN
8 Measuring cylender 250ml Capacity 3 no
9 Enemal Trys 2 no
10 Cube mould for Concrete 150mmx150mmx150mm 36 no
11 Cube mould for Cement 70.6mmx70.6mmx70.6mm 12 no
12 Cube Vibrating Table Elactricaly operated for concret cube casting 1 no
13 Cube Vibrating Table Elactricaly operated for cement cube casting 1 no
14 Vicat Apparatus for cement test 1 no
15 Soundness Apparatus for cement test 1 Set
16 Rebound hammer for concrete test 1 no
17 Vernier Caliper 1 no
18 Screw Guage 1 no
19 Dry Density Apparatus By Sand Replacment Method 1 no
20 Dry Density Apparatus By core Cutter Method 1 no
21 Pycnometer 4 no
22 Flakiness And Elongation Indices Apparatus 1 Set
23 CBR Value Apparatus at( PnM ) 1 no
CENTRAL UNIVERSITY OF KARNATAKA GULBARGA
UNITY INFRA PROJECTS LTD
LIST OF REGISTER MAINTAINED AT SITE
PHASE –II
Register No Title of Register Remarks

1 COMPRESSIVE STRENGTH TEST OF CONCRETE Valume 1 and 2

2 SLUMP TEST OF CONCRETE

3 PARTICLE SIZE DISTRIBUTION 40MM AGG

4 PARTICLE SIZE DISTRIBUTION 20MM AGG

5 PARTICLE SIZE DISTRIBUTION 12.5MM AGG

6 PARTICLE SIZE DISTRIBUTION COMBINED AGG

7 PARTICLE SIZE DISTRIBUTION OF SAND

8 SILT CONTENT TEST OF SAND

9 BULKAGE TEST OF SAND

10 COMPRESSIVE STRENGTH TEST OF CEMENT

11 PERCENTAGE OF SOFT AND DELETERIOUS OF 20MM

12 PERCENTAGE OF SOFT AND DELETERIOUS OF 12.5 MM

13 PERCENTAGE OF SOFT AND DELETERIOUS OF 40MM

14 COMPRESSIVE STRENGTH TEST OF BRICK Valume 2 of 14

15 WATER ABSORPTION OF BRICK Valume 2 of 14

16 DIMENTION OF BRICK

17 ANTI TERAMITE TRETMENT

18 STANDARD DEVIATION

19 STEEL CONSUMPTION
20 CEMENT CONSUMPTION Valume 1 and 2

21 APPROVED MAKE LIST

22 WATER PROOFING CHAMICAL

23 PLASTIC EMULSION,SYNTHETICAL ENAMAL ,TEXTURE PAINT

24 WATER PONDING

25 COMPRESSIVE STRENGTH TEST OF PAVER BLOCK


CONSTRUCTION OF BUILDINGS FOR VARIOUS SCHOOLS INCLUDING
SITE DEVELOPMENT AND BULK SERVICE
CENTRAL UNIVERSITY OF KARNATAKA GULBARGA
PHASE –II
List of Registers Maintained at site
[1] COMPRESSIVE STRENGTH TEST OF CONCRETE
[2] SLUMP TEST OF CONCRETE
[3] PARTICLE SIZE DISTRIBUTION 40MM AGG
[4] PARTICLE SIZE DISTRIBUTION 20MM AGG
[5] PARTICLE SIZE DISTRIBUTION 12.5MM AGG
[6] PARTICLE SIZE DISTRIBUTION COMBINED AGG
[7] PARTICLE SIZE DISTRIBUTION OF SAND
[8] SILT CONTENT TEST OF SAND
[9] BULKAGE TEST OF SAND
ORGANIC IMPURITIES OF SAND
[10] COMPRESSIVE STRENGTH TEST OF CEMENT
[11] PERCENTAGE OF SOFT AND DELETERIOUS
MATERIAL 20MM AGG
[12] PERCENTAGE OF SOFT AND DELETERIOUS
MATERIAL 12.5MM AGG
[13] PERCENTAGE OF SOFT AND DELETERIOUS
MATERIAL 40MM AGG
[14] COMPRESSIVE STRENGTH TEST OF BRICK
[15] WATER ABSORPTION OF BRICK
[16] DIMENTION OF BRICK
[17] PAINT/CHAMICAL
[18] STANDARD DEVIATION
[19] STEEL
[22] CEMENT
[21] APPROVED MAKE LIST
CONSTRUCTION OF BUILDINGS FOR VARIOUS SCHOOLS INCLUDING
SITE DEVELOPMENT AND BULK SERVICE
CENTRAL UNIVERSITY OF KARNATAKA GULBARGA
PHASE –II
BRICKS DESIGN FOR ONE CUM

CEMENT 170Kgs
FLY ASH 150 Kgs
STONE DUST 1300 Kgs
6MM AGG 650 Kgs
WATER 130kgs

Total 2400Kgs
2400
CONSTRUCTION OF BUILDINGS FOR VARIOUS SCHOOLS INCLUDING
SITE DEVELOPMENT AND BULK SERVICE
CENTRAL UNIVERSITY OF KARNATAKA GULBARGA
PHASE –II
PAVER BLOCK MIX DESIGN FOR ONE CUM

BASE MIX
CEMENT 300 Kgs
SAND 600 Kgs
STONE DUST 1000 Kgs
6MM AGG 300 Kgs
WATER 130 kgs

Total 2330 Kgs

PAVER BLOCK MIX DESIGN FOR ONE CUM


FACE MIX
CEMENT 700Kgs
SAND 1440Kgs
WATER 160 kgs

Total 2280 Kgs

700
1440
160
2300
Area QTY
60mm paver 0.024757 0.001485 673
2.6R2

80mm paver 0.002 500


CONSTRUCTION OF BUILDINGS FOR VARIOUS SCHOOLS INCLUDING
SITE DEVELOPMENT AND BULK SERVICE
CENTRAL UNIVERSITY OF KARNATAKA GULBARGA
PHASE –II
M25(1:1:2) MIX DESIGN ACC 43GR OPC M25 (1:1:2)MIX DESIGN ULTRATECH 43GR OPC

CEMENT 380 Kgs CEMENT 380 Kgs


SAND 600 Kgs SAND 794 Kgs
CA 20mm 612 Kgs CA 20mm 594 Kgs
CA 12.5mm 612 Kgs CA 12.5mm 594 Kgs
WATER 191.57 kgs WATER 182.15 kgs
Admixture 0.3% by weight Admixture 1.9 L/cum
M25 (1:1:2)MIX DESIGN ULTRATECH 43GR OPC MIX DESIGN J.K CEMENT 43GR OPC
100% crushed sand M25(1:1:2)
CEMENT 380 Kgs CEMENT 380 Kgs
SAND 726 Kgs SAND 781 Kgs
CA 20mm 673 Kgs CA 20mm 590 Kgs
CA 12.5mm 450 Kgs CA 12.5mm 593 Kgs
WATER 179 kgs WATER 188.13 kgs
Admixture 3.8 L/cum Admixture 1.9 L/cum
M15(1:2:4) VALUMETRIC M10(1:3:6) VALUMETRIC
CEMENT 320 Kgs CEMENT 220 Kgs
SAND 640 Kgs SAND 720Kgs
CA 20mm 540 Kgs CA 20mm 600 Kgs
CA 12.5mm 740 Kgs CA 12.5mm 660 Kgs
WATER 170 kgs WATER 170 kgs
M7.5 (1:4:8) PCC M5(1:5:10) PCC
CEMENT 170 Kgs CEMENT 130 Kgs
SAND 700 Kgs SAND 700 Kgs
CA 40mm 680 Kgs CA 40mm 700 Kgs
CA 12.5mm 680 Kgs CA 12.5mm 700 Kgs
WATER 150 kgs WATER 150 kgs
CONCRETE REQUISITION

CONC CONC
RETE RETE
GRAD LOAD UNLO
E OF ING ADIN
SR NO
LOCATIONQTY CONC TIME G TM1 TM2 TM3 TM4
RETE @ TIME
PLAN @
T SITE

Note:- Please PLAN as per schedule TO AVOID DELAY OF CONCRETE


1)Column concrete unloading for 1cum max time is one hour.
2)Fotting concrete unloading for 6cum max time is one hour
3)Slab concrete unloading for 18cum max time is one hour
4)Any PCC concrete unloading for 12cum max time is one hour

Sign of P&MSign of QC Sign of Project Ma


Incharge Engineer
DATE:

REMA
RKS-
PART
OF
Pump Sign STRU
Requi of CTUR
TM5 red Site E Grid
yes/N Engin no/Fo
o eer ttiing
no/C
olum
n
/Slab
Project ManagerSign of Site Incharge

You might also like