Project Title : Atlantis Alliance Office Fit-Out

Location : Ramon Magsaysay Center Building


Subject : Proposed Atlantis Alliance Office Fit-Out
Total Area : 88.70 SQM

02.28.20 02.29.20 03.02.20 03.03.20 03.04.20 03.05.20 03.06.20 03.07.20 03.09.20 03.10.20 03.11.20 03.12.20 03.13.20 03.14.20 03.16.20 03.17.20 03.18.20 03.19.20 03.20.20 03.21.20 03.23.20 03.24.20 03.25.20 03.26.20 03.27.20 03.28.20 03.30.20 03.21.20 04.01.20 04.02.20
DAY 1 DAY 2 DAY 3 DAY 4 DAY 5 DAY 6 DAY 7 DAY 8 DAY 9 DAY 10 DAY 11 DAY 12 DAY 13 DAY 14 DAY 15 DAY 16 DAY 17 DAY 18 DAY 19 DAY 20 DAY 21 DAY 22 DAY 23 DAY 24 DAY 25 DAY 26 DAY 27 DAY 28 DAY 29 DAY 30
I General Requirements
I.1 Mobilization
I.2 Demobilization
I.3 Hauling / Pullout of Debris
II Demolition Works

Dry Wall Partition Demolition: Demolition of existing


II.1
dry wall partition as per requirement and dismantling of
existing reception desk; includes necessary restoration.
III Carpentry Works
Dry Wall Gypsum Partition(New): 100mm dry wall
III.1 partition; 12mm thk gypsum board on 600mmx600mm
standard metal frames.
IV Finishes
Solid Wall Partition(Existing): Repainting of existing solid
wall partition; 3 coats of color white semi-gloss enamel
IV.1
paint with 2 coats of flat latex primer from Boysen
Paints.
Dry Wall Gypsum Partition(New): 3 coats of color white
IV.2 semi-gloss enamel paint with 2 coats of flat latex primer
from Boysen Paints.

General Ceiling: Supply and installation, replacement of


IV.3 600mmx600mm acoustic panels(approved equivalent);
includes leveling, refurbishing and repainting(color gray /
match existing) of existing aluminum T-runners.
Lighting Fixtures: Restoration of lighting fixtures;
IV.4
repainting of lighting fixture housing.
Baseboard: 100mmH solid k/d tanguile wood, paint(gray
IV.5
/ match existing) finish.
V Glass and Glazing Works
Framed Glass Wall Partition with Swing-type Framed
V.1 Glass Door: Dismantling existing framed glass wall
partition and door.
Framed Glass Wall Partition with Swing-type Framed
V.2 Glass Door: Relocation / installation of existing framed
glass wall partition and door.
Swing-type Glass Door: Replacement of existing doors;
V.2 10mm thk clear tempered glass panels, includes
hardware and fittings.
VI Electrical Works
Electrical Rewiring: Supply and installation; includes
VI.1
accessories necessary wirings, and roughing-ins.
2-gang Wall Switch: Supply and installation of Panasonic
VI.2 wide series 2-gang wall switch; includes complete
accessories, wirings, and roughing-ins.
Duplex Convenience Outlet: Supply and installation of
VI.3 Panasonic wide series duplex convenience outlets;

includes complete accessories, wirings, and roughing-ins.


Data Outlet: Supply and installation of Panasonic wide
VI.4 series data outlets; includes complete accessories,
wirings, and roughing-ins.
Voice Outlet: Supply and installation of Panasonic wide
VI.5 series voice outlets; includes complete accessories,
wirings, and roughing-ins.

Legend: Task Schedule


Lag Time
Delay On Schedule
Activity Done