Vijayakumar

 Causality portico flooring


 Causality isolation room finishing
 Hospital expansion follows up with Modular
 Interlock work around hospital

Syam

 Laundry civil follow up


 Laundry commissioning follow up with steffab
 3rd floor Dialysis leakage
 Bostic water proof painting
 Follow up with panchayath

Naveen

 8th floor works


 EEG and EMG shifting
 Terrace sheet replacing and roof extension

Ramesh

 Laundry electrical and ELV


 Follow up with Cosmic for convention plant room expansion
 Follow up with Vtech for additional load and transformer charging

Jeena

 Hospital expansion electrical and ELV


 Electrical and ELV in 8th floor
 Fixing of balance cameras and final rectification.

Vijeesh

 Laundry and hospital expansion plumbing


 8th floor plumbing fitting changing
 STP treated water piping for campus gardening

Alsohy

 HVAC for laundry and hospital expansion


 Fire for laundry and hospital expansion
 Follow up fire approval for above area with Nefco