The document outlines a schedule for completing KEC 132KV work including excavation, horizontal directional drilling, cable laying, termination and jointing, backfilling, and commissioning. The work involves 6 sections and is scheduled to take place from March 3rd to April 6th 2020. Section 1 involves work from Mohitnagar GIS to tower 1/0, section 2 from Star Cement Gantry to joint bay 2, section 3 from joint bay 2 to joint bay 1, and section 4 from joint bay 1 to tower 4/0. Cable termination, jointing kit installation, and backfilling are also scheduled for completion by April 6th.
The document outlines a schedule for completing KEC 132KV work including excavation, horizontal directional drilling, cable laying, termination and jointing, backfilling, and commissioning. The work involves 6 sections and is scheduled to take place from March 3rd to April 6th 2020. Section 1 involves work from Mohitnagar GIS to tower 1/0, section 2 from Star Cement Gantry to joint bay 2, section 3 from joint bay 2 to joint bay 1, and section 4 from joint bay 1 to tower 4/0. Cable termination, jointing kit installation, and backfilling are also scheduled for completion by April 6th.
The document outlines a schedule for completing KEC 132KV work including excavation, horizontal directional drilling, cable laying, termination and jointing, backfilling, and commissioning. The work involves 6 sections and is scheduled to take place from March 3rd to April 6th 2020. Section 1 involves work from Mohitnagar GIS to tower 1/0, section 2 from Star Cement Gantry to joint bay 2, section 3 from joint bay 2 to joint bay 1, and section 4 from joint bay 1 to tower 4/0. Cable termination, jointing kit installation, and backfilling are also scheduled for completion by April 6th.