Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F G H I J KEY TO INSTRUMENTATION

ETC Source-4 10° 5

ETC Source-4 19° 2

ETC Source 4 26° 2

1 #1 BOOM SR #1 BOOM SL 1
213 233 ETC Source-4 36° 2
0 <27'-4" FROM C/L >27'-4" FROM C/L 0
+26'-10" FROM P/L +26'-10" FROM P/L
ETC S4-14° LED Tungsten 9
DETAIL PLAN VIEW PLAN VIEW DETAIL

ETC S4-26° LED Tungsten 17

T
212 211 210 232 231 230
2 4 6 #3 LADDER SR #3 LADDER SL 6 4 2 Ovation E260 36° 11

T
©Steve
Shelley
2003

VIPER
VIPER

PERF
573 7 7 576

PERF
<27'-4" FROM C/L >27'-4" FROM C/L ©Steve
©Steve
Shelley

Ovation E260 36° 11


1 3 5 5 3 1
2003 2003
Shelley Shelley
2003
©Steve

T
L

L
+19'-4" FROM P/L +19'-4" FROM P/L
252 251 250 272 271 270
Ovation E260 36° 11

T
DETAIL PLAN VIEW PLAN VIEW DETAIL

ETC S4-19°LED Lustr 6

L
ETC S4-26° LED Lustr 14

L
1 1
ETC S4-36° LED Lustr 38

L
#4 TOWER SR #4 TOWER SL
1 2 3 4 4 3 2 1

L
ETC S4 Fresnel Lustr 6

L
284 294 304 <27'-4" FROM C/L >27'-4" FROM C/L 308 298 288
583 +19'-4" FROM P/L +19'-4" FROM P/L 586 ETC ColorSource PAR-MR 20
DETAIL PLAN VIEW PLAN VIEW DETAIL
ETC S4-PAR (MFL) 4

ETC ColorSource Linear 4


14
Deep Blue
209 208 207 229 228 227
Stormy Strobe 2
2 4 6 ©Steve
Shelley
2003

#2 LADDER SR #2 LADDER SL 6 4 2

VIPER
VIPER

PERF
572 7 7 575
PERF

2 1 3 5
©Steve
Shelley
2003

<27'-4" FROM C/L >27'-4" FROM C/L ©Steve


Shelley
2003
©Steve
Shelley
2003

5 3 1
2 Practical 35
L

L
+13'-6" FROM P/L +13'-6" FROM P/L
249 248 247 269 268 267 Birdie 12
DETAIL PLAN VIEW PLAN VIEW DETAIL

Robe BMFL Followspot 2

FLW SPOT
BMFL
Martin Mac Viper
10
©Steve
Shelley
2003

VIPER
PERF
Performance

High End SolaFrame Theatre 6

THTR
#3 TOWER SR #3 TOWER SL
1 2 3 4 4 3 2 1
L

L
283 293 303 <27'-4" FROM C/L >27'-4" FROM C/L 307 297 287 High End SolaSpot 1000 12

1000
582 +13'-6" FROM P/L +13'-6" FROM P/L 585
DETAIL PLAN VIEW PLAN VIEW DETAIL CHAUVET R2 WASH 22
3 3

GENERAL NOTES
206 205 204 226 225 224 - Please have ample R119, R132, and blackwrap available at focus call.
- Please have all color, templates, and accessories framed and loaded
2 4 6 ©Steve
Shelley
2003

#1 LADDER SR #1 LADDER SL 6 4 2 prior to focus. See Channel Hookup and Instrument Schedule for
details.

VIPER
VIPER

PERF
571 7 7 574
PERF

- Please have top hats and barn doors onhand at focus call - all sizes.
<27'-4" FROM C/L >27'-4" FROM C/L ©Steve
©Steve
Shelley

1 3 5 5 3 1
2003 2003
Shelley Shelley
2003
©Steve
L

L
- Instruments hung on 18" centers unless otherwise noted herein.
+4'-0" FROM P/L +4'-0" FROM P/L
246 245 244 266 265 264
DETAIL PLAN VIEW PLAN VIEW DETAIL LEGEND
ABBREVIATIONS: FOCUS FOC
R = Rosco COLOR CLR
G = GAM
A = Apollo LENSº
LS = Line Set TEMPLATE
4 4 GP = Ground Plan
LX = Electric UNIT #
TD = Tech. Direct. 5
LD = Lighting Dsgnr
#2 TOWER SR #2 TOWER SL
1 2 3 4 4 3 2 1 CHANNEL #
L

L
282 292 302 <27'-4" FROM C/L >27'-4" FROM C/L 306 296 286
581 +4'-0" FROM P/L +4'-0" FROM P/L 584
DETAIL PLAN VIEW PLAN VIEW DETAIL

**SIDE TRUSSES TRIM AT +23' FROM **SIDE TRUSSES TRIM AT +23' FROM
SHOW DECK TO TOP CORD OF TRUSS SHOW DECK TO TOP CORD OF TRUSS
5 5
http://www.mikewoodld.com
mike@mikewoodld.com
813-716-1909 Cell / 646-694-8656 Studio
736 Woodcraft Drive - Nashville, TN 37214
US

US
This drawing contains a visual concept and construction suggestions.
The lighting designer and design assistants/associates are not qualified
to determine or guarantee the structural integrity or appropriateness of
any construction or rigging methods, and assume no liability or
responsibility for the improper engineering, construction, or use of any
and all designs contained on this document and elsewhere throughout
the production. Always consult a licensed structural engineer before any
rigging or construction takes place. All applicable local and national fire
and life safety codes must be follwed at all times.

203 202 201 223 222 221


REVISION HISTORY
8 10 12 12 10 8
NO. REVISION DATE BY
A01 Document Prep 10 NOV 19 DBH
A02 Rough Plot 15 NOV 19 DBH
B01 Shop Order Submission - V1 25 NOV 19 DBH

HS LADDER - R HS LADDER - L
>C01< Load In 03 NOV 19 DBH

7 9 11 11 9 7
L

L
243 242 241 XX FROM C/L XX FROM C/L 263 262 261
6 2 4 6
7'-4" DECK TO BOTTOM RUNG 7'-4" DECK TO BOTTOM RUNG
6 4 2 6
333 332 331 336 335 334
14 14
713 714
1 3 5 5 3 1
T

T
323 322 321 13 13 326 325 324
713 714 HOLIDAY INN
PRODUCTION STAFF
DS

DS
DIRECTOR . . . . . . . . . . . . . . . . . . . . . GREG LONDON
LIGHTING DESIGNER . . . . . . . . . . . . . . .MIKE WOOD
ASSOC LD/PROGRAMMER . . . . DALTON HAMILTON
ASSOC LIGHTING DSGNR . . . . . . . . . . . . .ABBY MAY

PROD. ELEC . . . . . . . . . . . . . . .MICHAEL BARAHURA


PROD. MANAGER . . . . . . . . . . . . . . JUSTIN GAMERL
- THE BYERS THEATRE -
7 7 SANDY SPRINGS, GA - DECEMBER 2019

#1 TOWER SR #1 TOWER SL DWG NUMBER


1 2 3 3 2 1 SCALE 1/2" = 1'0"
1/4"
L

L
<24'-4" FROM C/L >24'-4" FROM C/L
281 291 301 305 295 285
3
UNLESS OTHERWISE NOTED
-5'-0" FROM P/L -5'-0" FROM P/L

DETAIL PLAN VIEW PLAN VIEW DETAIL


PG SIZE ARCH D
OF 7

A B C D E F G H I J
LIGHT
BOOM +
PLOT
LIGHT PLOT
LADDER
SIDE LIGHT BUILD

You might also like