QUANTITIES QUANTITIES FOR R.C. CATCH BASIN :


FLOORING = 1.85 m.(1.80 m.)(0.20 m.)
= 0.666 cu.m.
ITEM AREA ITEM AREA

0.50 m
WALL 1 (AT CULVERT SIDE) = 1.70 m.(1.80 m.)(0.20 m.) - 0.194 m³ HOLE CULVERT

2.42 m
CUT

FILL
16.86 m²

0.00 m²
℄ 100.00 m. CUT

FILL
11.88 m²

5.03 m²
0.91 m
℄ WALL 2 (OPPOSITE SIDE OF INLET PIPE)

WALL 3 (LINE DITCH SIDE)


= 0.418 cu.m.
= 1.70 m.(1.80 m.)(0.15 m.)
= 0.459 cu.m.
= {(1.70 m. + 1.70 m. + 1.44 m. + 1.20 m.)/4}(1.50 m.)(0.15 m.)(2 SIDES)
100.00 m.

= 0.680 cu.m.
3.60 m TOTAL = 2.22 cu.m.
96.250 95.669
95.612
94.550 4.000 3.502
6.208
0.001
95.650 95.874
95.607 -6.000 -3.990 95.669 1.85
94.316 95.016 93.485 8.433 -3.500
0.000 94.316 0.30
4.000 3.500 FOR PIPE CULVERTS :
2.000
ITEM 103(1)a = 5.22 m²(2.114 m.) S = - 3% S = - 1.50% S = - 1.50% S = - 3% 0.15 m 1.50 m 0.15 m
96.566
94.316 = 11.04 cu.m. 7.163
-2.000 94.052
ITEM 103(3) = 6.82 m.(1.114)(0.20) -4.000

C = 3.60 m.

H = 1.90 m.
A = 2.42 m.

H = 1.90 m
93.485 95.00 m. = 1.52 cu.m. 95.00 m.

2.10 m.
e(L) - 1.50 % -3.500 e(L) ITEM 500(1)a3 = 8.00 Ln.m.. 4 5 6 7 8 0.91 m
- 1.50 % 93.552 1 2 3
-5.490
e(R) - 1.50 %
S = - 3% S = - 1.50% S = - 1.50% S = - 3% FOR R.C. CATCH BASIN : S= 2%
e(R) - 1.50 % INV. ELEV. = 94.030 m.
w(L) 0.00 m. ITEM 103(1)a = 3.53 m².(1.80 m.) RCPC

0.20 m
= 6.35 cu.m. 1.80 m

0.50 x 3.60
93.830
95.344
w 0.00 m. ITEM 103(3) = 1.85 m.(1.80)(0.20) 1.50 x 3.60 B = 1.08 0.000
0.000 1.50
Outer Shoulder - 3.00 % = 0.666 cu.m.
94.081 93.512
93.452
-6.144 ITEM 404(1)a = 183.79 kg. (SEE BAR SCHD'L. R.C. CATCH BASIN) 93.906 5.658
93.059 93.160 93.130 -3.990
-4.351
93.130
2.000 93.059
Outer Shoulder - 3.00 % ITEM 405(1)a3 = 2.22 cu.m. (AS COMPUTED-SEE BACK-UP COMPUTATION) 93.452 3.808
92.985 -2.000 0.000 92.985
4.351 -2.910
-4.500 4.500 INSTALL PROPOSED 8.0 LN.M., 1-LINE, 910 mmØ RCPC 93.512
3.808
FOR HEADWALL : - PROVIDE HEADWALL AND APRON OUTLET/LEFTSIDE
ZOC. EXCAV. = 1.08 m.(1.43 m.)(3.60) - PROVIDE R.C. CATCH BASIN INLET/RIGHTSIDE
= 5.56 cu.m.
90.00 m. ITEM 506(1) = 2.42 m.(3.60)(0.69) - 0.67 m³ HOLE
90.00 m.
STA. 1 + 280.00 = 5.34 cu.m. STA. 1 + 336.00
FOR APRON :
ORIGINAL GROUND 94.316 m. ZOC. EXCAV. = 1.50 m.(0.50)(3.60) ORIGINAL GROUND 94.550 m.
= 2.70 cu.m.
ITEM 506(1) = 1.50 m.(0.50)(3.60)
DESIGN GRADE 93.560 m. = 2.70 cu.m. DESIGN GRADE 95.744 m.
-15.00 -10.00 -05.00 00.00 +05.00 +10.00 +15.00 -15.00 -10.00 -05.00 00.00 +05.00 +10.00 +15.00

ITEM
QUANTITIES

AREA
93.379 93.679
℄ 93.679
93.679
3.000 94.155 ITEM
QUANTITIES

AREA


0.000 7.288
-4.000 -2.000

CUT 12.82 m² 92.792 95.00 m. CUT 11.35 m²


100.00 m.
3.510
92.879
-4.000
FILL 0.00 m² 92.677 FILL 0.00 m² 97.509
-5.481 97.509
97.000 8.000
8.835
S = - 2.53% S = + 2.53% S = - 3% 5.000
S = - 2.53%

95.109 95.509
0.000 3.000
95.309
95.279 -5.500 95.109
92.442 -5.707 -2.000
92.335 2.010 92.371
92.277 -2.262
4.351
-4.604 92.392
92.198 0.000 S = + 2.20% S = - 3%
92.297 S = - 2.20% S = - 2.20%
-4.762
4.500
90.00 m. 95.00 m.
e(L) - 2.53 % e(L) - 2.20 %

e(R) + 2.53 % e(R) + 2.20 %

w(L) 0.262 m. w(L) 0.10 m.


94.619
94.541 94.622 94.720 94.693 4.500
-4.600 -4.437 94.674 94.764
Outer Shoulder - 3.00 % Outer Shoulder - 3.00 % 0.000 4.351
-2.100 1.998

85.00 m. 90.00 m.
STA. 1 + 260.00 STA. 1 + 320.00

ORIGINAL GROUND 93.679 m. ORIGINAL GROUND 95.109 m.

DESIGN GRADE 92.792 m. DESIGN GRADE 95.120 m.


-15.00 -10.00 -05.00 00.00 +05.00 +10.00 +15.00 -15.00 -10.00 -05.00 00.00 +05.00 +10.00 +15.00

QUANTITIES FOR R.C. CATCH BASIN : QUANTITIES


FLOORING = 1.85 m.(1.80 m.)(0.20 m.)
= 0.666 cu.m.
0.50 m

ITEM AREA WALL 1 (AT CULVERT SIDE) = 1.70 m.(1.80 m.)(0.20 m.) - 0.194 m³ HOLE CULVERT ITEM AREA

℄ ℄
2.31m

= 0.418 cu.m.
CUT 1.61 m²
0.91 m
WALL 2 (OPPOSITE SIDE OF INLET PIPE) = 1.70 m.(1.80 m.)(0.15 m.) 95.00 m. CUT 11.18 m²
100.00 m.
92.217 = 0.459 cu.m.
3.500
91.639 91.844 WALL 3 (LINE DITCH SIDE) = {(1.70 m. + 1.70 m. + 1.44 m. + 1.20 m.)/4}(1.50 m.)(0.15 m.)(2 SIDES)
FILL 8.73 m² -4.569 -4.160
91.182 = 0.680 cu.m. FILL 0.00 m²
3.60 m 0.000 TOTAL = 2.22 cu.m.
1.85 95.935
0.30 7.644
S = + 6.3% S = - 1% 0.15 m 1.50 m 0.15 m 94.635 95.935
S = - 6.3% 2.000 2.700
94.635 94.635
H = 1.90 m.

90.186
H = 1.90 m

90.184 -2.000 0.000


-4.956
2.10 m.

-10.711
FOR PIPE CULVERTS : 9 0.91 m
C = 3.60 m.
A = 2.31 m.

90.682 7 8
ITEM 103(1)a = 3.02 m²(2.114 m.) 5 6 94.261
-10.000 3 4
1 2 94.034
= 6.38 cu.m. -3.600
92.969 -5.009
ITEM 103(3) = 7.84 m.(1.114)(0.20) 6.979
S= 7%
= 1.75 cu.m. INV. ELEV. = 90.429 m. 90.00 m. 95.00 m.
0.20 m

RCPC 1.80 m
e(L) - 6.30 % ITEM 500(1)a3 = 9.00 Ln.m.. e(L) - 2.20 % S = - 2.20% S = + 2.20% S = - 3%
S = - 2.20%
1.50 92.213
90.496 6.222
e(R) + 6.30 % e(R) + 2.20 %
0.50 x 3.60

FOR R.C. CATCH BASIN : 1.50 x 3.60 B = 1.08 89.948 91.705 3.822
ITEM 103(1)a = 1.97 m².(1.80 m.) -3.999 0.000 90.228
w(L) 0.66 m. 0.000 w(L) 0.10 m.
89.584
= 3.55 cu.m. 89.584
-3.876
90.113
89.684 -4.956 5.672
ITEM 103(3) = 1.85 m.(1.80)(0.20) 90.113
Outer Shoulder - 3.00 % -6.456 3.822 Outer Shoulder - 3.00 %
= 0.666 cu.m. 93.842 93.896 93.913
-4.437 -2.000 4.351
ITEM 404(1)a = 183.79 kg. (SEE BAR SCHD'L. R.C. CATCH BASIN) 93.761 93.940 93.984
-4.600 0.000 2.009
ITEM 405(1)a3 = 2.22 cu.m. (AS COMPUTED-SEE BACK-UP COMPUTATION) 93.839
INSTALL PROPOSED 9.0 LN.M., 1-LINE, 910 mmØ RCPC 4.500

FOR HEADWALL : - PROVIDE HEADWALL AND APRON OUTLET/LEFTSIDE


ZOC. EXCAV. = 1.08 m.(0.71 m.)(3.60) - PROVIDE R.C. CATCH BASIN INLET/RIGHTSIDE
= 2.76 cu.m.
ITEM 506(1) = 2.31 m.(3.60)(0.69) - 0.67 m³ HOLE 85.00 m. 90.00 m.
= 5.07 cu.m. STA. 1 + 240.00 STA. 1 + 300.00
FOR APRON :
ZOC. EXCAV. = 1.50 m.(0.50)(3.60) ORIGINAL GROUND 91.182 m. ORIGINAL GROUND 94.635 m.
= 2.70 cu.m.
ITEM 506(1) = 1.50 m.(0.50)(3.60)
= 2.70 cu.m. DESIGN GRADE 92.106 m. DESIGN GRADE 94.340 m.
-15.00 -10.00 -05.00 00.00 +05.00 +10.00 +15.00 -15.00 -10.00 -05.00 00.00 +05.00 +10.00 +15.00

REPUBLIC OF THE PHILIPPINES


PROJECT TITLE : SHEET CONTENTS : DESIGNED : CHECKED AND REVIEWED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGH WAYS -DETAILED CROSS SECTION
PLANS FOR THE
REGION XIII
CONCRETING OF SITIO TIGBAO FARM TO MARKET ROAD
OFFICE OF THE DISTRICT ENGINEER (BRGY. BALITE, SAN FRANCISCO, SURIGAO DEL NORTE) C 16
SUNDAY N. ARGUILLAS, JR. GINA P. SORIANO EMMANUEL J. CABANOS HENRY CRUZ J. MARAPAO
SURIGAO DEL NORTE 1ST ENGINEERING DISTRICT R3 18
SURIGAO CITY SOURCE OF FUND: DEPARTMENT OF AGRICULTURE CY 2017
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
APPROPRIATION: P 13,000,000.00
1ST DISTRICT PLANNING AND DESIGN SECTION