Ko Zar Ni (Project Management) Requirements Management Plan

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Ko Zar Ni (Project Management)

REQUIREMENTS MANAGEMENT PLAN

Project Title: Date:

Requirements Collection:
Describe how requirements will be collected. Consider such techniques as brainstorming, interviewing.
To Perform According Construction Law, High Rise Building Guideline, Zoning Plan, Myanamr
Condominium Law, Myanmar Fireforce Law,

CQHP Guideline for


Architect, Construction Project, Civil Work, Inspection, Safety, Sanitary, Machanical, Electrical,
Temporary Electrical Installation, Resource Acquire,Resource Development, …..

Categories:
Identify the categories that will be used to group requirements.
Authority Society (PR Dept)
Planning (Engineering grp)
Execution (Project Team)
Monitoring & Controlling (Inspection, QC & QA)

Prioritization:
Identify the approach to prioritize requirements.
Stakeholder Treashold
Authority Society(CQHP/YCDC) (PR Dept)

Traceability:
Identify the requirement attributes that will be used for tracing requirements, such as functional to
business requirements or functional to security requirements.

Configuration Management:
Describe how requirements can be changed. Include a description of the process and any necessary
forms, processes, or procedures needed to initiate a change. Document how analysis of the impact or
changes will be conducted. Include levels of approval necessary for changes.

Verification:
Inspection, observation, measurement, testing, etc. Include any metrics