S.No. Penetration Test (Field CBR) Test Completion Date Total No. of Days Includes Shifting of Equipments, Test Set Up and Testing Excludes Loading Arragement

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Penetration Total No.

of Days includes Shifting of


Test completion
S.No. Test equipments, test set up and testing
date
(Field CBR) excludes loading arragement

1.0 CBR-1 18/04/2019 3 Hrs

2.0 CBR-2 18/04/2019 3 Hrs

3.0 CBR-3 16/04/2019 3 Hrs

4.0 CBR-4 16/04/2019 3 Hrs

5.0 CBR-5 15/04/2019 3 Hrs

6.0 CBR-6 15/04/2019 3 Hrs

7.0 CBR-7 15/04/2019 3 Hrs

8.0 CBR-8 13/04/2019 3 Hrs


Remarks

Excavation and gravity loading using kentledge


setup is completed prior to the test.
Note:
1.0 Intial time for marking the test location is
delayed due to site specific conditions.
2.0 The excavation for conducting test is carried out
manually and all the eight excavation pit is made.
3.0 The loading platform is same as PLT & PBT and
the CBR test is started after the completion of the
PLT & PBT.

You might also like