Unit – Orient Paper

ORIENT PAPER MILLS, Amlai Mills(CSU)


(Prop. Orient Paper & Industries Limited) Rev : 01
INTERNAL AUDIT OBSERVATION SHEET F/CMR/06

Internal Audit Reference :- IMS Internal Audit Date of Audit: 05.08.2019 Auditee : Mr..Akhilesh Singh,
Auditor :- Mr. R.S.Chakravorty, Mr. Ajay Pal, Dept. / Area: IEM PLANT Mr.C.K.Singh,
Mr. Upendra Verma, Mr. Vikas Chandrakar
IMS Apex Manual / Integrated Departmental Manual AUDIT OBSERVATIONS Remarks
Procedure Ref: ISO 9001, 14001, 45001& RC-14001
4.2 Understanding the needs and expectations of Legal requirements, quality, technological, social responsibility, environmental,
interested parties security, financial elements are included.
5.1.1 General Includes a commitment to maintain and improve OH&S system,. Commitment to
fulfil legal requirements and continual improvement of the OH&S system,
5.4 Consultation and Participation of workers Departmental Meetings on Safety are regularly organized with workers participation.
(45001)
6.1.2 Environmental Aspects (14001) Hazards and risks are identified for related activities with opportunities for
Hazard Identification and Assessment of risks improvement and reducing risks.
and Opportunities
8.1 Operational planning and control Pipe Line maintenance record R/IEM/14 retention time is 1 year SOP/IEM/09 and in SOP
/IEM/10 it is 2 months.
8.1 Operational planning and control Instrument Airline Leakage arresting work was going on near IEM SB Area. Work Permit
was properly signed with safety precautions mentioned. Central First Aid Box all
medicines were checked with expiry date. Expiry date of all items are ok except the
medicated tape.

8.1 Operational planning and control In SOP/IEM/15 disposal of Resin, Activated Carbon, and Membrane Disposal it is
mentioned that these after packing in bags kept in PB Area and DG Hall which
should be kept in single identified place.