The

Condition Monitoring
Review

PLANNED MAINTENANCE
AND THE JIT FACTOR
When considering the use of Just in Time difficult but most important decision to be made if a
manufacturing, proper attention must be given to the long term cost effective solution is to be achieved.
planning of maintenance not only in terms of what The factors that influence this decision are different
Bob Griffiths ofR G should be done and when it can be carried out, but for almost all companies. So much so that very
just as important, adequate funding must be similar companies in different geographical locations
Griffiths Electronic
provided. It is no good having detailed maintenance may arrive at satisfactory but completely different
Services, maintenance schedules and time allotted to carrying out these solutions. By using this approach a meaningful
consultants, reviews the tasks if there is no money to pay for the technical maintenace budget can be established, not only for
skills needed. the first year but throughout the life of the
changing role of It is easy for the inexperienced to under-estimate equipment.
maintenance when the amount of work and the skills involved in It is important to understand that the amount and
maintaining electronic equipment. There is a strong frequency of maintenance activity is related to the
companies switch to Just in temptation to believe that existing staff, perhaps nature of the equipment and the environment in
Time manufacturing electricians, should be able to cope. This leads to which it has to work. Extremes of temperature, dust
insufficient time and funds being allocated to carry and other contaminants can greatly reduce the time
out essential maintenance, a situation that leads to between maintenance periods. With existing equip-
ince the introduction of modern semi increased down-time and disruption to production ment all maintenance schedules and budgets should

S conductor devices, process control and


electronic controlled production equip-
ments have become very complex It is now
possible for one machine to handle many products by
re-programming. The technologies developed to
schedules. To avoid this a life cycle cost analysis
should be carried out before buying new equipment
to determine the true cost of ownership. This analysis
should include the purchase price of the equipment,
interest if applicable, training of operators and
be carefully examined to ensure that equipment
availability is in line with the new requirements
imposed by JIT manufacturing. Remember, there will
be only the minimum of finished product in stores to
buffer lost production.
enable these advanced electronic systems to be maintenance staff and running costs for the Careful planning is the key to successful
produced have brought about much greater reliabiity. anticipated useful life of the equipment. Running maintenance. If the expertise in this specialised area
Even so, maintenance is still an important element if costs should include spares holdings, consumables is not available to you in-house, then it should be
production is not to be interrupted by unnecessary and the cost of special skills. Other considerations sought from an outside source, as the penalities for
stoppages due to breakdowns. may be the cost of air conditioning or special clean getting it wrong can at best be expensive but may
More companies are seeing the cost advantages areas, as is often the case with large computer well be serious enough to have long term effects.
of the Just in Time manufacturing philosophy, but as installations, and inflation over the projected period. For those who are about to embark on JIT
with all good things there are pitfalls. Contracts to In order to calculate the maintenance budget a manufacturing, this short article should raise
supply goods frequently have penalty clauses for late fundamental decision has to be made. Is the questions that would have otherwise been overlooked
delivery and where profit margins are low, due to maintenance to be put out to contract, carried out and for those who have already taken the plunge
competition from home and abroad, Just too Late can in-house by suitably qualified personnel or a without addressing this important area, I hope it is
be disastrous in financial terms. combination of both. This is perhaps the most 'Just in Time' and not, 'Just too Late'. H

MANUFACTURING ENGINEER 55 MAY 1989