Professional Documents
Culture Documents
Client Information: Free Bid Proposal Template
Client Information: Free Bid Proposal Template
Address
6743 Elmside Crossing, 96273 Hollow Ridge Street
Jackson, Mississippi, 39210
United States
Phone Number
+6 (89) 322-9443
Email
schwaang@example.com
Contractor Information
Name
Erina Garrigan
Address
6743 Elmside Crossing, 96273 Hollow Ridge Street
Jackson, Mississippi, 39210
United States
Phone Number
+6 (89) 322-9443
Email
schwaang@example.com
1
Create your own automated PDFs with JotForm PDF Editor
Free
Bid
Proposal
Template
Job Information
Job Name
Donec odio justo, sollicitudin ut, suscipit a, feugiat et, eros. Vestibulum ac est lacinia nisi venenatis tristique.
Job Number:
Donec odio justo, sollicitudin ut, suscipit a, feugiat et, eros. Vestibulum ac est lacinia nisi venenatis tristique.
Project Description
This bid proposal project is made by Sun Construction whose contact number is (6) (89) 3229443 to offer
construction service to Erina Garrigan, owner of Flavors Restaurant with contact number (6) (89) 3229443.
Sun Construction is a licensed general contractor in Singapore with license number Donec odio justo,
sollicitudin ut, suscipit a, feugiat et, eros. Vestibulum ac est lacinia nisi venenatis tristique. offers to provide
construction services particularly replacement of kitchen tiles in Archie Smith's Restaurant.
Scope of Work
- Planning on tiles layout in the area.
- Assistance in moving kitchen appliances and securing other materials before starting the work.
Estimated Cost
The estimated cost for this contract is $678 for the material and labor. Any changes or modi cations that will
adjust the cost of this project should be done in writing and agreed by both parties.
2
Create your own automated PDFs with JotForm PDF Editor
Free
Bid
Proposal
Template
Terms
- Sun Construction will provide and pay for all labor and materials, including tools, construction equipment,
machinery, transportation and all other services and materials required to nish the work. Sun Construction will
also provide skilled and competent personnel suitable to perform the work and should maintain discipline and
order at the Property.
- Sun Construction will take precautions for the safety of its employees and the public at the Property. Sun
Construction will take full responsibility for the acts, negligence, or omissions of its employees.
- Any issues arise and caused by defective materials or equipments that were used, contractor shall redo or
repair it. This is valid for the period of 10 years after the completion of the project.
Signature Signature
3
Create your own automated PDFs with JotForm PDF Editor