Total process time: 11.

584

11.584/1.35

167

11.58/1.67

6.93-less than machine time- quality has been ruined.

Process flow diagram.

Machine running time more than cycle time.

When capacity increases run time increases machine time increases

Unpack and visually


inspect purchased
Rough mill bearing Finish mill bearing
casting
surface surface

Mill face
Mill keyway
Drill eight holes

Finish grind
Final inspection
bearing surface
and pack