Professional Documents
Culture Documents
Au5000 Web Handbook Iss 12
Au5000 Web Handbook Iss 12
ATOMISER
Operator's Handbook
and
Parts Catalogue
5.0 OPERATION....................................................................................... 10
5.1 General Comments .................................................................... 10
5.2 Daily Inspection .......................................................................... 10
5.3 Calibration Procedure................................................................. 10
5.4 Operating Technique .................................................................. 11
5.4.1 Low Volume (LV) Spraying ............................................. 11
5.4.2 Ultra Low Volume (ULV) Spraying .................................. 11
5.5 Observation in Flight................................................................... 11
2.0 SPECIFICATION
Weight: 1.8 Kg (4 lb) complete with mounting bracket
Flow rate: 0 – 23 litres/min (0 – 6 USG/min) per atomiser [1]
Flow control: By Micronair variable restrictor unit.
Chemical shut-off: By diaphragm check valve and secondary shut-off
in atomiser
Spray droplet size: Variable between 60 – 750 microns VMD [2]
Rotational speed: Variable between 2,000 – 10,000 (max) RPM
Operating airspeed: 90 – 150 MPH (145 – 240 Km/hr) with EX1772/2 blades [3]
50 – 100 MPH (80 – 160 Km/hr) with EX2021 blades [4]
150 – 200 MPH (240 – 320 Km/hr) with EX6353 blades [5]
Mounting: By lightweight mounting clamp – available for all
popular boom sections
Chemical feed: From 1/8" or 1/4" NPT tapped boom outlet holes [6]
NOTES:
1. Maximum flow rate for efficient atomisation will depend upon fluid properties.
Data shown here is for water.
2. Droplet size at a given atomiser speed will depend upon the formulation used.
The size will be reduced with ULV formulations.
3. EX1772/2 blades supplied as standard.
4. EX2021 blades supplied only when specified for slow aircraft.
5. EX6353 blades supplied only when specified for fast aircraft.
6. Alternative fittings may be supplied with some installation kits if necessary.
4.0 INSTALLATION
Micronair AU5000 atomisers are suitable for use on a wide range of aircraft types and
additional instructions are supplied with installation kits where applicable.
The atomisers are either installed on the existing spray booms or are mounted on
special Micronair booms that are then fitted in place of the original booms. In either
case, the procedure for fitting the atomisers is as follows:
1. Inspect the spray booms, support brackets and attachments to the aircraft.
These must all be in good condition and free of any cracks, leaks or corrosion.
Replace any defective parts before installing the atomisers.
7. Either close the unused VRU inlet pipe with the appropriate cap nut (EX1670 for
the 1/8" thread or EX1671 for the 1/4" thread) or use this inlet as a second feed
from the boom. The second feed should be used if the flow rate through each
atomiser is likely to exceed 7 litres/min (1.8 USG/min). See Fig. 1 for details of
the installation of this additional feed.
CLAMP EX1783
FOR SMALL
MICRONAIR BOOM
CLAMP EX1783
FOR THRUSH, AIR
TRACTOR, SIMPLEX
& SIMILAR BOOMS
CLAMP EX1943
FOR LARGE
MICRONAIR BOOM
CLAMP EX5298
FOR AIR TRACTOR
HIGH VOLUME BOOM
5.0 OPERATION
As with all spraying equipment, optimum results will only be obtained with AU5000
Atomisers if they are correctly calibrated, operated and maintained. The role of the pilot
in this is vital. Not only is he in the best position to monitor the performance of the
equipment but the effectiveness and safety of the operation are in his hands.
It is important that every pilot who uses the equipment is completely familiar with its
operation, calibration and use. It is therefore recommended that all pilots read this
Handbook thoroughly before commencing operations. The following sections
emphasise points of particular importance.
85 1.7 1.9 2.2 2.5 2.8 4.2 5.6 7.0 10.6 14.1
90 1.8 2.1 2.4 2.7 3.0 4.5 6.0 7.5 11.3 15.0
95 1.9 2.2 2.5 2.8 3.1 4.8 6.3 7.9 11.8 15.8
100 2.0 2.3 2.6 3.0 3.3 5.0 6.6 8.3 12.5 16.6
110 2.2 2.5 2.9 3.3 3.6 5.5 7.3 9.1 13.8 18.3
120 2.4 2.8 3.2 3.6 4.0 6.0 8.0 10.0 15.0 20.0
130 2.6 3.0 3.4 3.9 4.3 6.5 8.6 10.8 16.3 21.6
140 2.8 3.2 3.7 4.2 4.6 7.0 9.3 11.6 17.5 23.3
150 3.0 3.5 4.0 4.5 5.0 7.5 9.3 12.5 18.8 25.0
160 3.2 3.7 4.2 4.8 5.3 8.0 10.6 13.3 20.0 26.6
170 3.4 3.9 4.5 5.1 5.6 8.5 11.3 14.1 21.3 28.3
75 4.5 5.2 6.0 6.7 7.5 11.2 15.0 30.0 45.0 75.0
80 4.8 5.6 6.4 7.2 8.0 12.0 16.0 32.0 48.0 80.0
85 5.1 5.9 6.8 7.6 8.5 12.7 17.0 34.0 51.0 85.0
90 5.4 6.3 7.2 8.1 9.0 13.5 18.0 36.0 54.0 90.0
95 5.7 6.6 7.6 8.5 9.5 14.2 19.0 38.0 57.0 95.0
100 6.0 7.0 8.0 9.0 10.0 15.0 20.0 40.0 60.0 100.0
110 6.6 7.7 8.8 9.9 11.0 16.5 22.0 44.0 66.0 110.0
120 7.2 8.4 9.6 10.8 12.0 18.0 24.0 48.0 72.0 120.0
130 7.8 9.1 10.4 11.7 13.0 19.5 26.0 52.0 78.0 130.0
140 8.4 9.8 11.2 12.6 14.0 21.0 28.0 56.0 84.0 140.0
150 9.0 10.5 12.0 13.5 15.0 22.5 30.0 60.0 90.0 150.0
The above figures are based on tests with water. Actual flow rates will vary
according to the installation and chemical used. Operators should always
check flow rates under field conditions.
Table 3 – Flow from VRU Fitted with Standard Odd Numbered Plate
The above figures are based on tests with water. Actual flow rates will vary
according to the installation and chemical used. Operators should always
check flow rates under field conditions.
Table 4 – Flow from VRU Fitted with Optional Even Numbered Plate
16
14
20 PSI BOOM PRESSURE
FLOW - LITRES/MINUTE
0
1 3 5 7 9 11 13
VRU SETTING
Graph 1 – Flow from VRU Fitted with Standard Odd Numbered Plate
25
20
40 PSI BOOM PRESSURE
15
10
0
2 4 6 8 10 12 14
VRU SETTING
Graph 2 – Flow from VRU Fitted with Optional Even Numbered Plate
Graph 4 – Relationship Between Atomiser RPM and Airspeed for Standard EX1772/2
Fan Blades
Graph 5 – Relationship Between Atomiser RPM and Airspeed for Optional EX2021
Long Fan Blades
Graph 6 – Relationship Between Atomiser RPM and Airspeed for Optional Short
EX6353 Fan Blades
IMPORTANT: The clamp ring bolts must not be over-tightened. This could
cause serious stresses in the roots of the blades and could lead to cracking
and blade failure.
7.4.2 Fan Blades for Slow Flying Aircraft (50 – 100 MPH)
In order to achieve the required rotational speed at lower airspeeds, it is necessary to
use the longer EX2021 fan blades. These are 127 mm (5.0 inches) long, as measured
from the atomiser hub to the blade tip (see Fig. 6). EX2021 fan blades are intended for
airspeeds of between 50 – 100 MPH (80 – 160 Km/hr).
EX2021 fan blades are only supplied with installation kits if the kit is specifically
intended for a suitable aircraft or if the blade type is specified at time of ordering.
However, EX2021 blades are interchangeable with the EX1772/2 type and can be
retrofitted at a later date.
7.4.3 Fan Blades for High Speed Aircraft (150 – 200 MPH)
These shorter blades are designed for use on high speed aircraft, including turbine
powered agricultural types. EX6353 fan blades are 70mm (2.75 inches) long, as
measured from atomiser hub to fan blade tip (see Fig. 6). EX6353 fan blades are
intended for use at airspeeds of 150 – 200 MPH (240 – 320 Km/hr). These blades are
also fully interchangeable with the standard EX1772/2 blades.
8.4.2 V-ring
NOTE: The V-ring is easier to install with a special tool available from Micron Sprayers
Limited, part number EX1796.
1. Push the V-ring over the shaft of the tool with the lip facing away from the end.
2. Locate the tool over the V-ring seat inside the drive tube.
3. Push firmly down on the outer sleeve of the tool so as to force the ring on to its
seat.
If the installation tool is not available, the V ring may be eased onto its seat with a
screwdriver, taking care not to damage the rubber lip of the seal.
8.4.3 Gauze
Reverse the dismantling procedure, ensuring that the deflector end cap assembly is left
off until the spindle is installed.
8.4.4 Blades
1. Replace all blades in their sockets and fit the clamp ring after checking that the
numbers on the hub and clamp ring match. Check that the arrow on the ring
aligns with the arrow on the hub. This ensures that the atomiser will be correctly
balanced. Note that a locating pin on the hub will align with a hole in the clamp
ring in this position.
2. Fit the three bolts and washers and tighten evenly just to trap the blades.
3. Adjust all three blades to the correct angle.
IMPORTANT: The clamp ring bolts must be tightened evenly and must
not be over-tightened. Over-tightening can damage the blades and
cause in-flight failure.
8.4.5 Spindle
Reverse the dismantling procedure, making sure that the end cap of the gauze
(together with the deflector assembly) is replaced.
8.5 Balance
Both the hub assembly and the gauze of all Micronair atomisers are dynamically
balanced. This ensures that the atomiser will run smoothly and without vibration, which
might otherwise cause damage to the unit or its mounting. As the hub and gauze are
individually balanced, any gauze may be fitted to any atomiser. It is, however, vitally
important that the hub is correctly assembled with its original clamp ring.
As an additional precaution, a moulded rubber shock bush assembly is fitted in the
atomiser mounting clamp. This is designed to absorb any vibration caused by an
exceptional condition until the aircraft can be landed and the problem rectified. The
shock bush is NOT intended to absorb vibration from a damaged or wrongly assembled
atomiser for a prolonged period.
Any attempt to modify or repair either the atomiser or gauze is liable to cause it to run
out of balance. No such repairs should be attempted unless full dynamic balancing
facilities are available. Full balancing instructions are available to organisations
equipped to handle this work.
Should any unusual vibration be noticed in flight, the atomisers must be inspected as
soon as possible and any defective parts replaced immediately with genuine Micronair
Vibration can also be caused by worn bearings, a build-up of dried chemical in the
gauze or broken fan blades. These problems should not occur if the equipment is
properly flushed out, cleaned and maintained. Operators and pilots must be made
aware of the importance of regular inspection of the atomisers to prevent the above
problems.
IMPORTANT: The flow must always enter the side of the VRU. This forces the
selector plate against the orifice plate. Should the VRU be incorrectly installed
with the chemical entering the end, the plates would be forced apart and an
erratic flow would result.
9.3 Maintenance
Each VRU should be checked and cleaned periodically. Should it be necessary to
dismantle the unit, the procedure is as follows:
1. Remove the VRU by disconnecting the outlet hose and unscrewing the unit from
the boom.
2. Remove the red knob by unscrewing the 10-32 nut in the centre. Ensure that the
washers on either side of the knob cap are not lost.
3. Using a spanner, unscrew the outlet fitting of the VRU. If this is tight, the body
must be held by two locating holes under the knob at the opposite end to the
outlet. A special key, part number EX1942, is available from Micronair to assist
in dismantling the VRU.
IMPORTANT: Do not clamp the VRU by its body or inlet pipes as these
may be permanently damaged.
4. Remove the orifice plate from the body and slide out the selector plate assembly
and spring.
5. The shaft is sealed by a gland packing that is retained by a brass ring at the end
of the body. This should not be disturbed unless the gland requires replacing. If
replacement is necessary, the brass ring should be unscrewed and the old
packing eased out of its seat.
Before re-assembly, all parts must be thoroughly cleaned. Particular attention must be
given to the faces of the orifice and selector plates, the selector shaft and the indexing
grooves inside the knob. Check that all are clean and correctly located.
The assembly procedure is as follows:
1. If the gland packing has been removed: fit a new packing into the seat in the
body and screw down the retaining ring so that it just touches the packing. DO
NOT TIGHTEN AT THIS STAGE.
10.2 Maintenance
Because of its simple construction, the diaphragm check valve requires very little
maintenance. The diaphragm, however, should be checked periodically and replaced if
it shows any signs of wear or deterioration.
IMPORTANT: The diaphragm is made from either reinforced Viton or PTFE. It must
only be replaced with the appropriate Micronair spare part (CBP487 – Viton or EX2762
– PTFE).
Should it be necessary to dismantle the unit completely, the procedure is as follows:
1. Cut all locking wire and remove the check valve from the atomiser spindle and
feedpipe.
2. Unscrew the cap retaining ring and remove the ring, cap and diaphragm.
11.1 Installation
IMPORTANT: The CBP2286 screws are shorter than the EX2612 screws
used to attach the original gauze. The original longer screws must not,
therefore, be used.
5. Fit the new end cap assembly EX5214 to the gauze using the original EX2612
screws and SP123-C washers.
6. Inspect the installation, ensuring that the gauze, deflector plate and end cap are
all securely seated and that all screws are tight.
11.2 Calibration
The dimensions of the air deflector and gauze have been chosen to provide a droplet
size (VMD) substantially the same as a standard unmodified AU5000 atomiser under
the same operating conditions. It should not, therefore, be necessary to change the
atomiser rotational speed to produce the same droplet size as produced by the
unmodified atomiser. However, the atomiser blade angle should be adjusted if it is
found necessary to produce larger or smaller droplets. In this case, the calibration
procedure for the atomisers fitted with the air deflector assembly remains exactly as
described in sections 7.3 and 7.4.
Part No Description
Every care has been taken in the design of this equipment and the preparation of this
Handbook. However, Micron Sprayers Limited cannot accept responsibility for errors or
the consequences thereof. The user must satisfy himself that the equipment is suited
to his needs, is performing according to his requirements and that all statutory
requirements and airworthiness regulations are being complied with.
Notes: