VILLAGES WATER SUPPLY SYSTEM, INC.

Blk 08, Lot 14, Phase IV, Mansfield Residences, Angeles City

Project: Sta. Barbara -VWSSI


Location: Brgy. Minien West, Pangasinan Date: 02/12/2019

JOB REQUEST
SCOPE OF WORK LABOR COST

REPAIR OF ____________________________ CONTRACT RTD Machine Shop & Services


238 Malino City of San Fernando,
Pampanga
MAINTENANCE OF :
ADMINISTRATION
OTHERS (SPECIFY) :

* Threading of Riser Pipe for maintenace of Sta.


Barbara Suction Pipe.(8 x 3" pipes x 2 threading per
pipe = 16 threading for 3")
16 threading for 3" x 400 = 6400Php

TOTAL LABOR COST: P 6,400.00

BILL OF MATERIALS
QTY UNIT ITEMS/MATERIALS UNIT COST SUB-TOTAL
0.00
***Nothing Follows*** 0.00
0.00
TOTAL MATERIALS COST: P 0.00

TOTAL COST P 6,400.00

Certified included in the


Prepared by: Checked by: Recommending Approval: Approved by:
Budget/CapEx

Engr. Johnlerie E. Esguerra Engr. Louie G. Serrano Mr. Rommel S. Ocampo Engr. Roberto V. Suarez Engr. Edwin R. Reyes
Cadet Engineer Electro-Mechanical Engineer Admin/-Finance Officer Vice-President for Technical Opr. Chief Executive Officer
Villages Water Supply System Inc.
│ Block 8 Lot 14 Phase 4 Mansfield Residences, Fil-Am Friendship Hi-way
Barangay Sto. Domingo,  Angeles City, 2009 Pampanga
│ Telefax No.: (045) 435-6513 │ Email: vwssi.corporate@gmail.com

REQUEST FOR PAYMENT

DATE PAYEE PROJECT PARTICULARS CHARGE TO AMOUNT

TOTAL: PHP -

TERMS OF PAYMENT:

Prepared by: Recommending Approval:

Engr. Roy Angelo A. Pineda Engr. Roberto V. Suarez


Cadet Engineer Vice-President for Technical Opr.

Checked by: Approved by:

Engr. Ednor M. Lansangan Engr. Edwin R. Reyes


Acting-Technical Officer Chief Executive Officer