TOTAL QUANTITY, FOUNDATION Effluent Water Injection Phase 1 and Sea Water Injection Phase 2, PI-08001
CONCRETE QTY (M^3) REBAR BLINDING CONCRETE ANCHR BOLT ANCHOR BOLT NON-SHRINK GROUT EPOXY GROUT EXCV. (0 - 1.5 m) EXCV. (1.5 - 3.0 m) B/F POLY SHEET BITUMINOUS PAINT INSERT PL
0 to 3 3 to 10 10 to 50 > 50 TON M3 NUMB. KG M3 M3 M3 M3 M3 M2 M2 TON
Vertical Vessel 2.75 0.00 240.95 157.51 52.16 22.55 204 2612.52 1.15 0.00 699.01 304.95 1349.15 771.94
Heat Exchanger 0.00 0.00 0.00 2628.96 131.45 90.23 70 387.20 0.00 32.08 4511.35 2668.48 2148.14 343.60
Tank 0.00 0.00 0.00 520.66 62.48 29.74 875 13125.00 624.46 148.24 2662.41 2024.36
Rotating& Package Eqpt 0.00 16.56 5569.05 2006.48 379.60 215.55 1193 6562.05 0.00 30.35 6635.27 33.15 761.01 9231.62 4920.70
Piperack
Tech Str
Pipesupports+Misc strs
Analyser Foundation 9.00 0.00 0.00 0.00 0.45 2.07 0 0.00 0.00 0.00 10.35 2.28 55.40 14.00
TOTAL 11.75 79.63 5971.11 5443.75 672.20 382.26 2775 25467.40 2.64 62.43 13166.53 33.15 4305.24 16150.43 8557.00 0.00
Vertical Vessel 0.00 8.05 171.51 0.00 23.34 11.83 138 1225.40 0.96 0.00 366.63 202.01 477.84 280.43
Heat Exchanger
Tank 0.00 0.00 0.00 270.96 32.52 14.14 475 7125.00 296.88 66.31 1366.59 1060.29
Rotating& Package Eqpt 0.00 0.00 504.18 0.00 25.21 16.20 124 681.45 0.00 4.37 458.53 73.10 789.80 465.75
Piperack
Tech Str
Pipesupports+Misc strs
Analyser Foundation 0.90 0.00 0.00 0.00 0.05 0.21 0 0.00 0.00 0.00 1.04 0.23 5.54 1.40
TOTAL 0.90 8.05 688.17 270.96 82.73 42.94 745 9083.34 3.75 4.37 1140.75 0.00 351.79 2658.79 1821.19 0.00
04/29/202006:20:23 12
473081101.xls Summary
CONCRETE QTY (M^3) REBAR BLINDING CONCRETE ANCHR BOLT ANCHOR BOLT NON-SHRINK GROUT EPOXY GROUT EXCV. (0 - 1.5 m) EXCV. (1.5 - 3.0 m) B/F POLY SHEET BITUMINOUS PAINT INSERT PL
0 to 3 3 to 10 10 to 50 > 50 TON M3 NUMB. KG M3 M3 M3 M3 M3 M2 M2 TON
Pipesleeper INCORPORATED IN UNDERGROUND QBDM
Vertical Vessel 0.00 6.68 95.14 0.00 13.24 6.45 96 383.54 0.69 0.00 200.09 109.69 274.29 166.36
Heat Exchanger
Tank 0.00 0.00 0.00 139.09 16.69 7.26 245 3675.00 152.40 34.02 701.52 544.28
Rotating& Package Eqpt 0.00 0.00 561.50 0.00 28.08 17.64 131 719.40 0.00 4.88 507.95 77.11 844.95 492.15
Piperack
Tech Str
Pipesupports+Misc strs
Analyser Foundation 0.90 0.00 0.00 0.00 0.05 0.21 0 0.00 0.00 0.00 1.04 0.23 5.54 1.40
TOTAL 0.90 6.68 669.12 139.09 59.67 32.13 480 4829.43 6.06 4.88 879.15 0.00 231.19 1845.32 1217.51 0.00
Vertical Vessel 0.00 6.68 95.14 0.00 13.24 6.45 96 383.54 0.69 0.00 200.09 109.69 274.29 166.36
Heat Exchanger
Tank 0.00 0.00 0.00 139.09 16.69 7.26 245 3675.00 152.40 34.02 701.52 544.28
Rotating& Package Eqpt 0.00 18.24 508.62 0.00 26.34 16.73 133 731.50 0.00 4.45 479.71 75.76 817.73 483.15
Piperack
Tech Str 0
Pipesupports+Misc strs
Analyser Foundation 0.90 0.00 0.00 0.00 0.05 0.21 0 0.00 0.00 0.00 1.04 0.23 5.54 1.40
TOTAL 0.90 24.92 616.24 139.09 57.94 31.22 482 4841.53 11.37 4.45 850.91 0.00 229.84 1818.10 1208.51 0.00
04/29/202006:20:23 12
473081101.xls Summary
CONCRETE QTY (M^3) REBAR BLINDING CONCRETE ANCHR BOLT ANCHOR BOLT NON-SHRINK GROUT EPOXY GROUT EXCV. (0 - 1.5 m) EXCV. (1.5 - 3.0 m) B/F POLY SHEET BITUMINOUS PAINT INSERT PL
0 to 3 3 to 10 10 to 50 > 50 TON M3 NUMB. KG M3 M3 M3 M3 M3 M2 M2 TON
0
Horizontal Vessel 0.00 0.00 0.00 50.69 6.59 2.81 8 51.49 20.85 0.00 87.08 41.50 72.57 44.48
Vertical Vessel 0.00 4.35 0.00 0.00 0.57 0.39 12 47.94 0.04 0.00 11.98 7.92 19.08 12.59
Heat Exchanger
Tank
Rotating& Package Eqpt 0.00 0.00 0.00 152.94 7.65 4.21 17 95.15 0.00 1.68 130.48 11.57 159.48 75.30
Piperack
Tech Str
Pipesupports+Misc strs
Analyser Foundation
TOTAL 0.00 4.35 0.00 203.63 14.80 7.40 37 194.59 20.89 1.68 229.54 0.00 60.98 251.13 132.37 0.00
GRAND TOTAL 14.45 123.63 7944.63 6196.54 887.35 495.95 4519 44416.28 44.72 77.81 16266.87 33.15 5179.04 22723.77 12936.58 0.00
04/29/202006:20:23 12
HORIZONTAL VESSELS FOUNDATIONS PRINT ON: 29/Apr
Project : Effluent Water Injection Phase 1 and Sea Water Injection Phase 2 PREPARED ON: 4-Feb-08
Project Code: PI-08001 REV: 0.0
Eqp. Eqp EQP EQP EQP EQP EQP FOUNDATION SIZE CHECK TOTAL Reinforced Concrete Foundation 30 N/mm2 REBAR LEAN ANCHR A/B put 1 Non EXCV. B/F PolyethyleneBituminous
FOOTING PEDESTAL
No. Tag Description Nos SUPP. MAX MIN if shrink epoxy Sheet Paint
No. DIAM LGTH HGHT WT WT L W THK L W DPT CALCULATIONS STRESS. RESULT CONCR 0-3 3-10 10-50 >50 STEEL CONCR BOLT WT epoxy grout grout
Nos M M M TON TON M M M M M M Nm/A Nmi/A Mw/Z Mseis/Z FSSL FSOT MAX MIN M3 M3 M3 M3 M3 TON M3 NUMB. KG M3 M3 M3 M3 M2 M2
SUB-TOTAL 354 0 63 161 130 46 22 432 2781 0 1.48 0 686 420 704 482
GATHERING CENTRE 15(GC - 15)
PRESSURE VESSELS ( Note.1)
18 V-1301 RECOVERED OIL TANK 1 2.00 6.00 0.25 25.9 7.1 3.50 1.20 0.50 2.30 0.60 3.0 6.7 4.4 2.2 4.3 7.9 2.9 10.9 0.1 OK 12.5 0.0 0.0 12.5 0.0 1.6 0.6 8 51 0.07 0.0 17.7 10.1 19.0 13.3
SUB-TOTAL 12 0 0 12 0 2 1 8 51 0 2.79 0 18 10 19 13
GATHERING CENTRE 23(GC - 23)
PRESSURE VESSELS ( Note.1)
19 V-1301 RECOVERED OIL TANK 1 2.00 6.00 0.25 25.9 7.1 3.50 1.20 0.50 2.30 0.60 3.0 6.7 4.4 2.2 4.3 7.9 2.9 10.9 0.1 OK 12.5 0.0 0.0 12.5 0.0 1.6 0.6 8 51 0.1 0.0 17.7 10.1 19.0 13.3
SUB-TOTAL 12 0 0 12 0 2 1 8 51 0 5.38 0 18 10 19 13
GATHERING CENTRE 25(GC - 25)
PRESSURE VESSELS ( Note.1)
20 V-1301 RECOVERED OIL TANK 1 2.00 6.00 0.25 25.9 7.1 3.50 1.20 0.50 2.30 0.60 3.0 6.7 4.4 2.2 4.3 7.9 2.9 10.9 0.1 OK 12.5 0.0 0.0 12.5 0.0 1.6 0.6 8 51 0.1 0.0 17.7 10.1 19.0 13.3
SUB-TOTAL 12 0 0 12 0 2 1 8 51 0 10.69 0 18 10 19 13
SEA WATER TREATMENT PLANT(SWTP)
21 L-1001 FEED FILTER 1 3.00 15.00 0.25 131.0 25.0 5.00 5.00 0.80 3.30 0.60 2.7 5.1 2.9 1.1 2.8 9.2 11.7 7.9 0.1 OK 50.7 0.0 0.0 0.0 50.7 6.6 2.8 8 51 0.1 0.0 87.1 41.5 72.6 44.5
SUB-TOTAL 51 0 0 0 51 7 3 8 51 0 20.85 0 87 41 73 44
BASIS TOTAL 442 0 63 199 181 58 27 464 2987 0 41 0 826 492 833 567
1 THICKNESS OF LEAN CONCRETE (M)= 0.05
2 REBAR STEEL @ 0.13 TON/M3 0.13 * Anchor bolts assumed to be cast in pockets of size 200x200x500 deep, for pre embedded bolts for rotating eqpt
3 FDN. DEPTH FROM GRADE 1.5 write "1" in the shaded block above between A/B and grout if it is epoxy grout
4 SOIL B. CAPACITY(TON/M2)= 20.0
5 J15, 48mm DIA A/BOLT WT/ BOLT (KG)= 16.5
6 FOUNDATION PROJECTION ABOVE GROUND(m) 2.0
6a FOUNDATION PROJECTION ABOVE GROUND(m) (for D-2301) 1.0
7 EPOXY GROUT THICKNESS (MM) 50.0
8 NON-SHRINK GROUT THICKNESS (MM) 25.0
9 Friction co-eff. For concrete to soil= 0.30
10 Seismic design coefficient to be used (Cd used) 0.170
VERTICAL VESSELS FOUNDATIONS PRINT ON: 29/Apr
Project : Effluent Water Injection Phase 1 and Sea Water Injection Phase 2 PREPARED ON: 4-Feb-08
Project Code: PI-08001 REV: 0.0
UNIT Eqp. Eqp EQP EQP EQP EQP EQP FOOTING PEDESTAL FOUNDATION SIZE CHECK TOTAL Reinforced Concrete Foundation 30 N/mm2 REBAR LEAN ANCHR A/B put 1 Non EXCV. EXCV. B/F Polyethylene Bituminous
CODE Tag Description Nos SKIRT MAX MIN if shrink epoxy up to 1.5 >1.5m Sheet Paint
No. DIAM LGTH HGHT WT WT L W THK L W DPT CALCULATIONS STRESS. RESULT CONCR 0-3 3-10 10-50 >50 STEEL CONCR BOLT WT epoxy grout grout
Nos M M M TON TON M M M M M M Nm/A Nmi/A Mw/Z Mseis/Z FSSL FSOT MAX MIN M3 M3 M3 M3 M3 TON M3 NUMB. KG M3 M3 M3 M3
SUB-TOTAL 401.2 2.7 0.0 241.0 157.5 52.2 22.5 204.0 2612.5 0.0 1.2 0.0 699.0 0.0 305.0 1349.1 771.9
GATHERING CENTRE 15(GC - 15)
PRESSURE VESSELS ( Note.1)
11 C-1003 WET CRUDE STORAGE TANK DEGASSING BOOT 1 2.50 11.96 2.00 74.21 15.5 7.6 7.6 0.70 2.90 2.90 1.10 4.0 2.8 0.9 2.8 12.6 20.6 6.8 0.05 OK 41.1 0.0 0.0 41.1 0.0 5.3 3.1 18 297 0.10 0.0 96.2 54.5 120.3 68.7
12 V-1302 A/B RECOVERED OIL TANK PUMP BOOTS 2 0.76 2.96 1.50 4.45 3.1 3.0 3.0 0.30 1.20 1.20 1.50 2.2 2.0 0.8 1.3 13.6 20.8 3.5 0.66 OK 8.0 0.0 8.0 0.0 0.0 1.0 1.1 24 96 0.06 0.0 33.4 25.1 47.6 29.6
GRP Tanks / Vessels ( Note.1)
13 D-1701 BIOCIDE’A’ STORAGE TANK for GC 15 1 2.90 3.33 2.00 24.70 2.7 4.3 4.3 0.30 3.30 3.30 1.50 5.0 3.6 0.6 2.8 14.4 29.7 7.9 0.77 OK 18.1 0.0 0.0 18.1 0.0 2.4 1.0 12 48 0.11 0.0 32.5 16.6 42.9 25.4
14 D-1702 BIOCIOE’B’ STORAGE TANK for GC 15 1 2.90 3.33 2.00 24.70 2.7 4.3 4.3 0.30 3.30 3.30 1.50 5.0 3.6 0.6 2.8 14.4 29.7 7.9 0.77 OK 18.1 0.0 0.0 18.1 0.0 2.4 1.0 12 48 0.11 0.0 32.5 16.6 42.9 25.4
15 D-1703 DEMULSlFIER STORAGE TANK for GC 15 1 3.00 3.44 2.00 27.32 3.0 4.4 4.4 0.30 3.40 3.40 1.50 5.2 3.7 0.6 3.0 14.3 29.8 8.1 0.69 OK 19.2 0.0 0.0 19.2 0.0 2.5 1.1 12 48 0.12 0.0 33.9 17.2 44.4 26.1
16 D-1704 CORROSION INHIBITOR STORAGE TANK for GC 15 1 3.40 3.78 2.00 37.82 3.5 5.0 5.0 0.30 3.80 3.80 1.50 5.2 3.5 0.6 2.9 15.3 34.5 8.1 0.67 OK 24.1 0.0 0.0 24.1 0.0 3.1 1.4 18 297 0.13 0.0 43.2 22.0 54.1 30.8
17 D-1705 SCALE INHIBITOR STORAGE TANK for GC 15 1 3.40 3.78 2.00 37.82 3.5 5.0 5.0 0.30 3.80 3.80 1.50 5.2 3.5 0.6 2.9 15.3 34.5 8.1 0.67 OK 24.1 0.0 0.0 24.1 0.0 3.1 1.4 18 297 0.13 0.0 43.2 22.0 54.1 30.8
18 D-1706 OXYGEN SCAVENGER STORAGE TANK for GC 15 1 2.30 2.56 2.00 12.64 2.0 3.7 3.7 0.30 2.70 2.70 1.50 4.3 3.4 0.6 2.1 15.7 31.4 6.4 1.24 OK 12.5 0.0 0.0 12.5 0.0 1.6 0.8 12 48 0.09 0.0 24.6 13.5 34.4 21.1
19 D-1707 REVERSE DEMULSIFIER STORAGE TANK for GC 15 1 2.50 2.78 2.00 15.85 2.2 3.9 3.9 0.30 2.90 2.90 1.50 4.5 3.4 0.6 2.3 15.3 31.3 6.9 1.13 OK 14.2 0.0 0.0 14.2 0.0 1.8 0.9 12 48 0.10 0.0 27.1 14.5
37.2 22.6
SUB-TOTAL 179.6 0.0 8.0 171.5 0.0 23.3 11.8 138.0 1225.4 0.0 1.0 0.0 366.6 0.0 202.0 477.8 280.4
GATHERING CENTRE 23(GC - 23)
PRESSURE VESSELS ( Note.1)
20 V-1302 A/B RECOVERED OIL TANK PUMP BOOTS 2 0.76 2.96 1.50 4.45 3.1 2.5 2.5 0.30 1.20 1.20 1.50 2.7 2.5 1.4 2.3 10.2 12.9 5.0 0.19 OK 6.7 0.0 6.7 0.0 0.0 0.9 0.8 24 96 0.06 0.0 24.0 17.4 36.9 23.9
GRP Tanks / Vessels ( Note.1)
21 D-1701 BIOCIDE’A’ STORAGE TANK for GC 23 1 2.90 3.33 2.00 24.70 2.7 4.3 4.3 0.30 3.30 3.30 1.50 5.0 3.6 0.6 2.8 14.4 29.7 7.9 0.77 OK 18.1 0.0 0.0 18.1 0.0 2.4 1.0 12 48 0.11 0.0 32.5 16.6 42.9 25.4
22 D-1702 BIOCIOE’B’ STORAGE TANK for GC 23 1 2.90 3.33 2.00 24.70 2.7 4.3 4.3 0.30 3.30 3.30 1.50 5.0 3.6 0.6 2.8 14.4 29.7 7.9 0.77 OK 18.1 0.0 0.0 18.1 0.0 2.4 1.0 12 48 0.11 0.0 32.5 16.6 42.9 25.4
23 D-1703 CORROSION INHIBITOR STORAGE TANK for GC 23 1 2.70 3.00 2.00 19.68 2.5 4.1 4.1 0.30 3.10 3.10 1.50 4.8 3.5 0.6 2.5 15.1 31.2 7.3 1.00 OK 16.1 0.0 0.0 16.1 0.0 2.1 1.0 12 48 0.11 0.0 29.7 15.5 40.0 24.0
24 D-1704 SCALE INHIBITOR STORAGE TANK for GC 23 1 2.70 3.00 2.00 19.68 2.5 4.1 4.1 0.30 3.10 3.10 1.50 4.8 3.5 0.6 2.5 15.1 31.2 7.3 1.00 OK 16.1 0.0 0.0 16.1 0.0 2.1 1.0 12 48 0.11 0.0 29.7 15.5 40.0 24.0
25 D-1705 OXYGEN SCAVENGER STORAGE TANK for GC 23 1 2.30 2.56 2.00 12.64 2.0 3.7 3.7 0.30 2.70 2.70 1.50 4.3 3.4 0.6 2.1 15.7 31.4 6.4 1.24 OK 12.5 0.0 0.0 12.5 0.0 1.6 0.8 12 48 0.09 0.0 24.6 13.5 34.4 21.1
26 D-1706 REVERSE DEMULSIFIER STORAGE TANK for GC 23 1 2.50 2.78 2.00 15.65 2.0 3.9 3.9 0.30 2.90 2.90 1.50 4.5 3.4 0.6 2.3 15.3 31.2 6.8 1.14 OK 14.2 0.0 0.0 14.2 0.0 1.8 0.9 12 48 0.10 0.0 27.1 14.5
37.2 22.6
SUB-TOTAL 101.8 0.0 6.7 95.1 0.0 13.2 6.5 96.0 383.5 0.0 0.7 0.0 200.1 0.0 109.7 274.3 166.4
GATHERING CENTRE 25(GC - 25)
PRESSURE VESSELS ( Note.1)
27 V-1302 A/B RECOVERED OIL TANK PUMP BOOTS 2 0.76 2.96 1.50 4.45 3.1 2.5 2.5 0.30 1.20 1.20 1.50 2.7 2.5 1.4 2.3 10.2 12.9 5.0 0.19 OK 6.7 0.0 6.7 0.0 0.0 0.9 0.8 24 96 0.06 0.0 24.0 17.4 36.9 23.9
GRP Tanks / Vessels ( Note.1)
28 D-1701 BIOCIDE’A’ STORAGE TANK for GC 25 1 2.90 3.33 2.00 24.70 2.7 4.3 4.3 0.30 3.30 3.30 1.50 5.0 3.6 0.6 2.8 14.4 29.7 7.9 0.77 OK 18.1 0.0 0.0 18.1 0.0 2.4 1.0 12 48 0.11 0.0 32.5 16.6 42.9 25.4
29 D-1702 BIOCIOE’B’ STORAGE TANK for GC 25 1 2.90 3.33 2.00 24.70 2.7 4.3 4.3 0.30 3.30 3.30 1.50 5.0 3.6 0.6 2.8 14.4 29.7 7.9 0.77 OK 18.1 0.0 0.0 18.1 0.0 2.4 1.0 12 48 0.11 0.0 32.5 16.6 42.9 25.4
30 D-1703 CORROSION INHIBITOR STORAGE TANK for GC 25 1 2.70 3.00 2.00 19.68 2.5 4.1 4.1 0.30 3.10 3.10 1.50 4.8 3.5 0.6 2.5 15.1 31.2 7.3 1.00 OK 16.1 0.0 0.0 16.1 0.0 2.1 1.0 12 48 0.11 0.0 29.7 15.5 40.0 24.0
31 D-1704 SCALE INHIBITOR STORAGE TANK for GC 25 1 2.70 3.00 2.00 19.68 2.5 4.1 4.1 0.30 3.10 3.10 1.50 4.8 3.5 0.6 2.5 15.1 31.2 7.3 1.00 OK 16.1 0.0 0.0 16.1 0.0 2.1 1.0 12 48 0.11 0.0 29.7 15.5 40.0 24.0
32 D-1705 OXYGEN SCAVENGER STORAGE TANK for GC 25 1 2.30 2.56 2.00 12.64 2.0 3.7 3.7 0.30 2.70 2.70 1.50 4.3 3.4 0.6 2.1 15.7 31.4 6.4 1.24 OK 12.5 0.0 0.0 12.5 0.0 1.6 0.8 12 48 0.09 0.0 24.6 13.5 34.4 21.1
33 D-1706 REVERSE DEMULSIFIER STORAGE TANK for GC 25 1 2.50 2.78 2.00 15.65 2.0 3.9 3.9 0.30 2.90 2.90 1.50 4.5 3.4 0.6 2.3 15.3 31.2 6.8 1.14 OK 14.2 0.0 0.0 14.2 0.0 1.8 0.9 12 48 0.10 0.0 27.1 14.5
37.2 22.6
SUB-TOTAL 101.8 0.0 6.7 95.1 0.0 13.2 6.5 96.0 383.5 0.0 0.7 0.0 200.1 0.0 109.7 274.3 166.4
SEA WATER TREATMENT PLANT(SWTP)
Strainer vessel
34 V-1001 Inline Strainer 1 1.05 1.70 1.50 2.96 1.5 2.50 2.50 0.30 1.50 1.50 1.50 3.0 2.7 0.7 1.3 15.4 24.2 4.3 1.41 OK 4.3 0.0 4.3 0.0 0.0 0.6 0.4 12 48 0.04 0.0 12.0 7.9 19.1 12.6
SUB-TOTAL 4.3 0.0 4.3 0.0 0.0 0.6 0.4 12.0 47.9 0.0 0.0 0.0 12.0 0.0 7.9 19.1 12.6
BASIS TOTAL 788.7 2.7 25.8 602.7 157.5 102.5 47.7 546.0 4652.9 0.0 3.5 0.0 1477.8 0.0 734.3 2394.7 1397.7
1 THICKNESS OF LEAN CONCRETE (M)= 0.05
2 REBAR STEEL @ 0.13 TON/M3 0.13
3 FDN. DEPTH FROM GRADE 1.5 write "1" in the shaded block above between A/B and grout if it is epoxy grout
4 SOIL B. CAPACITY(TON/M2)= 20.0
5 J12, 30mm DIA A/BOLT WT/ BOLT (KG)= 4.0
6 J14, 48mm DIA A/BOLT WT/ BOLT (KG)= 16.5
6 FOUNDATION PROJECTION ABOVE GROUND(m) 0.3
7 EPOXY GROUT THICKNESS (MM) 50.0
8 GROUT (MM) 25.0
9 Seismic design coefficient to be used (Cd used) 0.17
10 COEFFICIENT OF FRICTION BET. SOIL AND FOUNDATION 0.30
HEAT EXCHANGER (AIR COOLER) EQUIPMENT FOUNDATION DATE: PRINT ON: 29/Apr
Project : Effluent Water Injection Phase 1 and Sea Water Injection Phase 2 PREPARED ON: 4-Feb-08
Project Code: PI-08001 REV: 0.0
No. Tag Description QTY Eqpt Dimension PAD DIMENSIONS Shelter Shelter TOTAL Individual Reinforced Concrete Foundation 30 N/mm2 REBAR LEAN A/BOLT A/B put 1 Non Shk. epoxy EXCV. B/F Polyethylene Bituminous
No. NOS Eq Wt L W L W THK Fdn Wt Nm/A Result Cladding Area CON CON STEEL CNCR NUMB, WT if grout grout Sheet Paint
M Te M M M M M Te T/M2 m2 M3 M3 0-3 3-10 10 - 50 >50 TON M3 KG epoxy M3 M3 M3 M3
SUB-TOTAL 2629.0 2629.0 0.0 0.0 0.0 2629.0 131.4 90.2 70 387.2 4.0 0.0 32.1 4511.4 2668.5 2148.1 343.6
BASIS TOTAL 2629.0 2629.0 0.0 0.0 0.0 2629.0 131.4 90.2 70 387.2 4.0 0.0 32.1 4511.4 2668.5 2148.1 343.6
1 THICKNESS OF LEAN CONCRETE (M)= 0.05
2 REBAR STEEL @ 0.05 TON/M3 0.05 * Anchor bolts assumed to be cast in pockets of size 200x200x500 deep, for pre embedded bolts for rotating eqpt
3 FDN. DEPTH FROM GRADE 1.50 write "1" in the shaded block above between A/B and grout if it is epoxy grout
4 SOILB. CAPACITY(TON/M2) (CONSIDERED HALF OF ALLOWABLE)= 20.0
5 ASUMED 24mm DIA A/BOLT WT/ BOLT (KG)= 5.5
6 FOUNDATION PROJECTION ABOVE GROUND(m) 0.50
7 GROUT (M) 25
TANK FOUNDATION DATE: PRINT ON: 29-Apr-20
Project : Effluent Water Injection Phase 1 and Sea Water Injection Phase 2 PREPARED ON: 17-Jan-08
Project Code: PI-08001 REV: 1
Conc. Ring wall tank fdn. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 21 18 22 20 19 23 21b 24
Av. height of Ring Beam Wall A/B Excav. in all Clean Sand Sand Gravel Gatch Compacted 1000g. Poly Asphalt Erosion 1000g. Poly Bituminous
Sl. Equipment Eqpt. No. of Tank If Tank Ring Beam Base Excav. below Back Disposal Blinding C-30 grade Reinf. Anchor Bolt Asphaltic 75mm dia Earth Dike Gravel Cal
compct. Fill above base TOTAL Weight soils & to sheet 1 mm board Protection sheet 1 mm Paint
No. Tag No. Tanks I. D. earthen Width thk Width Depth ring beam filling Conc. CON 0-3 3-10 10 - 50 >50 Sand 400 mm 100 mm 95% Dry Density Conc. Cover for Soil 25 mm PVC Pipe Earth Fill Lining Filter for Foundation 1 mm per
(M). put 1 (M.) (M) (M) (M) (M) (Cu.M.) (Cu.M.) (Cu.M.) (Cu.M.) (Cu.M.) (Cu.M.) (Cu.M.) (Cu.M.) (Cu.M.) (Te) nos. 36 dia Bolt (Cu.M.) (Cu. M.) (Cu. M.) (Cu. M.) (Cu.M.) (Sq. M.) (Sq.M) (M) (Cu.M.) (Sq. M.) (Cu.M.) (Sq. M.) (Sq. M.) type
(Te)
1 CIPF EFFLUENT WATER COLLECTION TANK D-1301 A/B 2 53 1.5 1.3 0.3 0.5 1.7 524.5 129.0 4769.9 25.0 412.9 0.0 0.0 0.0 412.9 49.55 670 10.05 4374.5 1731.8 433.0 6708.5 54.1 4329.5 167 162 17879.04 10848.47 3.1 2131.3 1598.4 ###
2 FIRE WATER STORAGE TANK D-2201 1 31.9 1.5 0.75 0.3 0.5 1.7 100.0 19.2 870.7 4.8 107.7 0.0 0.0 0.0 107.7 12.93 205 3.08 790.0 309.7 77.4 1235.7 16.6 774.4 50 50 0.00 0.00 0.9 531.1 425.9 ###
SUB TOTAL 624.5 148.2 5640.6 29.7 520.7 0.0 0.0 0.0 520.7 62.5 875.0 13.1 5164.4 2041.6 510.4 7944.2 70.7 5103.9 216.6 211.6 17879.0 10848.5 4.0 2662.4 2024.4
3 GC-15 WET CRUDE STORAGE TANK D-1003 1 36.5 1.5 1 0.3 0.5 1.7 144.5 32.3 1139.8 6.9 131.9 0.0 0.0 0.0 131.9 15.82 230 3.45 1027.6 407.2 101.8 1606.9 18.9 1017.9 57 55 4372.50 3131.41 1.0 665.1 516.0 ###
4 EFFLUENT WATER COLLECTION TANK D-1301 1 38.5 1.5 1 0.3 0.5 1.7 152.4 34.0 1265.7 7.3 139.1 0.0 0.0 0.0 139.1 16.69 245 3.68 1147.4 453.6 113.4 1785.4 19.9 1134.1 60 59 5313.00 3804.96 1.1 701.5 544.3 ###
SUB TOTAL 296.9 66.3 2405.5 14.1 271.0 0.0 0.0 0.0 271.0 32.5 475.0 7.1 2175.0 860.8 215.2 3392.3 38.7 2152.0 117.8 114.1 9685.5 6936.4 2.2 1366.6 1060.3 ###
5 GC-23 EFFLUENT WATER COLLECTION TANK D-1301 1 38.5 1.5 1 0.3 0.5 1.7 152.4 34.0 1265.7 7.3 139.1 0.0 0.0 0.0 139.1 16.69 245 3.68 1147.4 453.6 113.4 1785.4 19.9 1134.1 60 59 5244.07 3872.16 1.1 701.5 544.3
SUB TOTAL 152.4 34.0 1265.7 7.3 139.1 0.0 0.0 0.0 139.1 16.7 245.0 3.7 1147.4 453.6 113.4 1785.4 19.9 1134.1 60.5 59.4 5244.1 3872.2 1.1 701.5 544.3
6 GC-25 EFFLUENT WATER COLLECTION TANK D-1301 1 38.5 1.5 1 0.3 0.5 1.7 152.4 34.0 1265.7 7.3 139.1 0.0 0.0 0.0 139.1 16.69 245 3.68 1147.4 453.6 113.4 1785.4 19.9 1134.1 60 59 7319.91 4126.89 1.1 701.5 544.3
SUB TOTAL 152.4 34.0 1265.7 7.3 139.1 0.0 0.0 0.0 139.1 16.7 245.0 3.7 1147.4 453.6 113.4 1785.4 19.9 1134.1 60.5 59.4 7319.9 4126.9 1.1 701.5 544.3 ###
TOTAL 1226.1 282.6 10577.6 58.4 1069.8 0.0 0.0 0.0 1069.8 128.4 1840.0 27.6 9634.1 3809.6 952.4 14907.4 149.1 9524.1 455.4 444.7 40128.5 25783.9 8.4 5432.0 4173.2###
163.1414
Basic Parameters : 149.1319
Thickness of blinding concrete 50 mm 12446.369553 14.00951
Off-set of blinding concrete 100 mm 12445.637633
Projection of ring beam above ground 1000 mm 0.7319204884
Depth of excav. below tank for dressing 1000 mm
Thickness of Clean Sand 400 mm
Thickness of Sand Gravel 100 mm
Reinforcement-concrete ratio in ring beam 120 kg / Cu.M.
Thickness of Asphaltic Concrete 75 mm
75mm dia PVC pipe length 2.378 m 5% slope
Asphalt board width 500 mm 1.5 a1
Compacted Gatch outside tanks section area (a1) 0.0106 m2 1 750 - 75
Compacted Gatch outside tanks section area (a2) 0.4176 m2 a3 a2
Main Dike Intermediete Dike earth dike earth dike earth dike
Sl. Equipment Equpt. No. of Tank
Perimeter Perimeter protection
If Dike Put 1 TW BW H (dike) A Perimeter TW BW H (dike) A X Y Perimeter perimeter earth fill
No. Tag No. Tanks I. D. Length Width lining
(M). m m m m2 m m m m m m m2 m m m m m3 m2
1 EFFLUENT WATER COLLECTION TANK (CIPF) D-1301 A/B 2 53 1 1 11.80 3.6 23.04 105.00 89.00 388.00 388.00 17879.04 10848.47
2 FIRE WATER STORAGE TANK (CIPF) D-2201 1 31.9 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 WET CRUDE STORAGE TANK (GC-15) D-1003 1 36.5 1 1 10.00 3 16.50 89.00 87.00 265.00 265.00 4372.50 3131.41
4 EFFLUENT WATER COLLECTION TANK (GC-15) D-1301 1 38.5 1 1 10.00 3 16.50 87.00 74.00 235.00 1 10.00 3 16.50 0.00 87.00 87.00 322.00 5313.00 3804.96
5 EFFLUENT WATER COLLECTION TANK (GC-23) D-1301 1 38.5 1 1 9.70 2.9 15.52 105.00 64.00 338.00 338.00 5244.07 3872.16
6 EFFLUENT WATER COLLECTION TANK (GC-25) D-1301 1 38.5 1 1 12.70 3.9 26.72 79.50 57.50 274.00 274.00 7319.91 4126.89
TOTAL 1587.00 40128.52 25783.90
COMPRESSOR
1 Z-2102 A/B PLANT AIR COMPRESSOR PACKAGE 1 5.0 6.0 2.5 6.50 3.00 2.50 117.00 15.6 6.4 Ok 48.8 48.8 0.0 0.0 48.8 0.0 2.4 1.1 8 41.3 1 0.0 0.49 33.7 12.3 5.9 60.4 38.0
2 Z-2103 A/B/C INSTRUMENT AIR COMPRESSOR PACKAGE 1 10.0 8.0 3.5 8.50 4.00 2.50 204.00 13.6 6.4 Ok 85.0 85.0 0.0 0.0 0.0 85.0 4.3 1.9 10 52.3 1 0.0 0.79 56.8 20.8 7.7 87.8 50.0
SUB-TOTAL 7592.1 1211.4 0.0 16.6 5569.1 2006.5 379.6 215.5 1193 6562.1 22.0 0.0 30.4 6635.3 33.2 761.0 9231.6 4920.7
GATHERING CENTRE 15(GC - 15)
1 PUMP 0.0
2 G-I301 BALANCE TANK FEED PUMP (FROM TK-1378) 1 3.0 4.00 1.80 4.60 2.40 2.00 52.99 11.78 5.21 Ok 22.1 22.1 0.0 0.0 22.1 0.0 1.1 0.7 6 30.8 1 0.0 0.31 20.5 3.3 34.2 21.0
3 G-I302 BALANCE TANK FEED PUMP (FROM TK-1001) 1 3.0 4.00 1.80 4.60 2.40 2.00 52.99 11.78 5.21 Ok 22.1 22.1 0.0 0.0 22.1 0.0 1.1 0.7 6 30.8 1 0.0 0.31 20.5 3.3 34.2 21.0
4 G-I303 A/B/C BALANCE TANK FEED PUMP (FROM D-1003) 3 3.0 4.00 1.80 4.60 2.40 2.00 52.99 11.78 5.21 Ok 66.2 22.1 0.0 0.0 66.2 0.0 3.3 2.0 17 92.4 1 0.0 0.92 61.5 9.9 102.7 63.0
5 G-I304 A/B/C EFFLUENT WATER TRANSFER PUMP 3 3.75 2.40 3.55 3.00 4.15 2.00 59.76 10.62 5.25 Ok 74.7 24.9 0.0 0.0 74.7 0.0 3.7 2.2 12 66.0 1 0.0 0.89 68.3 10.1 108.4 64.4
6 G-I307 A/B RECOVERED OIL PUMP 2 1.5 2.40 1.70 3.00 2.30 2.00 33.12 14.72 5.13 Ok 27.6 13.8 0.0 0.0 27.6 0.0 1.4 0.9 8 44.0 1 0.0 0.28 26.6 5.0 49.0 31.8
7 G-1741 BIOCIDE ‘A’ TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
8 G-1742 BIOCIDE ‘B’ TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
9 G-1743 DEMULSIFIER TEANSPER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
10 G-1744 CORROSION INHIBITOR TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
11 G-1745 SCALE INHIBITOR TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
12 G-1746 OXYGEN SCAVENGER TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
13 G-1747 REVERSE DEMULSIFIER TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
14 G-XXXX CHEMICAL TRANSFER PUMP (SPARE) 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
15 G-XXXX CHEMICAL TRANSFER PUMP (SPANE) 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
ROTATING EQUIPMENT FOUNDATION DATE: PRINT ON: 29/Apr
Project : KOC Effluent Water PREPARED ON: Jan. 20.01.2008
Project Code: PI-08001 REV: 0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 30 31 32 33
No. Tag Description QTY Eqpt Dimension PAD DIMENSIONS Shelter Shelter TOTAL Individual Reinforced Concrete Foundation 30 N/mm2 REBAR LEAN A/BOLT A/B put 1 Non Shk. epoxy EXCV. B/F Polyethylene Bituminous
No. NOS Eq Wt L W L W THK Fdn Wt Ratio Nm/A Result Cladding Area CON CON STEEL CNCR NUMB, WT if grout grout 0-1.5 m >1.5 m Sheet Paint
M Te M M M M M Te T/M2 m2 M3 M3 0-3 3-10 10 - 50 >50 TON M3 KG epoxy M3 M3 M3 M3 M3 M2 M2
16 G-1901 CHEMICAL DRAIN SUMP PUMP 1 1.0 2.50 1.30 3.10 1.90 2.00 28.27 18.85 5.05 Ok 11.8 11.8 0.0 0.0 11.8 0.0 0.6 0.4 4 22.6 1 0.0 0.13 11.6 2.4 22.5 15.0
17 G-1902 BIOCIDE DRAIN SUMP PUMP 1 1.0 2.50 1.30 3.10 1.90 2.00 28.27 18.85 5.05 Ok 11.8 11.8 0.0 0.0 11.8 0.0 0.6 0.4 4 22.6 1 0.0 0.13 11.6 2.4 22.5 15.0
PACKAGE
1 Z-1302 Tank Solid removal package for D-D-1003 & D-1301 1
2 Z-1701/2 BIOCIDE CHEMICAL INIECTION PACKAGE 1 4.0 5.0 3.0 5.50 3.50 2.00 92.40 15.4 5.1 Ok 38.5 38.5 0.0 0.0 38.5 0.0 1.9 1.1 7 35.8 0.0 0.00 34.2 4.2 49.0 27.0
3 Z-1703 DEMULSIFIER CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
4 Z-1704 CORROSION INHIBITOR CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
5 Z-1705 SCALE INHIBITOR CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
6 Z-1706 OXYGEN SCAVENGER CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
7 Z-1707 REVERSE DEMULSIFIER CHEMICAL INJECTION PACKAGE 1 4.0 3.0 3.0 3.50 3.50 2.00 58.80 9.8 5.3 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
EJECTORS
1 G-1308 RECOVERED OIL TANK EJECTOR 1 2
2 G-1309 RECOVERED OIL TANK PIT EJECTOR 1 2
SUB-TOTAL 504.2 0.0 0.0 504.2 0.0 25.2 16.2 124 681.5 0.0 4.37 458.5 0.0 73.1 789.8 465.8
GATHERING CENTRE 23(GC - 23)
1 PUMP 0.0
2 G-I301 A/B BALANCE TANK FEED PUMP (FROM T-01) 2 3.5 4.00 2.40 4.60 3.00 2.00 66.24 12.62 5.18 Ok 55.2 27.6 0.0 0.0 55.2 0.0 2.8 1.6 11 61.6 1 0.0 0.71 50.1 7.1 77.9 45.6
3 G-I302 A/B BALANCE TANK FEED PUMP (FROM T-91) 2 3.5 4.00 2.40 4.60 3.00 2.00 66.24 12.62 5.18 Ok 55.2 27.6 0.0 0.0 55.2 0.0 2.8 1.6 11 61.6 1 0.0 0.71 50.1 7.1 77.9 45.6
4 G-I303 A/B BALANCE TANK FEED PUMP (FROM T-07) 2 3.5 4.00 2.40 4.60 3.00 2.00 66.24 12.62 5.18 Ok 55.2 27.6 0.0 0.0 55.2 0.0 2.8 1.6 11 61.6 1 0.0 0.71 50.1 7.1 77.9 45.6
5 G-I304 A/B/C EFFLUENT WATER TRANSFER PUMP 3 3.75 3.55 2.40 4.15 3.00 2.00 59.76 10.62 5.25 Ok 74.7 24.9 0.0 0.0 74.7 0.0 3.7 2.2 16 85.8 1 0.0 0.97 68.3 10.1 108.4 64.4
6 G-I307 A/B RECOVERED OIL PUMP 2 1.5 2.40 1.70 3.00 2.30 2.00 33.12 14.72 5.13 Ok 27.6 13.8 0.0 0.0 27.6 0.0 1.4 0.9 8 44.0 1 0.0 0.28 26.6 5.0 49.0 31.8
7 G-1741 BIOCIDE ‘A’ TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
8 G-1742 BIOCIDE ‘B’ TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
9 G-1743 CORROSION INHIBITOR TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
10 G-1744 SCALE INHIBITOR TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
11 G-1745 OXYGEN SCAVENGER TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
12 G-1746 REVERSE DEMULSIFIER TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
13 G-XXXX CHEMICAL TRANSFER PUMP (SPARE) 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
14 G-XXXX CHEMICAL TRANSFER PUMP (SPARE) 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
15 G-1901 CHEMICAL DRAIN SUMP PUMP 1 1.0 2.50 1.30 3.10 1.90 2.00 28.27 18.85 5.05 Ok 11.8 11.8 0.0 0.0 11.8 0.0 0.6 0.4 4 22.6 1 0.0 0.13 11.6 2.4 22.5 15.0
16 G-1902 BIOCIDE DRAIN SUMP PUMP 1 1.0 2.50 1.30 3.10 1.90 2.00 28.27 18.85 5.05 Ok 11.8 11.8 0.0 0.0 11.8 0.0 0.6 0.4 4 22.6 1 0.0 0.13 11.6 2.4 22.5 15.0
PACKAGE
1 Z-1302 Tank Solid removal package for D-1301 1
2 Z-1701/2 BIOCIDE CHEMICAL INIECTION PACKAGE 2 4.0 5.0 3.0 5.50 3.50 2.00 92.40 15.4 5.1 Ok 77.0 38.5 0.0 0.0 77.0 0.0 3.9 2.2 13 71.5 0.0 0.00 68.3 8.4 98.1 54.0
3 Z-1703 CORROSION INHIBITOR CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
4 Z-1704 SCALE INHIBITOR CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
5 Z-1705 OXYGEN SCAVENGER CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
6 Z-1706 REVERSE DEMULSIFIER CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
1 EJECTORS 0.0
2 G-1311 RECOVERED OIL TANK EJECTOR 1 2.0
3 G-1312 RECOVERED OIL TANK PIT EJECTOR 1 2.0
SUB-TOTAL 561.5 376.6 0.0 0.0 561.5 0.0 28.1 17.6 131 719.4 15.0 0.0 4.9 508.0 0.0 77.1 844.9 492.2
GATHERING CENTRE 25(GC - 25)
PUMP
1 G-I301 A/B/C EFFLUENT WATER TRANSFER PUMP 3 3.8 3.55 2.40 4.15 3.00 2.00 59.76 10.62 5.25 Ok 74.7 24.9 0.0 0.0 74.7 0.0 3.7 2.2 16 85.8 1 0.0 0.97 68.3 10.1 108.4 64.4
2 G-I304 A/B RECOVERED OIL PUMP 2 1.0 1.80 1.30 2.40 1.90 2.00 21.89 14.59 5.13 Ok 18.2 9.1 0.0 18.2 0.0 0.0 0.9 0.6 7 37.4 1 0.0 0.22 18.4 4.1 37.7 25.8
3 G-I305 A/B BALANCE TANK FEED PUMP (FROM D-1102) 2 2.7 4.70 1.60 5.30 2.20 2.00 55.97 13.82 5.15 Ok 46.6 23.3 0.0 0.0 46.6 0.0 2.3 1.4 13 69.3 1 0.0 0.66 43.4 7.0 73.0 45.0
4 G-I306 A/B BALANCE TANK FEED PUMP (FROM D-1103) 2 2.7 4.70 1.60 5.30 2.20 2.00 55.97 13.82 5.15 Ok 46.6 23.3 0.0 0.0 46.6 0.0 2.3 1.4 13 69.3 1 0.0 0.66 43.4 7.0 73.0 45.0
5 G-I307 RECOVERED OIL TANK EJECTOR 1 2.0 4.30 1.80 4.90 2.40 2.00 56.45 18.82 5.06 Ok 23.5 23.5 0.0 0.0 23.5 0.0 1.2 0.7 6 32.5 1 0.0 0.22 21.8 3.4 35.9 21.9
6 G-I308 RECOVERED OIL TANK PIT EJECTOR 1 2.0 4.30 1.80 4.90 2.40 2.00 56.45 18.82 5.06 Ok 23.5 23.5 0.0 0.0 23.5 0.0 1.2 0.7 6 32.5 1 0.0 0.22 21.8 3.4 35.9 21.9
7 G-1741 BIOCIDE ‘A’ TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
8 G-1742 BIOCIDE ‘B’ TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
9 G-1743 CORROSION INHIBITOR TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
10 G-1744 SCALE INHIBITOR TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
11 G-1745 OXYGEN SCAVENGER TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
12 G-1746 REVERSE DEMULSIFIER TRANSFER PUMP 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
13 G-XXXX CHEMICAL TRANSFER PUMP (SPARE) 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
14 G-XXXX CHEMICAL TRANSFER PUMP (SPARE) 1 0.2 2.70 1.80 3.30 2.40 1.50 28.51 95.04 3.64 Ok 11.9 11.9 0.0 0.0 11.9 0.0 0.6 0.5 4 23.7 1 0.0 0.16 10.2 1.8 21.1 11.4
15 G-1901 CHEMICAL DRAIN SUMP PUMP 1 1.0 2.50 1.30 3.10 1.90 2.00 28.27 18.85 5.05 Ok 11.8 11.8 0.0 0.0 11.8 0.0 0.6 0.4 4 22.6 1 0.0 0.13 11.6 2.4 22.5 15.0
ROTATING EQUIPMENT FOUNDATION DATE: PRINT ON: 29/Apr
Project : KOC Effluent Water PREPARED ON: Jan. 20.01.2008
Project Code: PI-08001 REV: 0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 30 31 32 33
No. Tag Description QTY Eqpt Dimension PAD DIMENSIONS Shelter Shelter TOTAL Individual Reinforced Concrete Foundation 30 N/mm2 REBAR LEAN A/BOLT A/B put 1 Non Shk. epoxy EXCV. B/F Polyethylene Bituminous
No. NOS Eq Wt L W L W THK Fdn Wt Ratio Nm/A Result Cladding Area CON CON STEEL CNCR NUMB, WT if grout grout 0-1.5 m >1.5 m Sheet Paint
M Te M M M M M Te T/M2 m2 M3 M3 0-3 3-10 10 - 50 >50 TON M3 KG epoxy M3 M3 M3 M3 M3 M2 M2
16 G-1902 BIOCIDE DRAIN SUMP PUMP 1 1.0 2.50 1.30 3.10 1.90 2.00 28.27 18.85 5.05 Ok 11.8 11.8 0.0 0.0 11.8 0.0 0.6 0.4 4 22.6 1 0.0 0.13 11.6 2.4 22.5 15.0
PACKAGE
1 Z-1302 Tank Solid removal package for D-1301 1
2 Z-1701/2 BIOCIDE CHEMICAL INIECTION PACKAGE 2 4.0 5.0 3.0 5.50 3.50 2.00 92.40 15.4 5.1 Ok 77.0 38.5 0.0 0.0 77.0 0.0 3.9 2.2 13 71.5 0.0 0.00 68.3 8.4 98.1 54.0
3 Z-1703 CORROSION INHIBITOR CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
4 Z-1704 SCALE INHIBITOR CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
5 Z-1705 OXYGEN SCAVENGER CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
6 Z-1706 REVERSE DEMULSIFIER CHEMICAL INJECTION PACKAGE 1 2.5 3.0 3.0 3.50 3.50 2.00 58.80 15.7 5.1 Ok 24.5 24.5 0.0 0.0 24.5 0.0 1.2 0.7 5 24.8 0.0 0.00 22.4 3.3 35.4 21.0
SUB-TOTAL 526.9 0.0 18.2 508.6 0.0 26.3 16.7 133 731.5 16.0 0.0 4.5 479.7 0.0 75.8 817.7 483.2
SEA WATER TREATMENT PLANT(SWTP)
PUMP
1 G-1001 FILTER FEED PUMP 1 7.0 6.30 3.30 6.90 3.90 2.00 129.17 12.30 5.19 Ok 53.8 53.8 0.0 0.0 0.0 53.8 2.7 1.5 8 43.5 1 0.0 0.63 46.9 5.0 62.6 32.4
2 G-1002 TRANSFER PUMP 1 12.0 7.80 5.30 8.40 5.90 2.00 237.89 13.22 5.16 Ok 99.1 99.1 0.0 0.0 0.0 99.1 5.0 2.7 9 51.7 1 0.0 1.06 83.6 6.6 96.8 42.9
OTHERS
1 L-1001 FEED FILTER 25.0
SUB-TOTAL 152.9 152.9 0.0 0.0 0.0 152.9 7.6 4.2 17 95.2 2.0 0.0 1.7 130.5 0.0 11.6 159.5 75.3
BASIS TOTAL 9337.6 1740.9 0.0 34.8 7143.4 2159.4 466.9 270.3 1598 8789.6 55.0 0.0 45.7 8211.9 33.2 998.5 11843.6 6437.1
1 THICKNESS OF LEAN CONCRETE (M)= 0.05
2 REBAR STEEL @ 0.05 TON/M3 0.05 * Anchor bolts assumed to be cast in pockets of size 200x200x500 deep, for pre embedded bolts for rotating eqpt
3 FDN. DEPTH FROM GRADE 1.50 write "1" in the shaded block above between A/B and grout if it is epoxy grout
4 SOILB. CAPACITY(TON/M2) (CONSIDERED HALF OF ALLOWABLE)= 15.0
5 SOILB. CAPACITY(TON/M2) (CONSIDERED HALF OF ALLOWABLE)= 20.0
6 ASUMED 24mm DIA A/BOLT WT/ BOLT (KG)= 5.5
7 FOUNDATION PROJECTION ABOVE GROUND(m) 0.50
8 EPOXY GROUT THICKNESS (MM) 50
9 GROUT (M) 25
10 FDN. DEPTH FROM GRADE FOR COMPRESSOR AND GTG = 1
FDN. DEPTH FROM GRADE FOR COMPRESSOR AND GTG CASE 1= 1.5
FDN. DEPTH FROM GRADE FOR COMPRESSOR AND GTG CASE 2= 2
11 OPERATING WEIGHT / EMPTY WEIGHT 1.5
ANALYSER FOUNDATION DATE: PRINT ON: 29/Apr
Project : KOC Effluent Water PREPARED ON: Jan. 20.01.2008
Project Code: PI-08001 REV: 0.0
No. Description QTY PAD DIMENSIONS TOTAL Individual Reinforced Concrete Foundation 30 N/mm2 REBAR LEAN A/BOLT A/B put 1 Non Shk. epoxy EXCV. B/F Polyethylene Bituminous
NOS L W THK Fdn Wt CON CON STEEL CNCR NUMB, WT if grout grout Sheet Paint
M M M M Te M3 M3 0-3 3-10 10 - 50 >50 TON M3 KG epoxy M3 M3 M3 M3 M2 M2
SUB-TOTAL 9.0 0.9 9.0 0.0 0.0 0.0 0.5 2.1 0.0 0.0 0.0 0.0 0.0 10.4 2.3 55.4 14.0
GATHERING CENTRE 15(GC - 15)
1 ANALYSER FOUNDATION (1,5 X 2 X 0,3) 1 2.00 1.50 0.30 2.16 0.9 0.9 0.9 0.0 0.0 0.0 0.0 0.2 0 0.0 0.0 0.00 1.0 0.2 5.5 1.4
SUB-TOTAL 0.9 0.9 0.9 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.00 1.0 0.2 5.5 1.4
GATHERING CENTRE 23(GC - 23)
1 ANALYSER FOUNDATION (1,5 X 2 X 0,3) 1 2.00 1.50 0.30 2.16 0.9 0.9 0.9 0.0 0.0 0.0 0.0 0.2 0 0.0 0.0 0.00 1.0 0.2 5.5 1.4
SUB-TOTAL 0.9 0.9 0.9 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 1.0 0.2 5.5 1.4
GATHERING CENTRE 25(GC - 25)
1 ANALYSER FOUNDATION (1,5 X 2 X 0,3) 1 2.00 1.50 0.30 2.16 0.9 0.9 0.9 0.0 0.0 0.0 0.0 0.2 0 0.0 0.0 0.00 1.0 0.2 5.5 1.4
SUB-TOTAL 0.9 0.9 0.9 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.0 0.0 0.0 1.0 0.2 5.5 1.4
SEA WATER TREATMENT PLANT(SWTP)
1 ANALYSER FOUNDATION (1,5 X 2 X 0,3) 0 2.00 1.50 0.30 2.16 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.00 0.0 0.0 0.0 0.0
SUB-TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
BASIS 11.7 3.6 11.7 0.0 0.0 0.0 0.6 2.7 0.0 0.0 0.0 0.0 0.0 13.5 3.0 72.0 18.2
1 THICKNESS OF LEAN CONCRETE (M)= 0.05
2 REBAR STEEL @ 0.05 TON/M3 0.05
3 FDN. DEPTH FROM GRADE 0.20
4 SOILB. CAPACITY(TON/M2) (CONSIDERED HALF OF ALLOWABLE)= 20.0
5 ASUMED 24mm DIA A/BOLT WT/ BOLT (KG)= 5.5
6 FOUNDATION PROJECTION ABOVE GROUND(m) 0.10
7 GROUT (M) 25