Installation of Foundation Grounding
Installation of Foundation Grounding
Installation of Foundation Grounding
1. Safety Procedures
a. Submit all documents as required by our Safety department prior to
safety orientation.
b. Ensure all contractor employees working on electrical equipment and
installations are qualified, competent, electricians.
c. Ensure all contractor employees attend the plant safety orientation
sessions.
d. Ensure safe mobilization of equipment to and from plant.
e. Issue all employees with the correct PPE for each task and ensure that
they are worn at all times.
f. Supply correct and quality tools to its employees to enable safe,
effective, efficient and high quality workmanship.
g. Each welding machine shall comply with EN ISO 60974-1, or be fitted
with a Voltage Reducing Device
h. Portable electrical equipment shall be double insulated (no metal drilling
machines, or angle grinders, etc.)
i. All welding machines and portable electrical equipment shall be
connected to a power socket that is protected by a Residual Current
Device (RCD). If the existing installations are not fitted with RCDs,
portable RCDs shall be supplied and used by the contractor.
j. Ensure that its employees comply with all Holcim Safety Regulations
and carry out their tasks in a safe and efficient manner.
k. Prohibit the use of substandard tools by its employees.
l. Obtain all necessary work and safety permits prior to commencement of
works.
m. All tools and equipment to be used, must be inspected, approved and
tagged by the Safety Department prior to commencement of work.
n. All works shall comply with the Holcim Design Criteria. A copy will be
furnished by the project proponent during the conduct of pre-bidding.
o. LOTO procedure at main breaker to be applied by Proponent.
Contractor to be equipped personal lock per equipment. Padlock shall
have identification tag (contractor's name and contact number)
p. Assess surroundings for safe conduct of the activity
2. Specific Required tools
Safety PPE’s
Safety helmet
Dust mask
Safety Goggles
Safety Shoes
Reflectorized shirt/vest
3. Scope of Supply:
Contractor shall supply the following materials required to complete the job
but not limited to:
1 lot - Solid barricades, caution tapes
40 pieces - Galvanized steel bracket (size depends on the length and
width until reaching the 3 main members of rebar)
1 lot - grout
1 lot - Exothermic Welding materials
30 pieces - IMC pipes, 25mm diameter
20 length - unit strut channels, galvanized iron material
200 meters - 95mm2 x 1C, bare copper
1 assembly - Potential Equalization Box (PEB) with 25mm x 5mm x
200mm bus bar
3 pieces - 25mm diameter grounding rod (quantity may vary based on
the 2 ohms grounding resistance measurement)
30 pieces - UPVC pipes, 25mm diameter
2 boxes - 14mm2 x 1C, THHN cable, green
1 lot - brass glands
1 lot - bus bars for LVD grounding
Holcim supply to the following materials to complete the job:
Cement and aggregates
4. Scope of Work